New Launch - India Real Estate Report 2026.

GREENWOOD RESIDENTIAL SCHEME

Gorakhpur Development Authority

Gorakhpur, Uttar Pradesh

RERA approved

Approved

20th Feb 2024

Completion pending

Pending

19th Feb 2029

Registration No.

UPRERAPRJ839480/07/2024

Project Type

Residential

District

Gorakhpur

Taluka

Gorakhpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ839480/07/2024
Project StatusNew
Project CategoryResidential
DistrictGorakhpur
TalukaGorakhpur
Start Date2024-02-20
Completion Date2029-02-19
Total Area (sqm)21057
Project Cost (Lacs)46724
Duration (Months)60
Registration Fee110500

Promoter Details

Promoter NameGorakhpur Development Authority
Promoter IDUPRERAPRM14553
Mobile96********

Project Team

rolename
ArchitectBINDRESH KUMAR SAHANI
ContractorMS BHARAT NAGAR HOUSING
Structural EngineerOSAMA ALMAS

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra169M6474.97
Khasra17080.94
Khasra1712630.46
Khasra173M2023.43
Khasra205M2630.46
Khasra206M283.28
Khasra2091375.93
Khasra207M4046.86
Khasra208M323.75
Khasra215M1214.06

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER1BSMNTOTHER00-
TOWER1GF4 BHK6125.380
TOWER114 BHK6125.38-
TOWER124 BHK6125.38-
TOWER134 BHK6125.38-
TOWER144 BHK6125.38-
TOWER154 BHK6125.38-
TOWER164 BHK6125.38-
TOWER174 BHK6125.38-
TOWER184 BHK6125.38-
TOWER194 BHK6125.38-
TOWER1104 BHK6125.38-
TOWER1114 BHK6125.38-
TOWER1124 BHK6125.38-
TOWER1134 BHK6125.38-
TOWER1144 BHK6125.38-
TOWER2BSMNTOTHER00-
TOWER2GF4 BHK6125.380
TOWER214 BHK6125.38-
TOWER224 BHK6125.38-
TOWER234 BHK6125.38-
TOWER244 BHK6125.38-
TOWER254 BHK6125.38-
TOWER264 BHK6125.38-
TOWER274 BHK6125.38-
TOWER284 BHK5125.38-
TOWER294 BHK6125.38-
TOWER2104 BHK6125.38-
TOWER2114 BHK6125.38-
TOWER2124 BHK6125.38-
TOWER2134 BHK6125.38-
TOWER2144 BHK6125.38-
TOWER 1BSMNTOTHER00-
TOWER 1GF3 BHK1693.860
TOWER 113 BHK1693.86-
TOWER 123 BHK1693.86-
TOWER 133 BHK1693.86-
TOWER 143 BHK1693.86-
TOWER 153 BHK1693.86-
TOWER 163 BHK1693.86-
TOWER 173 BHK1693.86-
TOWER 183 BHK1693.86-
TOWER 193 BHK1693.86-
TOWER 1103 BHK1693.86-
TOWER 1113 BHK1693.86-
TOWER 1123 BHK1693.86-
TOWER 1133 BHK1693.86-
TOWER 1143 BHK1693.86-
TOWER 2BSMNTOTHER00-
TOWER 2GF3 BHK493.860
TOWER 213 BHK493.86-
TOWER 223 BHK493.86-
TOWER 233 BHK493.86-
TOWER 243 BHK493.86-
TOWER 253 BHK493.86-
TOWER 263 BHK493.86-
TOWER 273 BHK493.86-
TOWER 283 BHK493.86-
TOWER 293 BHK493.86-
TOWER 2103 BHK493.86-
TOWER 2113 BHK493.86-
TOWER 2123 BHK493.86-
TOWER 2133 BHK493.86-
TOWER 2143 BHK493.86-

Development Works

work_namedescription
Demarcation of PlotsPLOTS HAS BEEN DEMARCATED.
Boundary WallBoundary wall will be RCC with M25 and proper foundation as required. Wall high will be 1.2mtr RCC wall from road level 45 cm mild steel grill, gates and its locking arrangements.
Road WorkEXTERNAL ROADS AND DEVELOPMENT ALREADY EXISTED. INTERNAL ROADS TO BE CONSTRUCTED.
FootpathsInternal roads and pathway with CC, bitumen and factory made CC paver block over required compacted bed of WMM GSB. Footpath will be factory made paver block 80 or 60 mm thickness as required.
Water Supply Including Drinking Water FacilitiesInternal water supply as per design required with the various of CPVC pipes of schedule.
Sewer SystemLaying of sewer line connect with flat sewerage of varies dia as per norms including man hole, chamber also include stp as required capacity.
DrainStorm water drains will be RCC wall and RCC crossing road as per design.
ParksPark will be made in green area with sufficient lightning (High mast), benches, children play equipment etc. Entry and exit gates with locking arrangements.
Tree PlantingIT WILL BE DONE AS PER NORMS.
Design For Electric Supply Including Street LightingInternal electrifications will include outer electric lines, poles, street lights, cables, transformers of required capacity of the scheme.
Community Buildingsconstruction of club will be done.
Treatment and Disposal System of Sewage and Sullage waterSewage will be treated by means of DSTP on zero liquid d discharge.
Solid Waste Management And Disposal SystemSolid Waste Management And Disposal System will be provided as per norms.
Water Conservation Systemas per norms.
Energy Management System Including Use of Renewable EnergyEnergy Management System Including Use of Renewable Energy will be provided as required.
Fire Protection And Fire Safety SystemFire Protection And Fire Safety System has to be provided for citizens and scheme safety.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSocial Infrastructure And Other Public Amenities Including Public Health Services is already developed in our nearby townships.
Emergency Evacuation ServicesEmergency Evacuation Services is already developed in our nearby townships.
Other Miscellaneous WorkAll area covered spacing with plantations of approved species of plant.

Bank Details

Bank NameHDFC BANK
BranchBANK ROAD GORAKHPUR
Branch AddressBANK ROAD GORAKHPUR
Account HolderGDA COLLECTION AC FOR GW RES SCHEME
Account Number99943000012345
IFSC CodeHDFC0000284

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy