New Launch - India Real Estate Report 2026.

SAINATH INFRACITY

SAINATH INFRACITY LLP

Jhansi, Uttar Pradesh

RERA approved

Approved

1st Dec 2021

Completion pending

Pending

22nd Sept 2026

Registration No.

UPRERAPRJ382186

Project Type

Residential

District

Jhansi

Taluka

Jhansi

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ382186
Project StatusNew
Project CategoryResidential
DistrictJhansi
TalukaJhansi
Start Date2021-12-01
Completion Date2026-09-22
Total Area (sqm)20570
Project Cost (Lacs)3064
Duration (Months)58
Registration Fee108000

Promoter Details

Promoter NameSAINATH INFRACITY LLP
Promoter IDUPRERAPRM153162
Mobile99********

Project Team

rolename
Architectnabh sharma
Contractorkamal singh rajput
Structural EngineerSHUBHAM GUPTA

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra216MI2430
Khasra2183400
Khasra219490
Khasra2202350
Khasra2211700
Khasra2221050
Khasra2231050
Khasra2241130
Khasra2254620
Khasra2262350

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa3601386
Villa2889385
Villa3841296
Villa1641139
Villa11214125
Villa2171200
Villa11213125
Villa2071182
Villa1781158
Villa11228125
Villa2081184

Development Works

work_namedescription
Demarcation of Plots71 DUPLEXS OF DIFFERENT SIZES WILL BE CONSTRUCTED BY DEVELOPER AS PER SANCTIONED LAYOUT PLAN WITH BEST QUALITY MATERIAL . ALONG WITH DUPLEXS DEVELOPMENT OF GARDENS AND OTHER EMENETIES WILL ALSO BE DONE . PLOTS AND GARDENS WILL BE DEMARCATED AND CONSTRUCTED AS PER APPROVED SANCTION PLAN
Boundary WallBOUNDARY WALL CONSTRUCTION IS UNDER CONSTRUCTION . THE COLONY WILL BE FULLY COVERED BY BOUNDARY WALL AND WILL BE ONE GATED COLONY
Road WorkBITUMAN BASED ROAD WILL BE CONSTRUCTED AS PER APPROVED MAP. BEST QUALITY ROADS WILL BE CONSTRUCTED WITH USE OF A GRADE MATERIAL
FootpathsWILL BE CONSTRUCTED AS PER REQUIREMENT
Water Supply Including Drinking Water FacilitiesWATER WILL BE SUPPLIED THROUGH BORING AND GOVERNMENT WATER SUPPLY AFTER TAKING APPROVAL FROM STATUTORY DEPARTMENT . OVER HEAD WATER TANK CONSTRUCTION IS IN PROGRESS OF CAPACITY OF 2.5 LAKHS LITRE WHICH WILL BE STOTE THE WATER FOR COLONY CONSUMPTION
Sewer SystemCENTRALISED SEWER SYSTEM SHALL BE PROVIDED . ALL SEWERAGE WATER SHALL GO THE TOWNSHIP STP FOR TREATMENT AND TREATED WATER SHALL BE RECYCLED AND IT WILL BE USED IN GARDENING AND OVERFLOW FROM THE STP PLANT SHALL BE CONNECTED WITH THE TOWENSHIP SEWERAGE
DrainSTORM WATER SYSTEM SHALL BE PROVIDED . STORM WATER FROM ROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECTED TO STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL BE CONNECTED WITH TOWENSHIP DRAIN
ParksGREEN PARKS ARE UNDER CONSTRUCTION AND WILL BE CONSTRUCTED AS PER APPROVED LAYOUT .
Tree PlantingTREE WILL BE PLANTED OUTSIDE EVERY HOUSE AS WELL AS ALL OVER THE COLONY FOR BETTER STANDARD OF LIVING AND FRESH AIR
Design For Electric Supply Including Street LightingWILL BE DESIGNED AS PER GUIDELINES ISSUED BY LOCAL ELECTRICITY DEPARTMENT
Community BuildingsNO COMMUNITY BUILDING IS PROPOSED FOR THE SAID PROJECT
Treatment and Disposal System of Sewage and Sullage waterCENTRALISED SEWERAGE SYSTEM SHALL BE PROVIDED . ALL SEWERAGE WATER SHALL GO TO THE TOWNSHIP STP FOR TREATMENT AND TREATED WATER SHALL BE RECYCLED AND IT WILL BE USED IN GARDENING AND OVERFLOW FROM THE STP PLANT SHALL BE CONNECTED WITH THE TOWENSHIP SEWERAGE
Solid Waste Management And Disposal SystemPROPER DUSTBINS WILL BE INSTALLED AT DESIGNED LOCATIONS FOR COLLECTION OF SOLID WASTE AND DISPOSAL AS MENTIONED IN APPROVED LAYOUT
Water Conservation SystemA WELL DESIGNED WATER HARVESTING SYSTEM WILL BE DESIGNED FOR WATER CONSERVATION
Energy Management System Including Use of Renewable EnergyLED LIGHTS AND OTHER ENERGY SAVING DEVICES WILL BE INSTALLED IN EXTERNAL AREA . IN STP ALL THE EQUIPMENT SHALL HAVE ENERGY EFFICIENT MOTORS
Fire Protection And Fire Safety SystemAS PER FIRE DEPARTMENT AND NBFC NORMS THE HOUSE IS LESS THAN 30M OF HEIGHT . SO FIRE PROTECTION AND SAFETY WORK IS NOT APPLICABLE FOR THE PROJECT
Social Infrastructure And Other Public Amenities Including Public Health ServicesSEWERAGE , STORM WATER AND WATER SUPPLY SYSTEM SHALL BE PROVIDED . STP WILL BE INSTALLED FOR REUSE OF TREATED WATER
Emergency Evacuation ServicesNOT APPLICABLE ON DUPLEX HOUSES
Other Miscellaneous WorkAS PER APPROVED MAP

Bank Details

Bank NamePUNJAB NATIONAL BANK
BranchCITY BRANCH
Branch AddressCITY BRANCH, MANIK CHOWK, JHANSI
Account HolderSAINTAH INFRACITY LLP COLLECTION ACCOUNT SAINATH INFRACITY
Account Number0229002100071688
IFSC CodePUNB0022900

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy