New Launch - India Real Estate Report 2026.

CENTRAL PARK APARTMENT

AZAD AHMAD KHAN

Jhansi, Uttar Pradesh

RERA approved

Approved

31st Oct 2019

Completion pending

Pending

16th Aug 2026

Registration No.

UPRERAPRJ112333

Project Type

Residential

District

Jhansi

Taluka

Jhansi

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ112333
Project StatusNew
Project CategoryResidential
DistrictJhansi
TalukaJhansi
Start Date2019-10-31
Completion Date2026-08-16
Total Area (sqm)22738
Project Cost (Lacs)9000
Duration (Months)82
Registration Fee119000

Promoter Details

Promoter NameAZAD AHMAD KHAN
Promoter IDUPRERAPRM97013
Mobile99********

Project Team

rolename
ArchitectPriyen Niranjan Gajjar
ContractorRam Kumar Singh
Structural EngineerNiranjan Gajjar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra2/3/227993.93

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
AGFOTHER000
A12 BHK1166.64-
A22 BHK1166.64-
A32 BHK1166.64-
A42 BHK1166.64-
A52 BHK1166.64-
A62 BHK1166.64-
A72 BHK1166.64-
A82 BHK1166.64-
A92 BHK1166.64-
A102 BHK1166.64-
A112 BHK1166.64-
A122 BHK1166.64-
A13 BHK593.26-
A23 BHK593.26-
A33 BHK593.26-
A43 BHK593.26-
A53 BHK593.26-
A63 BHK593.26-
A73 BHK593.26-
A83 BHK593.26-
A93 BHK593.26-
A103 BHK593.26-
A113 BHK593.26-
A123 BHK593.26-
A13 BHK4112.49-
A23 BHK4112.49-
A33 BHK4112.49-
A43 BHK4112.49-
A53 BHK4112.49-
A63 BHK4112.49-
A73 BHK4112.49-
A83 BHK4112.49-
A93 BHK4112.49-
A103 BHK4112.49-
A113 BHK4112.49-
A123 BHK4112.49-
BGFOTHER000
B12 BHK666.64-
B22 BHK666.64-
B32 BHK666.64-
B42 BHK666.64-
B52 BHK666.64-
B62 BHK666.64-
B72 BHK666.64-
B82 BHK666.64-
B92 BHK666.64-
B102 BHK666.64-
B112 BHK666.64-
B122 BHK666.64-
B13 BHK793.26-
B23 BHK793.26-
B33 BHK793.26-
B43 BHK793.26-
B53 BHK793.26-
B63 BHK793.26-
B73 BHK793.26-
B83 BHK793.26-
B93 BHK793.26-
B103 BHK793.26-
B113 BHK793.26-
B123 BHK793.26-
B13 BHK8112.49-
B23 BHK8112.49-
B33 BHK8112.49-
B43 BHK8112.49-
B53 BHK8112.49-
B63 BHK8112.49-
B73 BHK8112.49-
B83 BHK8112.49-
B93 BHK8112.49-
B103 BHK8112.49-
B113 BHK8112.49-
B123 BHK8112.49-
CGFOTHER000
C11 BHK1026-
C21 BHK1026-
C31 BHK1026-
C41 BHK1026-
C51 BHK1026-
C6OTHER00-
CGFOTHER000
C11 BHK937-
C21 BHK937-
C31 BHK937-
C41 BHK937-
C51 BHK937-
C61 BHK537-
SHOPGFSHOP17950

Development Works

work_namedescription
Demarcation of PlotsNA
Boundary WallBoundry wall at site will be made of fly ash / clay bricks with column and beam structure. The height of the boundry wall will be 6 feet. Plaster will be done on both side of the boundry wall after that two coat of paints will be coated.
Road WorkConcrete / apex roads will be made at site. The base of the road will be filled with red moram, after that two layers of aggregate 40mm will be laid to make sure that the base of the road is upto the mark, after this the top layer will be of coloured and black and white apex. Road will be 9mtr. to 12mtr. wide.
FootpathsFootpaths will be made by interlocking type b concrete block pavers with a minimum path width of 1.5 mtr and thickness of 80mm.
Water Supply Including Drinking Water FacilitiesFor Water Supply we have a provision of boring water as well as govt water supply from jal nigam. Water supply Provision will be provided via system of pumps and pipes. Water will get stored in underground tanks and from there water will get supplied to overhead tanks. Each block contains overhead tanks from where the water will get supllied to the units and common areas. This water is used for drinking and daily use purposes.
Sewer SystemSewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation.
DrainDrain will be made below the foothpaths with chambers at 10mtr distance.Drains will be made with brick work and PVC pipes of different dia. the water from flats will come through pvc pipes in this drains and a proper slope will be maintained till STP plant. The water will get collected through drains in STP plant.There will be seperate drain for each tower.
ParksTotal Number of Parks provided is 3 nos, 1st park is located at the entry gate 2nd park is located in the center of Tower A and .3rd park is located at the center of Tower B. These park can be used as childrens play area, jogging, sitout space etc.
Tree Plantingwe will plant 1000 trees all over the campus and in the garden as well
Design For Electric Supply Including Street LightingIron poles with street lights will be placed all over the campus and proper electrification with transformers and wires will be done as shown in the layout. Electrification will be done in all flats also with ISI mark wires,modular switches with proper earthing arrangements.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterSewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation. .
Solid Waste Management And Disposal SystemNA
Water Conservation Systemwater conservation system will be provided on site in this we will make bore in different point in the gardens as well as in the common areas. in this we store rain water below the land and stock that water to flush out from drains at the time of rainy seasons.
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety Systemas per fire fighting norms we have provided all fire fighting measures and safety features as such as fire fighting systems, smoke extraction, fire alarms , sprinklers, hosereels, fire extinguishers, heat detection systems,call points , electrical pumps generators, diesel pumps, jockey pumps, overhead tanks with required capacity, underground tanks with required capacity and other amenities as per norms.
Social Infrastructure And Other Public Amenities Including Public Health Servicesproviding toddlers park, childrens play station, sitout areas, jogging tracks, lush green gardens commercial complex for daily needs and services, car wash area , power backups etc.
Emergency Evacuation ServicesEmergency Evacuation Services is provided. in this main stair, fire stairs, refuse area, emergency exits is provided at each floor of the building
Other Miscellaneous Work8 lifts is provided in the building. Boom Barriers at main entry gate , CCTV cameras all over the campus, seperate car parking space.

Bank Details

Bank NameALLAHABAD BANK
BranchNANDANPURA SHIVPURI ROAD JHANSI
Branch AddressNANDANPURA SHIVPURI ROAD JHANSI
Account HolderAZAD AHMAD KHAN
Account Number50499334908
IFSC CodeALLA0212246

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy