New Launch - India Real Estate Report 2026.

Chandak Imperial Square

Chandak Projects

Kanpur Nagar, Uttar Pradesh

RERA approved

Approved

1st Feb 2018

Project completed

Completed

29th Jun 2023

Registration No.

UPRERAPRJ548357

Project Type

Commercial

District

Kanpur Nagar

Taluka

Kanpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ548357
Project StatusCompleted
Project CategoryCommercial
DistrictKanpur Nagar
TalukaKanpur
Start Date2018-02-01
Completion Date2023-06-29
Total Area (sqm)2777
Project Cost (Lacs)8250
Duration (Months)65
Registration Fee38000

Promoter Details

Promoter NameChandak Projects
Promoter IDUPRERAPRM91824
Mobile99********

Project Team

rolename
ArchitectSanjay Kataria C/o La Archplan Pvt. Ltd.
ContractorM/s Kanti Infrabuild Pvt. Ltd.
Structural EngineerAjay Sahni C/o BMSF Design Consultants Pvt. Ltd.

Land Details

typekhasra_or_plot_noarea_sqmt
Plot33 and 382777

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
1GFSHOP1145.160
1GFSHOP1145.940
1GFSHOP1144.260
11SHOP1116.52-
11SHOP1119.59-
11SHOP1118.14-
11SHOP118.34-
11SHOP1107.35-
11SHOP184.03-
11SHOP183.65-
12SHOP1116.52-
12SHOP1119.59-
12SHOP1118.14-
12SHOP159.56-
12SHOP164.97-
12SHOP166.56-
12SHOP340.76-
12SHOP140.75-
13SHOP182.52-
13SHOP1119.59-
13SHOP1118.14-
13SHOP159.56-
13SHOP164.97-
13SHOP166.56-
13SHOP340.76-
13SHOP140.75-
14SHOP182.52-
14SHOP1119.59-
14SHOP1118.14-
14SHOP159.56-
14SHOP164.97-
14SHOP166.56-
14SHOP340.76-
14SHOP140.75-
15SHOP1116.52-
15SHOP1119.59-
15SHOP1118.14-
15SHOP113.91-
15SHOP164.97-
15SHOP166.56-
15SHOP340.76-
15SHOP140.75-
16SHOP1116.52-
16SHOP1119.59-
16SHOP1118.14-
16SHOP113.91-
16SHOP164.97-
16SHOP166.56-
16SHOP340.76-
16SHOP140.75-
17SHOP1116.52-
17SHOP1119.59-
17SHOP1118.14-
17SHOP159.56-
17SHOP164.97-
17SHOP166.56-
17SHOP340.76-
17SHOP140.75-
18SHOP163.24-
18SHOP190.22-
18SHOP189.18-
18SHOP139.38-
18SHOP139.66-
18SHOP436.71-
19SHOP163.24-
19SHOP190.22-
19SHOP189.18-
19SHOP139.38-
19SHOP139.66-
19SHOP436.71-

Development Works

work_namedescription
Demarcation of PlotsThis is single plot of roughly rectangular shape, having a entry gate and a Exit gate from the 30m wide front road. Site is surronded by others premises on three sides.
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundary wall designed .Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates willl be developed with boundary
Road WorkHigh quality concrete pavers will be used as per deisgn suggeseted by the Architechts for internal road
FootpathsNo
Water Supply Including Drinking Water FacilitiesUnderground and overhead tanks are provided. The terrace tanks shall be fed from hydro-pneumatic system. For all floors gravity supply will be planned.
Sewer SystemSewage treatment plant for treatment of sewage, waste water and other effluents shall be provided. The treated effluent shall be recycled & reused for gardening & flushing.
DrainStorm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit. The overflow from these RHPs shall be connected to Storm Water Network.
ParksNA
Tree Planting4.5 to 6m high trees shall be planted along internal roads.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. Street lightings will be provided.
Community BuildingsN.A.
Treatment and Disposal System of Sewage and Sullage waterSewage treatment plant for treatment of sewage, waste water and other effluents shall be provided. The treated effluent shall be recycled & reused for gardening & flushing.
Solid Waste Management And Disposal SystemDustbin shall pe placed at the demarcated collection points, from where it will be collected by the Municipal Corporation trucks.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area. In STP and Pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemAll rules & regulations of NBC 2016 will be followed, using fire sprinklers, hosereels, wetrisers, hydrants, through underground water tank having 2,00,000 ltr capacity.
Social Infrastructure And Other Public Amenities Including Public Health ServicesN.A.
Emergency Evacuation ServicesFire Staircase has been provided on each floor for emergency evacuation.
Other Miscellaneous WorkN.A.

Bank Details

Bank NameHDFC Bank Ltd.
BranchKANPUR-CIVIL LINES-UTTAR PRADESH
Branch AddressKRISHNA TOWER, 15/63 CIVIL LINES, KANPUR
Account HolderM/S. CHANDAK PROJECTS RERA A/C
Account Number50200043454672
IFSC CodeHDFC0000127

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy