New Launch - India Real Estate Report 2026.

M AND M ANANTA PROJECT K-2(2) BLOCK-K ANAND VIHAR AAWASIYA YOJNA HAPUR

M AND M PROTECH PRIVATE LIMITED

Hapur, Uttar Pradesh

RERA approved

Approved

12th Feb 2025

Completion pending

Pending

31st Dec 2028

Registration No.

UPRERAPRJ652847/04/2025

Project Type

Residential

District

Hapur

Taluka

Select

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ652847/04/2025
Project StatusNew
Project CategoryResidential
DistrictHapur
TalukaSelect
Start Date2025-02-12
Completion Date2028-12-31
Total Area (sqm)9607.45
Project Cost (Lacs)13219
Duration (Months)47
Registration Fee262000

Promoter Details

Promoter NameM AND M PROTECH PRIVATE LIMITED
Promoter IDUPRERAPRM288243
Mobile98********

Project Team

rolename
ArchitectPUSP KUMAR SHARMA
ContractorSUNIL NAGAR
Structural EngineerJITENDRA KUMAR

Land Details

typekhasra_or_plot_noarea_sqmt
PlotK-2(2) ANAND VIHAR AWASIYA YOJANA9607.45

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER-AGFSHOP574.30
TOWER-AGF3 BHK2239.680
TOWER-A24 BHK2275.92-
TOWER-A23 BHK2239.68-
TOWER-A13 BHK2239.68-
TOWER-A14 BHK2275.92-
TOWER-AGF1 BHK174.320
TOWER-AGF3 BHK1130.060
TOWER-A34 BHK2275.92-
TOWER-A33 BHK2239.68-
TOWER-A44 BHK2275.92-
TOWER-A43 BHK2239.68-
TOWER-A54 BHK2275.92-
TOWER-A53 BHK2239.68-
TOWER-A64 BHK2275.92-
TOWER-A63 BHK2239.68-
TOWER-A74 BHK2275.92-
TOWER-A73 BHK2239.68-
TOWER-A84 BHK2275.92-
TOWER-A83 BHK2239.68-
TOWER-A94 BHK2275.92-
TOWER-A93 BHK2239.68-
TOWER-A104 BHK2275.92-
TOWER-A103 BHK2239.68-
TOWER-A114 BHK2275.92-
TOWER-A113 BHK2239.68-
TOWER-B14 BHK2275.92-
TOWER-B13 BHK2239.68-
TOWER-B23 BHK2239.68-
TOWER-B24 BHK2275.92-
TOWER-B34 BHK2275.92-
TOWER-B33 BHK2239.68-
TOWER-B43 BHK2239.68-
TOWER-B44 BHK2275.92-
TOWER-B54 BHK2275.92-
TOWER-B53 BHK2239.68-
TOWER-B63 BHK2239.68-
TOWER-B64 BHK2275.92-
TOWER-B74 BHK2275.92-
TOWER-B73 BHK2239.68-
TOWER-B84 BHK2275.92-
TOWER-B83 BHK2239.68-
TOWER-B93 BHK2239.68-
TOWER-B94 BHK2275.92-
TOWER-B104 BHK2275.92-
TOWER-B103 BHK2239.68-
TOWER-B113 BHK2239.68-
TOWER-B114 BHK2275.92-
TOWER-BGF3 BHK4479.360
TOWER-CGF3 BHK2239.680
TOWER-CGFOTHER1418.060
TOWER-C1OTHER1418.06-
TOWER-C13 BHK1119.84-
TOWER-C14 BHK1137.96-
TOWER-C24 BHK2275.92-
TOWER-C23 BHK2239.68-
TOWER-C33 BHK2239.68-
TOWER-C34 BHK2275.92-
TOWER-C44 BHK2275.92-
TOWER-C43 BHK2239.68-
TOWER-C53 BHK2239.68-
TOWER-C54 BHK2275.92-
TOWER-C64 BHK2275.92-
TOWER-C63 BHK2239.68-
TOWER-C73 BHK2239.68-
TOWER-C74 BHK2275.92-
TOWER-C84 BHK2275.92-
TOWER-C83 BHK2239.68-
TOWER-C93 BHK2239.68-
TOWER-C94 BHK2275.92-
TOWER-C104 BHK2275.92-
TOWER-C103 BHK2239.68-
TOWER-C113 BHK2239.68-
TOWER-C114 BHK2275.92-
TOWER-DGF3 BHK4479.360
TOWER-D13 BHK2239.68-
TOWER-D14 BHK2275.92-
TOWER-D24 BHK2275.92-
TOWER-D23 BHK2239.68-
TOWER-D34 BHK2275.92-
TOWER-D33 BHK2239.68-
TOWER-D44 BHK2275.92-
TOWER-D43 BHK2239.68-
TOWER-D53 BHK2239.68-
TOWER-D54 BHK2275.92-
TOWER-D64 BHK2275.92-
TOWER-D63 BHK2239.68-
TOWER-D73 BHK2239.68-
TOWER-D74 BHK2275.92-
TOWER-D84 BHK2275.92-
TOWER-D83 BHK2239.68-
TOWER-D93 BHK2239.68-
TOWER-D94 BHK2275.92-
TOWER-D104 BHK2275.92-
TOWER-D103 BHK2239.68-
TOWER-D113 BHK2239.68-
TOWER-D114 BHK2275.92-
BASEMENTBSMNTOTHER16930-
BASEMENTBSMNT2OTHER17157-

Development Works

work_namedescription
Demarcation of PlotsThe Plot has 9607.45 sqm of the area that will be demarcated as per sanction and survey drawing
Boundary WallThe boundary wall will be prepared with RCC and Bricks with plaster
Road Work7.5 m wide access road to all tower will be provide and the road will be designed to take up live lode as per approvals and NBC
Footpathsdesigned footpaths in the project as a walkway and jogging track
Water Supply Including Drinking Water FacilitiesYEIDA authority shall supply water for the entire society and shall be treated and pumped to all the flat
Sewer SystemCENTRALIZED STP TO TREATE THE SEWAGE WILL BE DESIGNED AND PROVIDE
DrainRain water drain will be provided as per the design to carry all the rain water of the complex in a ringline .the same will be connected to rain
Parksbeautiful parks will be made for all resident to enjoy.the park will be relaxing and entertainment zones along with spaces meant for senior citizen,kids,and enjoyment.
Tree Plantingas per approved building plan an apt no of tree will be provided.the tree will be a mix of evergreen anf flowering tree.they will be themed treen plantation and the complex will have a luch green outlook
Design For Electric Supply Including Street LightingPower supply from uppcl as per approved electric plan the lighting will be adequate to lit up the dark spaces and all pathways as well as driveways.
Community BuildingsThe club will be made as per approved building plan and it will have all the modern facilities .social gathering place are also being providing in the project the resident will be able to enjoy in the club as a place for social gathering and relaxation.
Treatment and Disposal System of Sewage and Sullage waterSTP will treat all the sewages generat from the society and will be maintained
Solid Waste Management And Disposal Systemcollection,stroage,and disposal will be done as per sanction and NBC.good to too collection of solid waste in the segregated system will be done so that the recyclable waste gan be separated in an efficient way from the wet kitchen waste.
Water Conservation SystemRainwater harvesting system is being provided to conserve rainwater and a duel flush system will also provided with water saving fittings. 12 no of RWH pits proposed
Energy Management System Including Use of Renewable Energyusage of LED lights will be used all over the project and the use of solar lights will also be explored.
Fire Protection And Fire Safety SystemAs per the approved building plan we will designed the best fire protection system consisting of sprinkler, smoke detectors and fire alarms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSocial gathering place are being provided in the project,Thease place will be spread over the whole complex and residents will be able to enjoy the same Swimming pool,GYM,Indoor play areas ,playing courts,all these facilities will be provided in the complex
Emergency Evacuation ServicesAs per approved building plan and fire approvals fire staircase are being provided .all fire exit passages shall be kept clear all the time and proper audits as well as fire drills will be done in the society
Other Miscellaneous WorkAs per approved building plan any and all the works will be done to make the projects very comfortable and of good quality for all residents,the water bodies will be made in the complex to make it look more beautiful as well as a place to feel calm and relaxed.

Bank Details

Bank NameUNION BANK OF INDIA
BranchHAPUR MAIN BRANCH
Branch AddressNH 24 GARH ROAD PUCCA BAGH HAPUR
Account HolderM AND M PROTECH PRIVATE LIMITED COLLECTION FOR M AND M ANANTA PROJECT K2(2) BLOCK K ANAND VIHAR AWAYSIYA YOJNA HAPUR
Account Number306201010036562
IFSC CodeUBIN0530620

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy