New Launch - India Real Estate Report 2026.

Aspire City Phase-2

Aspire City LLP

Hapur, Uttar Pradesh

RERA approved

Approved

30th Jun 2025

Completion pending

Pending

30th Jun 2028

Registration No.

UPRERAPRJ130247/03/2025

Project Type

Residential

District

Hapur

Taluka

Select

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ130247/03/2025
Project StatusNew
Project CategoryResidential
DistrictHapur
TalukaSelect
Start Date2025-06-30
Completion Date2028-06-30
Total Area (sqm)11454
Project Cost (Lacs)1277
Duration (Months)37
Registration Fee62500

Promoter Details

Promoter NameAspire City LLP
Promoter IDUPRERAPRM346105
Mobile95********

Project Team

rolename
ArchitectSpace Design International
ContractorM/s Ishwari STS Infrastructure
Structural EngineerNNC Design International

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra250, 254, 25711454

Development Works

work_namedescription
Demarcation of PlotsProper demarcation of plots will be done, with all fixed four points showing road, plot area & other services also.
Boundary WallBrick Masonry wall will be constructed with isolated footing, columns & Plinth beam along with Plaster on both sides & grill on the top.
Road WorkComplete Black top (Bituminous) Road will be constructed all along the defined location in the approved drawings with standard specifications.
FootpathsFootpaths will be constructed all along the road/ Green area as designed with specific Pavers/ Stone on top.
Water Supply Including Drinking Water FacilitiesWater supply will be given to all individuals through underground water tank with Proper filterization Plant.
Sewer SystemProper Sewer system will be constructed embedded with Sewer Treatment Plant.
DrainStorm Water Drain will be constructed as per the approved drawings & gradients.
ParksComplete Greenery will be developed as per approved Landscaping drawings.
Tree PlantingAll Trees/ Shrubs/ Hedging will be planted as required in approved drawings.
Design For Electric Supply Including Street LightingElectrical supply will be given to all inviduals at single point from Developed substation as per norms. Proper Street lighting will be done as per requirement & approved drawings.
Community BuildingsNot Applicable.
Treatment and Disposal System of Sewage and Sullage waterComplete STP will be installed as per approved drawing & capacity to full fill the requirement.
Solid Waste Management And Disposal SystemSolid Waste Management system will be installed in a separate dedicated space to full fill all the required criteria.
Water Conservation SystemAs per requirements.
Energy Management System Including Use of Renewable EnergyAs per requirements.
Fire Protection And Fire Safety SystemAs per requirements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAs per requirements.
Emergency Evacuation ServicesAs per requirements.
Other Miscellaneous WorkAs per requirements.

Bank Details

Bank NameHDFC Bank Ltd.
BranchPilkhuwa
Branch AddressHDFC Bank Ltd Motor Stand, Delhi Garh Road, NH-24 Pilkhuwa, Uttar Pradesh
Account HolderM/S. ACLLP RERA M COLL A/C ASPIRE CITY PH-2
Account Number50200106429740
IFSC CodeHDFC0000926

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy