New Launch - India Real Estate Report 2026.

GULISTAN MART

J. K. COTTON LIMITED

Kanpur Nagar, Uttar Pradesh

RERA approved

Approved

1st Feb 2023

Project completed

Completed

30th Jun 2024

Registration No.

UPRERAPRJ184025

Project Type

Commercial

District

Kanpur Nagar

Taluka

Kanpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ184025
Project StatusCompleted
Project CategoryCommercial
DistrictKanpur Nagar
TalukaKanpur
Start Date2023-02-01
Completion Date2024-06-30
Total Area (sqm)1024
Project Cost (Lacs)402
Duration (Months)17
Registration Fee21000

Promoter Details

Promoter NameJ. K. COTTON LIMITED
Promoter IDUPRERAPRM65697
Mobile88********

Project Team

rolename
ArchitectSAMIR KUMAR CHAKRAVORTY
ContractorVISHNU SARAN AND CO.
Structural EngineerSHASHWAT SHUKLA

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot no. 2 Scheme No. 39, Jajmau, Kanpur1024.14

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
GULISTAN MARTGFSHOP24322.270
GULISTAN MART1SHOP7315.58-
GULISTAN MART2SHOP7315.58-

Development Works

work_namedescription
Demarcation of PlotsNot Applicable
Boundary WallRCC framed structure wall with block including plaster.
Road WorkNot Applicable.
FootpathsTrimix Floor
Water Supply Including Drinking Water FacilitiesCPVC pipeline as per manufacturers design/details. Source municipal supply through UGT/OHT for each toilet.
Sewer SystemRCC hume pipes distribution network to STP (outside project domain in Township)
DrainSaucer drains/catch basins Hume pipes to RWH structures. Overflow to municipal drain.
ParksThe park is one sided covered by MS Grill.
Tree PlantingAs per landscape plan.
Design For Electric Supply Including Street Lightingunderground and through cable tray cabling for each shops from metering feeder pillar and power connectivity from 33/11 KV power sub-station and 11/433 KV distribution sub-station in township. Power supply from KESCO. street and park lighting. External lighting as per layout.
Community BuildingsNot applicable
Treatment and Disposal System of Sewage and Sullage watertreated water used for horticulture and road washing. Connectivity to STP in township (Beyond project boundaries).
Solid Waste Management And Disposal SystemDoor to door collection and common segregation and disposal unit near vendors zone. Final disposal by municipal system.
Water Conservation SystemWe have already RWH structures to harvest rain water suitably located in Phase -4.
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemFire fighting system providing as per NBC 2016.
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommon facilities like community hall, schools and playgrounds obtain within the Emerald Gulistan Township of which phase is a part.
Emergency Evacuation ServicesNot applicable
Other Miscellaneous WorkCCTV/Telephone/Security in Township (beyond project boundaries). Theme wall on two sides of the project to enclose the project.

Bank Details

Bank NameICICI BANK
BranchThe Mall, Kanpur
Branch AddressJ S Tower, 2nd Floor, 16/106, The Mall, Kanpur -208001
Account HolderJ.K. Cotton Ltd. Collection Account for Gulistan Mart
Account Number628805027120
IFSC CodeICIC0006288

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy