New Launch - India Real Estate Report 2026.

Paalm Paradise Phase-VI

Aisshpra Lifespaces

Gorakhpur, Uttar Pradesh

RERA approved

Approved

14th May 2022

Completion pending

Pending

9th May 2027

Registration No.

UPRERAPRJ579258

Project Type

Residential

District

Gorakhpur

Taluka

Gorakhpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ579258
Project StatusNew
Project CategoryResidential
DistrictGorakhpur
TalukaGorakhpur
Start Date2022-05-14
Completion Date2027-05-09
Total Area (sqm)11132
Project Cost (Lacs)8196
Duration (Months)60
Registration Fee61000

Promoter Details

Promoter NameAisshpra Lifespaces
Promoter IDUPRERAPRM17815
Mobile77********

Project Team

rolename
ArchitectAashish Srivastava C/o Acore Architectural Services Pvt Ltd
ContractorPadmakar Tripathi C/o M/s Avayava Construction Company
Structural EngineerEr. Satyanam Saran C/o Shekhar Design Centre

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1198 1198/2 1200/1 1200/2 1200/311132

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
K14 BHK1156.45-
K13 BHK1129.20-
K13 BHK1129.13-
K14 BHK1155.92-
K24 BHK1156.45-
K23 BHK1129.20-
K23 BHK1129.13-
K24 BHK1155.92-
K34 BHK1156.45-
K33 BHK1129.20-
K33 BHK1129.13-
K34 BHK1155.92-
K44 BHK1156.45-
K43 BHK1129.20-
K43 BHK1129.13-
K44 BHK1155.92-
K54 BHK1156.45-
K53 BHK1129.20-
K53 BHK1129.13-
K54 BHK1155.92-
K64 BHK1156.45-
K63 BHK1129.20-
K63 BHK1129.13-
K64 BHK1155.92-
K74 BHK1156.45-
K73 BHK1129.20-
K73 BHK1129.13-
K74 BHK1155.92-
K84 BHK1156.45-
K83 BHK1129.20-
K83 BHK1129.13-
K84 BHK1155.92-
K94 BHK1156.45-
K93 BHK1129.20-
K93 BHK1129.13-
K94 BHK1155.92-
K104 BHK1156.45-
K103 BHK1129.20-
K103 BHK1129.13-
K104 BHK1155.92-
K114 BHK1156.45-
K113 BHK1129.20-
K113 BHK1129.13-
K114 BHK1155.92-
K124 BHK1156.45-
K123 BHK1129.20-
K123 BHK1129.13-
K124 BHK1155.92-
K134 BHK1156.45-
K133 BHK1129.20-
K133 BHK1129.13-
K134 BHK1155.92-
K144 BHK1156.45-
K143 BHK1129.20-
K143 BHK1129.13-
K144 BHK1155.92-
L14 BHK1156.45-
L13 BHK1129.20-
L13 BHK1129.13-
L14 BHK1155.92-
L24 BHK1156.45-
L23 BHK1129.20-
L23 BHK1129.13-
L24 BHK1155.92-
L34 BHK1156.45-
L33 BHK1129.20-
L33 BHK1129.13-
L34 BHK1155.92-
L44 BHK1156.45-
L43 BHK1129.20-
L43 BHK1129.13-
L44 BHK1155.92-
L54 BHK1156.45-
L53 BHK1129.20-
L53 BHK1129.13-
L54 BHK1155.92-
L64 BHK1156.45-
L63 BHK1129.20-
L63 BHK1129.13-
L64 BHK1155.92-
L74 BHK1156.45-
L73 BHK1129.20-
L73 BHK1129.13-
L74 BHK1155.92-
L84 BHK1156.45-
L83 BHK1129.20-
L83 BHK1129.13-
L84 BHK1155.92-
L94 BHK1156.45-
L93 BHK1129.20-
L93 BHK1129.13-
L94 BHK1155.92-
L104 BHK1156.45-
L103 BHK1129.20-
L103 BHK1129.13-
L104 BHK1155.92-
L114 BHK1156.45-
L113 BHK1129.20-
L113 BHK1129.13-
L114 BHK1155.92-
L124 BHK1156.45-
L123 BHK1129.20-
L123 BHK1129.13-
L124 BHK1155.92-
L134 BHK1156.45-
L133 BHK1129.20-
L133 BHK1129.13-
L134 BHK1155.92-
L144 BHK1156.45-
L143 BHK1129.20-
L143 BHK1129.13-
L144 BHK1155.92-
M14 BHK1156.45-
M13 BHK1129.20-
M13 BHK1129.13-
M14 BHK1155.92-
M24 BHK1156.45-
M23 BHK1129.20-
M23 BHK1129.13-
M24 BHK1155.92-
M34 BHK1156.45-
M33 BHK1129.20-
M33 BHK1129.13-
M34 BHK1155.92-
M44 BHK1156.45-
M43 BHK1129.20-
M43 BHK1129.13-
M44 BHK1155.92-
M54 BHK1156.45-
M53 BHK1129.20-
M53 BHK1129.13-
M54 BHK1155.92-
M64 BHK1156.45-
M63 BHK1129.20-
M63 BHK1129.13-
M64 BHK1155.92-
M74 BHK1156.45-
M73 BHK1129.20-
M73 BHK1129.13-
M74 BHK1155.92-
M84 BHK1156.45-
M83 BHK1129.20-
M83 BHK1129.13-
M84 BHK1155.92-
M94 BHK1156.45-
M93 BHK1129.20-
M93 BHK1129.13-
M94 BHK1155.92-
M104 BHK1156.45-
M103 BHK1129.20-
M103 BHK1129.13-
M104 BHK1155.92-
M114 BHK1156.45-
M113 BHK1129.20-
M113 BHK1129.13-
M114 BHK1155.92-
M124 BHK1156.45-
M123 BHK1129.20-
M123 BHK1129.13-
M124 BHK1155.92-
M134 BHK1156.45-
M133 BHK1129.20-
M133 BHK1129.13-
M134 BHK1155.92-
M144 BHK1156.45-
M143 BHK1129.20-
M143 BHK1129.13-
M144 BHK1155.92-

Development Works

work_namedescription
Demarcation of PlotsDemarcation of the plot has already been done
Boundary WallThe boundary walls of 6 feet to 7 feet will be provided as per the site requirement. The wall will be a brick wall with a width of 4 inches.
Road WorkBituminous and concrete roads will be provided as per the requirement of the site. the width of the road is variable as per the condition with the depth of the top layer of 25mm in bituminous and 150 mm top in case of concrete pavement
FootpathsA suitable pathway designed for roads built with RCC paver blocks will be provided. The strength of the paver block will be M-10
Water Supply Including Drinking Water FacilitiesUP Jal Nigam / Borewell water for drinking and domestic use with the distribution network of pipelines spread across the project will be laid.
Sewer SystemA centralized sewer system shall be provided. The sewer water will be sent to STP with the suitable diameter of pipe line.
DrainRain water harvesting and flood water drains are provided.
ParksProvision of several parkas / Green belts in front and all round of apartment towers as per arch design.
Tree PlantingProvision of complete tree plantation and green belts designed by landscape architects.
Design For Electric Supply Including Street LightingProvision of centrilised electrical supply system to apartments / amenities / lifts / water pump rooms / stp etc. As per norms and specifications / requirements of pvvnl uppcl.
Community BuildingsThe community building is already under construction having all the common facilities for the residents of the project.
Treatment and Disposal System of Sewage and Sullage waterProvision of centrilised sewerage system going to STP for treatment and after treatment water shall be recycled for flushing and horticulture works.
Solid Waste Management And Disposal SystemProper garbage collection area is designated to be disposed as per town area system
Water Conservation SystemA complete system of rain water harvesting through long open water bodies / or rain water recharge pits is designed by consultants as per requirement.
Energy Management System Including Use of Renewable EnergyWe will use LED leight fittings as ell as solar lights in external areas and common areas in stp/pump rooms / lifts energy efficient motors / equipments will be used.
Fire Protection And Fire Safety SystemA proper fire protection and safety system designed as per norms and requirements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesFor domestic water supply a ugr shall be provided withe primary filtration and treatment. After treatment water shall be transferred to over head tanks for supply to apartments. all sewerage / waste water will be treated in stp and after treatment shall be cirrculated for flushing through overhear flusing water tanks and for horticulture works. all rain water from terraces and ground surfaces will be harveshted through infiltration / recharging in the ground water.
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameUnion Bank of India
BranchTaramandal
Branch AddressSiddharth Enclave, Taramandal, Deoria Bypass, Gorakhpur
Account HolderAisshpra Life Spaces Paalm Paradise Phase 6 Collection A/c
Account Number591401010050623
IFSC CodeUBIN0559148

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy