EMERALD GULISTAN PHASE-III
J. K. COTTON LIMITED
Kanpur Nagar, Uttar Pradesh
Approved
1st Dec 2020
Completed
31st Mar 2022
Registration No.
UPRERAPRJ542474
Project Type
Residential
District
Kanpur Nagar
Taluka
Kanpur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ542474 |
| Project Status | Completed |
| Project Category | Residential |
| District | Kanpur Nagar |
| Taluka | Kanpur |
| Start Date | 2020-12-01 |
| Completion Date | 2022-03-31 |
| Total Area (sqm) | 24534 |
| Project Cost (Lacs) | 1162 |
| Duration (Months) | 16 |
| Registration Fee | 128000 |
Promoter Details
| Promoter Name | J. K. COTTON LIMITED |
| Promoter ID | UPRERAPRM65697 |
| Mobile | 80******** |
Project Team
| role | name |
|---|---|
| Architect | SAMIR KUMAR CHAKRAVORTY |
| Contractor | RITU INFRACON BUILDS LIMITED |
| Structural Engineer | NA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | PART OF PLOT NO. 2, SCHEME NO. 39, JAJMAU, KANPUR | 24534.46 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Grubbing/Clearing and Filing, Identification of plots of demarcation of benchmarks with level of 450 mm down from the Road Level. Plot Corner will demarcate with four numbers of brick work pillars. |
| Boundary Wall | From Phase-II to UGR and OTH side boundary wall/ retaining wall. |
| Road Work | RCC Road. |
| Footpaths | Interlocked Pavers and curve stones. |
| Water Supply Including Drinking Water Facilities | MDPE domestic water supply pipelines to plots from OHT or UGR. OHT/UGR will feed from municipal water supply. |
| Sewer System | RCC NP3 hume pipes distribution network to STP (outside project domain in Township) |
| Drain | Saucer drains/catch basins NP3 Hume pipes to RWH structures. Overflow to Municipal drain. |
| Parks | Provision of Park-6 (P-6), Totlots (P-12) and Totlots (P-13) as per Bye laws/ Sanctioned Plan from KDA. |
| Tree Planting | Provision of Tree Planting is as per Bye Laws/ Sanctioned Plan from KDA. |
| Design For Electric Supply Including Street Lighting | Service connections to plots from captive Substations. Street and Park Lighting 6.5/9 meters electric poles as per layout. |
| Community Buildings | N.A. |
| Treatment and Disposal System of Sewage and Sullage water | Treated water used for horticulture and road washing. Connectivity to STP in Township (Beyond project boundaries) |
| Solid Waste Management And Disposal System | Door to Door collection from plots to common segregation and disposal unit near Vendor Zone. Final disposal by Municipal system. |
| Water Conservation System | RWH structures to harvest rain water suitably located in parks/open spaces as per design. |
| Energy Management System Including Use of Renewable Energy | N.A. |
| Fire Protection And Fire Safety System | N.A. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Four shops required shall be provided in future in a common cluster within the Emerald Gulistan Township. |
| Emergency Evacuation Services | N.A. |
| Other Miscellaneous Work | Filling, signage, toe wall, benches for parks etc. |
Bank Details
| Bank Name | IDBI BANK |
| Branch | M.G. ROAD KANPUR |
| Branch Address | M. G. ROAD, KANPUR |
| Account Holder | J.K. COTTON LIMITED RERA DESIGNATED ACCOUNT FOR EMERALD GULISTAN PHASE-III |
| Account Number | 0090102000042732 |
| IFSC Code | IBKL0000090 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in