PATRAKARPURAM VISTAR 4 STORY AFFORDABLE (G+3) SEMI FINISHED HOUSING SCHEME
Gorakhpur Development Authority
Gorakhpur, Uttar Pradesh
Approved
20th May 2020
Completed
19th May 2023
Registration No.
UPRERAPRJ478126
Project Type
Residential
District
Gorakhpur
Taluka
Gorakhpur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ478126 |
| Project Status | Completed |
| Project Category | Residential |
| District | Gorakhpur |
| Taluka | Gorakhpur |
| Start Date | 2020-05-20 |
| Completion Date | 2023-05-19 |
| Total Area (sqm) | 21658 |
| Project Cost (Lacs) | 3528 |
| Duration (Months) | 36 |
| Registration Fee | 113500 |
Promoter Details
| Promoter Name | Gorakhpur Development Authority |
| Promoter ID | UPRERAPRM14553 |
| Mobile | 96******** |
Project Team
| role | name |
|---|---|
| Architect | MS V DESIGN SHREE ANUPAM AGRAWAL |
| Contractor | MS ANIL KUMAR SHAHI AND MS GOLDEN KEY CONSTRUCTION COMPANY |
| Structural Engineer | MS NEERAJ ASSOCIATE SHREE NEERAJ GAUTAM |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 584,585MI,836MI,837,838MI,844MI,845MI,851MI,852MI,856MI,857,858 | 21657.65 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | GF | 2 BHK | 4 | 54.45 | 0 |
| 2 | GF | 2 BHK | 4 | 54.45 | 0 |
| 3 | GF | 2 BHK | 4 | 54.45 | 0 |
| 4 | GF | 2 BHK | 4 | 54.45 | 0 |
| 5 | GF | 2 BHK | 4 | 54.45 | 0 |
| 6 | GF | 2 BHK | 4 | 54.45 | 0 |
| 7 | GF | 2 BHK | 4 | 54.45 | 0 |
| 8 | GF | 2 BHK | 4 | 54.45 | 0 |
| 9 | GF | 2 BHK | 4 | 54.45 | 0 |
| 10 | GF | 2 BHK | 4 | 54.45 | 0 |
| 11 | GF | 2 BHK | 4 | 54.45 | 0 |
| 12 | GF | 2 BHK | 4 | 54.45 | 0 |
| 13 | GF | 2 BHK | 4 | 54.45 | 0 |
| 14 | GF | 2 BHK | 4 | 54.45 | 0 |
| 15 | GF | 2 BHK | 4 | 54.45 | 0 |
| 1 | 1 | 2 BHK | 4 | 54.45 | - |
| 2 | 1 | 2 BHK | 4 | 54.45 | - |
| 3 | 1 | 2 BHK | 4 | 54.45 | - |
| 4 | 1 | 2 BHK | 4 | 54.45 | - |
| 5 | 1 | 2 BHK | 4 | 54.45 | - |
| 6 | 1 | 2 BHK | 4 | 54.45 | - |
| 7 | 1 | 2 BHK | 4 | 54.45 | - |
| 8 | 1 | 2 BHK | 4 | 54.45 | - |
| 9 | 1 | 2 BHK | 4 | 54.45 | - |
| 10 | 1 | 2 BHK | 4 | 54.45 | - |
| 11 | 1 | 2 BHK | 4 | 54.45 | - |
| 12 | 1 | 2 BHK | 4 | 54.45 | - |
| 13 | 1 | 2 BHK | 4 | 54.45 | - |
| 14 | 1 | 2 BHK | 4 | 54.45 | - |
| 15 | 1 | 2 BHK | 4 | 54.45 | - |
| 1 | 2 | 2 BHK | 4 | 54.45 | - |
| 2 | 2 | 2 BHK | 4 | 54.45 | - |
| 3 | 2 | 2 BHK | 4 | 54.45 | - |
| 4 | 2 | 2 BHK | 4 | 54.45 | - |
| 5 | 2 | 2 BHK | 4 | 54.45 | - |
| 6 | 2 | 2 BHK | 4 | 54.45 | - |
| 7 | 2 | 2 BHK | 4 | 54.45 | - |
| 8 | 2 | 2 BHK | 4 | 54.45 | - |
| 9 | 2 | 2 BHK | 4 | 54.45 | - |
| 10 | 2 | 2 BHK | 4 | 54.45 | - |
| 11 | 2 | 2 BHK | 4 | 54.45 | - |
| 12 | 2 | 2 BHK | 4 | 54.45 | - |
| 13 | 2 | 2 BHK | 4 | 54.45 | - |
| 14 | 2 | 2 BHK | 4 | 54.45 | - |
| 15 | 2 | 2 BHK | 4 | 54.45 | - |
| 1 | 3 | 2 BHK | 4 | 54.45 | - |
| 2 | 3 | 2 BHK | 4 | 54.45 | - |
| 3 | 3 | 2 BHK | 4 | 54.45 | - |
| 4 | 3 | 2 BHK | 4 | 54.45 | - |
| 5 | 3 | 2 BHK | 4 | 54.45 | - |
| 6 | 3 | 2 BHK | 4 | 54.45 | - |
| 7 | 3 | 2 BHK | 4 | 54.45 | - |
| 8 | 3 | 2 BHK | 4 | 54.45 | - |
| 9 | 3 | 2 BHK | 4 | 54.45 | - |
| 10 | 3 | 2 BHK | 4 | 54.45 | - |
| 11 | 3 | 2 BHK | 4 | 54.45 | - |
| 12 | 3 | 2 BHK | 4 | 54.45 | - |
| 13 | 3 | 2 BHK | 4 | 54.45 | - |
| 14 | 3 | 2 BHK | 4 | 54.45 | - |
| 15 | 3 | 2 BHK | 4 | 54.45 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | AREA HAS BEEN DEMARCATED |
| Boundary Wall | THERE IS NO PROVISION OF BOUNDARY WALL IN THE PROJECT |
| Road Work | 3.60 MT WIDE CEMENT CONCRETE ROAD HAVE BEEN PROVISIONED |
| Footpaths | NA |
| Water Supply Including Drinking Water Facilities | DRINKABLE WATER SHALL BE SUPPLIED THROUGH BORED WELL via 150 ,100 and 50 mm dia C P V C pipe also under ground water tank has been provided |
| Sewer System | SEWERAGE NETWORK has been provisioned with ready made R C C hume pipe 15 no septic tank and 250 mm R C C hume pipe to be connect S T P |
| Drain | R C C DRAINS OF SECTION OF 300 X 450 MM TO 300 X 600 MM HAS BEEN PROVISIONED |
| Parks | PARKS SHALL BE DEVELOPED IN THE SCHEME WITH M S RAILING AND GATE |
| Tree Planting | TREE SHALL BE PLANTED WITHIN OPEN SPACES AND PARKS |
| Design For Electric Supply Including Street Lighting | ELECTRICAL SUPPLY WITH 4 NO TRANSFORMER L E D STREET LIGHTS |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | SEWER SHALL BE TREATED THROUGH STP( PROVISION IN RAPTI NAGAR VISTAR SCHEME) |
| Solid Waste Management And Disposal System | GARBAGE COLLECTION CENTER HAVE BEEN PROVISIONED AS SHOWN IN LAYOUT |
| Water Conservation System | NA |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | FIRE FIGHTING SYSTEM IS PROVIDED WITH PROVISIONED OF OHT TANK ON BUILDING TOP , HOSE REEL AND FIRE PUMP |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | STATE BANK OF INDIA |
| Branch | TARAMANDAL |
| Branch Address | SBI TARAMANDAL |
| Account Holder | SECRETARY GORAKHPUR DEVELOPMENT AUTHORITY |
| Account Number | 39349125867 |
| IFSC Code | SBIN0016724 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





