SWASTIK CITY PHASE 2
SWASTIK INFRA DEVELOPERS
Jhansi, Uttar Pradesh
Approved
1st Jul 2024
Pending
2nd Apr 2029
Registration No.
UPRERAPRJ553757/09/2024
Project Type
Residential
District
Jhansi
Taluka
Jhansi
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ553757/09/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Jhansi |
| Taluka | Jhansi |
| Start Date | 2024-07-01 |
| Completion Date | 2029-04-02 |
| Total Area (sqm) | 20506 |
| Project Cost (Lacs) | 5457 |
| Duration (Months) | 58 |
| Registration Fee | 108000 |
Promoter Details
| Promoter Name | SWASTIK INFRA DEVELOPERS |
| Promoter ID | UPRERAPRM143023 |
| Mobile | 94******** |
Project Team
| role | name |
|---|---|
| Architect | ANGAD SINGH PHOKELA |
| Contractor | PRADEEP GUPTA |
| Structural Engineer | Shubham Gupta |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 467 | 1458 |
| Khasra | 465 | 16960.00 |
| Khasra | Part of 469 | 69.48 |
| Khasra | Part of 469 | 417.43 |
| Khasra | Part of 469 | 78.24 |
| Khasra | 467 | 160.00 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) |
|---|---|---|---|---|
| EWS -LIG | GF | 1 BHK | 7 | 31.87 |
| EWS -LIG | GF | 1 BHK | 7 | 41.53 |
| EWS -LIG | 1 | 1 BHK | 7 | 31.87 |
| EWS -LIG | 1 | 1 BHK | 7 | 41.53 |
| EWS -LIG | 2 | 1 BHK | 7 | 31.87 |
| EWS -LIG | 2 | 1 BHK | 7 | 41.53 |
| EWS -LIG | 3 | 1 BHK | 7 | 31.87 |
| EWS -LIG | 3 | 1 BHK | 7 | 41.53 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | DEVELOPER WILL BE CONSTRUCTING 174 DUPLEXS OF DIFFERENT SIZES AS MENTIONED IN PLAN DETAILS ALONG WITH DEVELOPMENTS OF GARDENS AND OTHER EMENETIES. PLOTS WILL BE DEMARCATED AS PER SANCTIONED PLAN UPLOADED |
| Boundary Wall | Details of boundary are as follows: Wall -Height-8ft, Thickness 230mm with Column and Beam 230mmx300mm distance between columns -15 ft, RCC M-20 grade and Red clay bricks used. |
| Road Work | Details of Road as follows: - Main Entry Road of length 179.4meter is Flexible Pavement Roadand with width 12 meter, thickness of Sub base - 300mm and Bitumen thickness -40mm. Remaining 12m,9m,7.5m Roads are Rigid Pavement road M-20 grade of thickness 150mm for main road and 100mm for Branch Roads. |
| Footpaths | Footpaths are made with Paver Block, size 200mmX200mm, thickness -80mm |
| Water Supply Including Drinking Water Facilities | WATER WILL BE SUPPLIED THROUGH BORING AND GOVERMENT WATER SUPPLY FACILITY . THE LOCATION IS COVERED UNDER JAL JIVAN MISSION ALSO WHICH WILL BE EXTRA ADVANTAGE FOR THE COLONY |
| Sewer System | For Sewer System: (DWC SN-4 Cass pipe with integral socket)of size DWC 160mm,DWC 200mm used to connect manholes of size 600mmx600mmx1000mm (Square) and Dia 600mm (Circle). |
| Drain | Drainage system made by RCC M-20 grade of size 300mmX350mm/450mm and drain wall thickness 100mm. |
| Parks | ALL THE PARKS WILL BE CONSTRUCTED AS PER SANCTION PLAN. THE COLONY WILL BE SURROUNDED BY TREES FOR BETTER LIVING |
| Tree Planting | TREES WILL BE PLANTED ALL OVER THE COLONY FOR BETTER LIVING OF SOCIETY MEMBERS |
| Design For Electric Supply Including Street Lighting | Electrification plan consists of under ground cabels from Transformer to Distribution box and Distribution panel of cabel size -400sqmm,240sqmm,70sqmm,16sqmm. Street light pole of height 5m placed at every 15meter. |
| Community Buildings | COMMUNITY BUILDING WILL BE CONSTRUCTED AS PER SANCTION PLAN FOR GET TOGETHER OF SOCIETY MEMBERS |
| Treatment and Disposal System of Sewage and Sullage water | STP Plant of Capacity 150 KLD has been Installed for Sewer Treatment and 63 mm MDPE Pipe has been laid for the treated water for the parks. |
| Solid Waste Management And Disposal System | FOR SOLID WASTE MANAGEMENT THERE IS PROPER MARKED GARBAGE COLLECTION AREA AS PER SANCTIONED PLAN FOR SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM. |
| Water Conservation System | Recharge pits has been made in the park of size 8ft dia and 8ft deep, built by red clay bricks 230mm thickness and cover with100mm thick slab. |
| Energy Management System Including Use of Renewable Energy | NOT APPLICABLE |
| Fire Protection And Fire Safety System | AS PER FIRE DEPARMENT AND NBFC NORMS THE HOUSES IS LESS THAN 30M OF HEIGHT, SO FIRE PROTECTION AND FIRE SAGETY WORK IS NOT APPLICABLE FOR THE PROJECT. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | COMMERCIAL SHOPS WILL BE CONSTRUCTED AS PER SANCTION PLAN |
| Emergency Evacuation Services | NOT APPLICABLE AS DUPLEX HOUSE ARE CONSTRUCTED |
| Other Miscellaneous Work | N.A. |
Bank Details
| Bank Name | Bank of India |
| Branch | SME Branch |
| Branch Address | SME Branch Jhansi Opposite Dhyanchand Stadium Jhansi-284002 |
| Account Holder | SWASTIK INFRA DEVELOPERS COLLECTION A/c FOR SWASTIK CITY PHASE-2 |
| Account Number | 42936742460 |
| IFSC Code | SBIN0063727 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





