VCJ Kuber Heights
VCJ Kuber Hights
Jaunpur, Uttar Pradesh
Approved
20th May 2023
Completed
31st Mar 2026
Registration No.
UPRERAPRJ515798
Project Type
Residential
District
Jaunpur
Taluka
Shahganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ515798 |
| Project Status | Completed |
| Project Category | Residential |
| District | Jaunpur |
| Taluka | Shahganj |
| Start Date | 2023-05-20 |
| Completion Date | 2026-03-31 |
| Total Area (sqm) | 2118 |
| Project Cost (Lacs) | 1993 |
| Duration (Months) | 35 |
| Registration Fee | 16000 |
Promoter Details
| Promoter Name | VCJ Kuber Hights |
| Promoter ID | UPRERAPRM234829 |
| Mobile | 88******** |
Project Team
| role | name |
|---|---|
| Architect | Ar. Krishan Kumar Srivastava |
| Contractor | Janardan Kumar Srivastava |
| Structural Engineer | Vijay Kumar Mishra |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 00434 | 2117 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Tower 1 | BSMNT | OTHER | 0 | 0 | - |
| Tower 1 | BSMNT2 | OTHER | 0 | 0 | - |
| Tower 1 | BSMNT3 | OTHER | 0 | 0 | - |
| Tower 1 | GF | OTHER | 0 | 0 | 0 |
| Tower 1 | 1 | 2 BHK | 2 | 72.02 | - |
| Tower 1 | 1 | 2 BHK | 2 | 72.58 | - |
| Tower 1 | 1 | 3 BHK | 2 | 87.17 | - |
| Tower 1 | 1 | 3 BHK | 2 | 96.37 | - |
| Tower 1 | 2 | 2 BHK | 2 | 72.02 | - |
| Tower 1 | 2 | 2 BHK | 2 | 72.58 | - |
| Tower 1 | 2 | 3 BHK | 2 | 87.17 | - |
| Tower 1 | 2 | 3 BHK | 2 | 96.37 | - |
| Tower 1 | 3 | 2 BHK | 2 | 72.58 | - |
| Tower 1 | 3 | 2 BHK | 2 | 72.02 | - |
| Tower 1 | 3 | 3 BHK | 2 | 87.17 | - |
| Tower 1 | 3 | 3 BHK | 2 | 96.37 | - |
| Tower 1 | 4 | 2 BHK | 2 | 72.2 | - |
| Tower 1 | 4 | 2 BHK | 2 | 72.58 | - |
| Tower 1 | 4 | 3 BHK | 2 | 87.17 | - |
| Tower 1 | 4 | 3 BHK | 2 | 96.37 | - |
| Tower 1 | 5 | 2 BHK | 2 | 72.02 | - |
| Tower 1 | 5 | 2 BHK | 2 | 72.58 | - |
| Tower 1 | 5 | 3 BHK | 2 | 87.17 | - |
| Tower 1 | 5 | 3 BHK | 2 | 96.37 | - |
| Tower 1 | 6 | 2 BHK | 2 | 72.02 | - |
| Tower 1 | 6 | 2 BHK | 2 | 72.58 | - |
| Tower 1 | 6 | 3 BHK | 2 | 87.17 | - |
| Tower 1 | 6 | 3 BHK | 2 | 96.37 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The project land will be demarcated wall to the exact shape size and orientation as per sanction map by the authority. and 6 feet fencing and green hedge on outer boundary. |
| Boundary Wall | As per plan A 2.4 mtr. high boundary wall made to brick and plaster will be constructed with deep foundation to be earthquake resistant. the wall then be planstered and painted and per aeshetics look. |
| Road Work | As per plan the road shall be constructed in M-20 grade RCC will be laid in thickness off +150 mm on top of compact PCC and compacted base metal. |
| Footpaths | As per plan M-20 grade paver/ interlocking pavers will be laid in the walking area the pavers shall be 3"-4" thickness and shall be laid on compacted sand bad. |
| Water Supply Including Drinking Water Facilities | As per plan a portable ground water supply through the pumping arrangement will be delivered to the water to the water tank of 1 lac liter capacity on treeace. |
| Sewer System | As per plan the sewerage shall be collected through the soil pipe arrangement U band and inspection chamber leading to the STP of the project. |
| Drain | As per plan the roof water shall be brought to the ground floor level with the 150mm-200mm rain UPVC water down take pipes along with the surface. |
| Parks | As per drawing approved by the Authorities. Green area and community Garden. |
| Tree Planting | The trees will be planted at all suitable location as per approved plan. |
| Design For Electric Supply Including Street Lighting | As per plan Electrical layout and capacity will be installed to surface the commercial use of the project as per load sanction approval. full load backup through DG. |
| Community Buildings | As per approved building plan. |
| Treatment and Disposal System of Sewage and Sullage water | As per plan Cenralized STP to be treat the sewage. through 2 x 150 KLD STP. |
| Solid Waste Management And Disposal System | As per plan project shall have waste regregation area. |
| Water Conservation System | Through rain water harvesting pit. Rain water harvesting duel flush system shall be provided as per sanction plan. |
| Energy Management System Including Use of Renewable Energy | LED light and timer control panels shall be used as per plan. |
| Fire Protection And Fire Safety System | Hydrant and spinkler system for complete building including apartment fire alarm system shall be provided as per plan. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not applicable |
| Emergency Evacuation Services | As per providing buillding plan fire lift, fire stairecase with 2 hours protection of fire doors including the fire doors on emergency service. |
| Other Miscellaneous Work | As per approved building plan. |
Bank Details
| Bank Name | UCO Bank |
| Branch | Jaunpur Branch |
| Branch Address | UCO Bank 1 st floor Suttarhatti Jaunpur |
| Account Holder | VCJ Kuber Hights Collection Account for VCJ Kuber Heights |
| Account Number | 18990210003336 |
| IFSC Code | UCBA0001899 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





