New Launch - India Real Estate Report 2026.

Salasar City P2

Akhilesh Chandra Gupta Vinod Kumar Gupta

Jhansi, Uttar Pradesh

RERA approved

Approved

1st Apr 2023

Project completed

Completed

25th Jun 2025

Registration No.

UPRERAPRJ912211

Project Type

Residential

District

Jhansi

Taluka

Jhansi

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ912211
Project StatusCompleted
Project CategoryResidential
DistrictJhansi
TalukaJhansi
Start Date2023-04-01
Completion Date2025-06-25
Total Area (sqm)12145
Project Cost (Lacs)652
Duration (Months)27
Registration Fee66000

Promoter Details

Promoter NameAkhilesh Chandra Gupta Vinod Kumar Gupta
Promoter IDUPRERAPRM231260
Mobile93********

Project Team

rolename
ArchitectTabrez Alam
ContractorPrabhu Dayal
Structural EngineerSanjay Bami

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra421/8, 241, 236, 238, 239, 245/2, 246, 249/212145

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa1361100
Villa1381100
Villa1431100
Plot1425
Plot11233
Plot1461
Plot941
Plot901
Plot731
Plot861
Plot991
Plot1321
Plot1331
Plot1321

Development Works

work_namedescription
Demarcation of PlotsAll plots are demarcated as per the layout plan being attached. The plot would be demarcated as per the plot area above mentioned for each unit. Further,the development cost would be incurred in the proportion of the plot size and total land.
Boundary WallAll plots are covered by separate boundary walls of atleast 1.5 metres. The colony would be having the boundary wall at the boundary of the colony of height of atleast 2.5 meters.
Road WorkBlack top road is proposed to be laid in the colony. The road would be laid across the colony for the comfort of the residents. The road width would range from 7.5 mtr to 9 mtr as sanctioned in attached layout.
FootpathsPaved biock with the footpath as per approved layout being attached. Footpath would be made across the blocks for the walking residents. The footpath would be of 2 feet wide outside the units.
Water Supply Including Drinking Water FacilitiesWather for general utility and drinking water purpose will be provided by the laid pipeline. The water supply would be provided through the overhead watertank. The water supply would be through pipeline would be laid as per the service layout having all the plumbing external development details
Sewer SystemSewer system would be nade for the cleanliness of the colony. The sewerage plan would be made for the flow of sullage water easily through the sewer system. Proposed water treatment plant will be installed for the treatment of the sewer.
DrainDrain would be constructed in the blocks for thr removal of residual waste out out of the residency through sewage. The same would be constructed as per service layout approved and attached. The drain would be made under the paved pathway. The plan would be made such a way that the water at the road would be flown in the drain.
ParksPark area of 2059 sq.mt. will be developed as per the approved layout plan. 2 parks would be constructed within the colony. Park would contain temple and other facilities for the kids.
Tree Planting100 plants would be planted all over the residency.
Design For Electric Supply Including Street LightingElectric Pole and separate electricity connection will be taken from the concerned electricity department of jhansi. The electric plan would be sanctioned from the electricity board of jhansi.
Community BuildingsA clubhouse has been proposed in the layout.
Treatment and Disposal System of Sewage and Sullage waterand the same would be made as per the approved plan
Solid Waste Management And Disposal SystemSolid waste will be collected regularky by the cleaning department of the cityi.e Nagar palika
Water Conservation SystemRain wather harvesting and sewage treatment plan has been proposed as per the approved layout for developing wather conservation system as per the Govt norms.
Energy Management System Including Use of Renewable EnergyThe residents will follow the Government norms.
Fire Protection And Fire Safety SystemGovernment norns for the fire safety system would be followed.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAs per the approval layout being attached
Emergency Evacuation ServicesAsper the approval layout being attached.
Other Miscellaneous WorkAll other amenities,works and services would be performed as per the approved service layout plan being attached.

Bank Details

Bank NameUCO Bank
BranchBKD Branch
Branch AddressBKD Branch, Jhansi
Account HolderAkhilesh Chandra Gupta Vinod Kumar Gupta RERA Collection AC for Salasar City P2
Account Number19500210002100
IFSC CodeUCBA0001950

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy