New Highway City (Phase-2)
BAPL INFRABUILD PRIVATE LIMITED
Kanpur Nagar, Uttar Pradesh
Approved
1st Jun 2021
Completed
29th Dec 2023
Registration No.
UPRERAPRJ577235
Project Type
Residential
District
Kanpur Nagar
Taluka
Kanpur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ577235 |
| Project Status | Completed |
| Project Category | Residential |
| District | Kanpur Nagar |
| Taluka | Kanpur |
| Start Date | 2021-06-01 |
| Completion Date | 2023-12-29 |
| Total Area (sqm) | 59755 |
| Project Cost (Lacs) | 2975 |
| Duration (Months) | 31 |
| Registration Fee | 304000 |
Promoter Details
| Promoter Name | BAPL INFRABUILD PRIVATE LIMITED |
| Promoter ID | UPRERAPRM118562 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | Aditya Kushwaha |
| Contractor | Aditya Narayan Mishra |
| Structural Engineer | Nil |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 542, 545, 551, 552 | 7685 |
| Khasra | 536 | 2051 |
| Khasra | 536 | 2051 |
| Khasra | 541MI, 544, 547, 548, 549, 554 | 9341 |
| Khasra | 506 | 7180 |
| Khasra | 545, 546, 551, 552 | 11890 |
| Khasra | 536 | 2970 |
| Khasra | 542, 543 | 5740 |
| Khasra | 539 | 1330 |
| Khasra | 537, 540 | 7480 |
| Khasra | 536 | 2036 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | To be marked properly with Brick edges and marked with a stone plaque, part front plot boundary wall is to built. |
| Boundary Wall | Only one side boundary wall is there. it will be done in precast. |
| Road Work | Soil is compressed. 2 broken stone layers then a PCC layer and finishing with the metal/ bitumin mix layer is to come. |
| Footpaths | With soil dressing and top finished with soft tiles. |
| Water Supply Including Drinking Water Facilities | Lines to be laid as per the submitted plan and finally connected to a overhead tank. |
| Sewer System | Lines to be laid as per the submitted plan and finally connecting it to STP. |
| Drain | Small drains and big nallah are to be built and part of it to be connected to Rain Water Harvesting pits as mentioned in the plans. |
| Parks | Parks with grass, plants and garden gyms. Sizes as per specified in the plan. |
| Tree Planting | To be done along the road as well as in the parks. |
| Design For Electric Supply Including Street Lighting | As per specified in the Electrical plan. The street light to be fixed complimenting the landscaping futures. |
| Community Buildings | N.A. |
| Treatment and Disposal System of Sewage and Sullage water | S.T.P. |
| Solid Waste Management And Disposal System | Provisions are being made for it to be carried out of the site through a competent agency. |
| Water Conservation System | Rain Water Harvesting system. water recharge pits as well as a system to reuse the waste water in the landscape is being developed. |
| Energy Management System Including Use of Renewable Energy | A suggestion plan is being created for the household to promote the use of solar units as backups. |
| Fire Protection And Fire Safety System | Hydrants to be put along the water supply lines. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not available in this phase |
| Emergency Evacuation Services | Wide roads and ample open areas. |
| Other Miscellaneous Work | N.A. |
Bank Details
| Bank Name | ICICI Bank Ltd. |
| Branch | Kalyanpur Branch |
| Branch Address | GC-26, Awas Vikas Scheme, No.1 Keshawpuram, Kalyanpur, Kanpur, PIN - 208017 |
| Account Holder | BAPL INFRABUILD PVT LTD COLLECTION ACCOUNT FOR NEW HIGHWAY CITY-II |
| Account Number | 407905000536 |
| IFSC Code | ICIC0004079 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate