New Launch - India Real Estate Report 2026.

Paloma The Grandeur

PALOMA REALTY LLP

Kanpur Nagar, Uttar Pradesh

RERA approved

Approved

8th May 2024

Completion pending

Pending

7th May 2029

Registration No.

UPRERAPRJ646361/07/2024

Project Type

Residential

District

Kanpur Nagar

Taluka

Kanpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ646361/07/2024
Project StatusNew
Project CategoryResidential
DistrictKanpur Nagar
TalukaKanpur
Start Date2024-05-08
Completion Date2029-05-07
Total Area (sqm)8449
Project Cost (Lacs)48955
Duration (Months)60
Registration Fee47500

Promoter Details

Promoter NamePALOMA REALTY LLP
Promoter IDUPRERAPRM293976
Mobile94********

Project Team

rolename
ArchitectMr. Rajiv Bajpai
ContractorPALOMA REALTY LLP
Structural EngineerMr. Maksood E. Nazar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra7/98-99, TILAK NAGAR, KANPUR9633.46

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower AGFOTHER000
Tower A1OTHER00-
Tower A24 BHK1311.29-
Tower A24 BHK1262.70-
Tower A24 BHK1268.59-
Tower A34 BHK1311.29-
Tower A34 BHK1262.70-
Tower A34 BHK1268.59-
Tower A44 BHK1311.29-
Tower A44 BHK1262.70-
Tower A44 BHK1268.59-
Tower A54 BHK1311.29-
Tower A54 BHK1262.70-
Tower A54 BHK1268.59-
Tower A64 BHK1311.29-
Tower A64 BHK1262.70-
Tower A64 BHK1268.59-
Tower A74 BHK1311.29-
Tower A74 BHK1262.70-
Tower A74 BHK1268.59-
Tower A84 BHK1311.29-
Tower A84 BHK1262.70-
Tower A84 BHK1268.59-
Tower A94 BHK1311.29-
Tower A94 BHK1262.70-
Tower A94 BHK1268.59-
Tower A104 BHK1311.29-
Tower A104 BHK1262.70-
Tower A104 BHK1268.59-
Tower A114 BHK1311.29-
Tower A114 BHK1262.70-
Tower A114 BHK1268.59-
Tower A124 BHK1311.29-
Tower A124 BHK1262.70-
Tower A124 BHK1268.59-
Tower A134 BHK1311.29-
Tower A134 BHK1262.70-
Tower A134 BHK1268.59-
Tower A144 BHK1311.29-
Tower A144 BHK1262.70-
Tower A144 BHK1268.59-
Tower A154 BHK1311.29-
Tower A154 BHK1262.70-
Tower A154 BHK1268.59-
Tower A164 BHK1311.29-
Tower A164 BHK1262.70-
Tower A164 BHK1268.59-
Tower A174 BHK1311.29-
Tower A174 BHK1262.70-
Tower A174 BHK1268.59-
Tower A184 BHK1311.29-
Tower A184 BHK1262.70-
Tower A184 BHK1268.59-
Tower A194 BHK1311.29-
Tower A194 BHK1262.70-
Tower A194 BHK1268.59-
Tower A204 BHK1311.29-
Tower A204 BHK1262.70-
Tower A204 BHK1268.59-
Tower A214 BHK1311.29-
Tower A214 BHK1262.70-
Tower A214 BHK1268.59-
Tower A224 BHK1311.29-
Tower A224 BHK1262.70-
Tower A224 BHK1268.59-
Tower A234 BHK1311.29-
Tower A234 BHK1262.70-
Tower A234 BHK1268.59-
Tower A244 BHK1311.29-
Tower A244 BHK1262.70-
Tower A244 BHK1268.59-
Tower A254 BHK1311.29-
Tower A254 BHK1262.70-
Tower A254 BHK1268.59-
Tower A264 BHK1311.29-
Tower A264 BHK1262.70-
Tower A264 BHK1268.59-
Tower A274 BHK1311.29-
Tower A274 BHK1262.70-
Tower A274 BHK1268.59-
Tower A284 BHK1311.29-
Tower A284 BHK1262.70-
Tower A284 BHK1268.59-
Tower A294 BHK1311.29-
Tower A294 BHK1262.70-
Tower A294 BHK1268.59-
Tower A304 BHK1311.29-
Tower A304 BHK1262.70-
Tower A304 BHK1268.59-
Tower A314 BHK1311.29-
Tower A314 BHK1262.70-
Tower A314 BHK1268.59-
Tower A324 BHK1311.29-
Tower A324 BHK1262.70-
Tower A324 BHK1268.59-
Tower ABSMNTOTHER00-
Tower ABSMNT2OTHER00-
Tower ABSMNT3OTHER00-

Development Works

work_namedescription
Demarcation of PlotsWe have one plot of 9633.46 Sqmt having Main entrance gate from the 36 mtr wide front road
Boundary Wall2 m high and 230 mm thick Brick work and rcc work in column and beam. At the centre face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 7.5 mtr.
FootpathsWe will provide foot path
Water Supply Including Drinking Water FacilitiesWe will provide Two nos. of borings for the requirement of building through underground water tanks and water treatment plant if required and will be supplied through pipelines.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system. When come into force.
DrainStorm water Drain shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksIt is developed as green area with few hardscape. Rest will be used as park for all children and senior citizens. Swimming pool will also be provided in park area
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsOn First floor Club is proposed
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system., when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats , Hence we will follow all the Fire Safety norms and will fix all modern technique as per guidelines given in NBC 2016 and as per instructions of local CFO and will get NOC from Concern department
Social Infrastructure And Other Public Amenities Including Public Health ServicesN/A
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkN/A

Bank Details

Bank NameSTATE BANK OF INDIA
BranchSME BRANCH
Branch AddressCO-OP INDUSTRIAL ESTATE, KANPUR
Account HolderPALOMA REALTY LLP - Collection A/c - Paloma The Grandeur
Account Number42971326210
IFSC CodeSBIN0001080

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy