GULISTAN MART
J. K. COTTON LIMITED
Kanpur Nagar, Uttar Pradesh
Approved
1st Feb 2023
Completed
30th Jun 2024
Registration No.
UPRERAPRJ184025
Project Type
Commercial
District
Kanpur Nagar
Taluka
Kanpur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ184025 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Kanpur Nagar |
| Taluka | Kanpur |
| Start Date | 2023-02-01 |
| Completion Date | 2024-06-30 |
| Total Area (sqm) | 1024 |
| Project Cost (Lacs) | 402 |
| Duration (Months) | 17 |
| Registration Fee | 21000 |
Promoter Details
| Promoter Name | J. K. COTTON LIMITED |
| Promoter ID | UPRERAPRM65697 |
| Mobile | 88******** |
Project Team
| role | name |
|---|---|
| Architect | SAMIR KUMAR CHAKRAVORTY |
| Contractor | VISHNU SARAN AND CO. |
| Structural Engineer | SHASHWAT SHUKLA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Plot no. 2 Scheme No. 39, Jajmau, Kanpur | 1024.14 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| GULISTAN MART | GF | SHOP | 24 | 322.27 | 0 |
| GULISTAN MART | 1 | SHOP | 7 | 315.58 | - |
| GULISTAN MART | 2 | SHOP | 7 | 315.58 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Not Applicable |
| Boundary Wall | RCC framed structure wall with block including plaster. |
| Road Work | Not Applicable. |
| Footpaths | Trimix Floor |
| Water Supply Including Drinking Water Facilities | CPVC pipeline as per manufacturers design/details. Source municipal supply through UGT/OHT for each toilet. |
| Sewer System | RCC hume pipes distribution network to STP (outside project domain in Township) |
| Drain | Saucer drains/catch basins Hume pipes to RWH structures. Overflow to municipal drain. |
| Parks | The park is one sided covered by MS Grill. |
| Tree Planting | As per landscape plan. |
| Design For Electric Supply Including Street Lighting | underground and through cable tray cabling for each shops from metering feeder pillar and power connectivity from 33/11 KV power sub-station and 11/433 KV distribution sub-station in township. Power supply from KESCO. street and park lighting. External lighting as per layout. |
| Community Buildings | Not applicable |
| Treatment and Disposal System of Sewage and Sullage water | treated water used for horticulture and road washing. Connectivity to STP in township (Beyond project boundaries). |
| Solid Waste Management And Disposal System | Door to door collection and common segregation and disposal unit near vendors zone. Final disposal by municipal system. |
| Water Conservation System | We have already RWH structures to harvest rain water suitably located in Phase -4. |
| Energy Management System Including Use of Renewable Energy | Not Applicable |
| Fire Protection And Fire Safety System | Fire fighting system providing as per NBC 2016. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Common facilities like community hall, schools and playgrounds obtain within the Emerald Gulistan Township of which phase is a part. |
| Emergency Evacuation Services | Not applicable |
| Other Miscellaneous Work | CCTV/Telephone/Security in Township (beyond project boundaries). Theme wall on two sides of the project to enclose the project. |
Bank Details
| Bank Name | ICICI BANK |
| Branch | The Mall, Kanpur |
| Branch Address | J S Tower, 2nd Floor, 16/106, The Mall, Kanpur -208001 |
| Account Holder | J.K. Cotton Ltd. Collection Account for Gulistan Mart |
| Account Number | 628805027120 |
| IFSC Code | ICIC0006288 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





