DEV ASHOK ENCLAVE
Dev Ashok Infra Developers
Jhansi, Uttar Pradesh
Approved
11th Apr 2023
Pending
10th Apr 2028
Registration No.
UPRERAPRJ721110
Project Type
Residential
District
Jhansi
Taluka
Jhansi
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ721110 |
| Project Status | New |
| Project Category | Residential |
| District | Jhansi |
| Taluka | Jhansi |
| Start Date | 2023-04-11 |
| Completion Date | 2028-04-10 |
| Total Area (sqm) | 16245 |
| Project Cost (Lacs) | 2915 |
| Duration (Months) | 60 |
| Registration Fee | 86500 |
Promoter Details
| Promoter Name | Dev Ashok Infra Developers |
| Promoter ID | UPRERAPRM240507 |
| Mobile | 84******** |
Project Team
| role | name |
|---|---|
| Architect | A. Nabh Sharma |
| Contractor | Dev Ashok Infra Developers |
| Structural Engineer | Yuvraj Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 70, 72. 82, 83, 84, 85, 86, 89 and 90 | 16000 |
| Khasra | 76 | 1010 |
| Khasra | 77 | 710 |
| Khasra | 74 | 378 |
| Khasra | 78 | 3445 |
| Khasra | 79 | 345 |
| Khasra | 80 | 521 |
| Khasra | 74 | 378 |
| Khasra | 74 | 378 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Plot | 148 | 1 | |
| Plot | 139 | 3 | |
| Plot | 128 | 2 | |
| Plot | 144 | 1 | |
| Plot | 149 | 1 | |
| Plot | 147 | 1 | |
| Plot | 129 | 1 | |
| Plot | 124 | 1 | |
| Plot | 122 | 1 | |
| Plot | 114 | 1 | |
| Plot | 113 | 1 | |
| Plot | 94 | 1 | |
| Plot | 130 | 1 | |
| Plot | 93 | 7 | |
| Villa | 66 | 1 | 193 |
| Villa | 82 | 1 | 138 |
| Villa | 99 | 1 | 167 |
| Villa | 111 | 1 | 188 |
| Villa | 113 | 1 | 191 |
| Villa | 112 | 1 | 189 |
| Villa | 112 | 3 | 194 |
| Villa | 114 | 1 | 192 |
| Villa | 131 | 1 | 221 |
| Villa | 131 | 1 | 170 |
| Villa | 128 | 6 | 215 |
| Villa | 134 | 1 | 226 |
| Villa | 159 | 1 | 194 |
| Villa | 127 | 1 | 194 |
| Villa | 132 | 2 | 194 |
| Villa | 137 | 1 | 194 |
| Villa | 142 | 1 | 194 |
| Villa | 140 | 1 | 194 |
| Villa | 109 | 1 | 194 |
| Villa | 139 | 1 | 200 |
| Villa | 139 | 2 | 194 |
| Villa | 154 | 1 | 180 |
| Villa | 116 | 14 | 194 |
| Villa | 71 | 1 | 120 |
| Villa | 71 | 1 | 120 |
| Villa | 98 | 1 | 194 |
| Villa | 106 | 1 | 194 |
| Villa | 167 | 1 | 194 |
| Villa | 138 | 1 | 194 |
| Villa | 95 | 1 | 194 |
| Villa | 94 | 2 | 194 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per approved layout. |
| Boundary Wall | Boundary wall will be around 6 feet high with lower portion of brick wall and upper 2 ft. in MS grill. |
| Road Work | The internal road will be 7.62 mtr and 9.14 mtr wide tar road with pedestrian on either side with storm water drainage below it. |
| Footpaths | The footpath will be concrete paver block. |
| Water Supply Including Drinking Water Facilities | The water supply to the individual plots will be through hydro pneumatic system with centralized location of underground water tank. |
| Sewer System | Centralized STP system will be provided to cater for the entire sewage generated within the project with zero discharge. |
| Drain | Storm water drain under footpath will be strategically connected to rain water harvesting pits. |
| Parks | Approx 70 percent of plot area is the part of open green and park spaces. |
| Tree Planting | Ample tree plantation will be done in according to the climatic condition of the area. |
| Design For Electric Supply Including Street Lighting | Electric supply will be provided through the central feeder. Energy efficient street lighting will be used in combination of solar operated lighting system |
| Community Buildings | Project is proposed to be facility with community building space for shopping center. |
| Treatment and Disposal System of Sewage and Sullage water | Zero discharge STP planned for the project and for storm water, ample rain water harvesting pits. |
| Solid Waste Management And Disposal System | Space for Solid waste management and disposal system allocated in the project where proper segregation will be done. |
| Water Conservation System | Rain water harvesting pits have been provided at the appropriate location. |
| Energy Management System Including Use of Renewable Energy | Street lighting will be time based which would be automatically controlled. Common area will be powered through solar panel as per norms which will be automatically controlled. |
| Fire Protection And Fire Safety System | Fire protection and fire safety system will provide as per NBC guidelines, 2016. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Site is well connected to social infrastructure line, school, college, hospital and haat bazar. |
| Emergency Evacuation Services | Sufficient open space and park which can be used for emergency evacuation in case of any natural calamity. |
| Other Miscellaneous Work | Plotting and construction of the project with appropriate green area norms. |
Bank Details
| Bank Name | STATE BANK OF INDIA |
| Branch | JHANSI |
| Branch Address | 551/1, CIVIL LINES, OPPOSITE DHYAN CHAND STADIUM, JHANSI |
| Account Holder | DEV ASHOK INFRA DEVELOPERS COLLECTION A/C DEV ASHOK ENCLAVE |
| Account Number | 42079754670 |
| IFSC Code | SBIN0000102 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





