Passion Nand Niwas Palace
Siddhartha Developers
Kanpur Nagar, Uttar Pradesh
Approved
1st Jul 2024
Completed
30th Jun 2026
Registration No.
UPRERAPRJ233313/08/2024
Project Type
Residential
District
Kanpur Nagar
Taluka
Bilhaur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ233313/08/2024 |
| Project Status | Completed |
| Project Category | Residential |
| District | Kanpur Nagar |
| Taluka | Bilhaur |
| Start Date | 2024-07-01 |
| Completion Date | 2026-06-30 |
| Total Area (sqm) | 55754 |
| Project Cost (Lacs) | 2575 |
| Duration (Months) | 24 |
| Registration Fee | 284000 |
Promoter Details
| Promoter Name | Siddhartha Developers |
| Promoter ID | UPRERAPRM170865 |
| Mobile | 75******** |
Project Team
| role | name |
|---|---|
| Architect | RAJIV BAJPAI |
| Contractor | VIKAS AGARWAL C/o KANTI INFRABUILD PRIVATE LIMITED |
| Structural Engineer | Vipin Tiwari |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | ARAZI NO. 630,668KHA, 669KA,670,674/1,675/2 MIN.,675/1MIN,703/2MIN,703MIN/706/ 707/708/709 MIN./711MIN./713MIN.,671/672/673 AT VILLAGE BAIDANI TEHSIL BILHAUR & DISTRICT KANPUR NAGAR (UP) | 55,754.00 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Plot | 48 | 1 | |
| Plot | 58 | 1 | |
| Plot | 70 | 1 | |
| Plot | 76 | 1 | |
| Plot | 88 | 2 | |
| Plot | 96 | 2 | |
| Plot | 97 | 9 | |
| Plot | 99 | 6 | |
| Plot | 100 | 37 | |
| Plot | 101 | 3 | |
| Plot | 104 | 1 | |
| Plot | 107 | 2 | |
| Plot | 108 | 1 | |
| Plot | 109 | 2 | |
| Plot | 115 | 1 | |
| Plot | 116 | 1 | |
| Plot | 117 | 2 | |
| Plot | 119 | 3 | |
| Plot | 121 | 8 | |
| Plot | 126 | 3 | |
| Plot | 127 | 3 | |
| Plot | 128 | 7 | |
| Plot | 129 | 2 | |
| Plot | 130 | 1 | |
| Plot | 131 | 1 | |
| Plot | 135 | 1 | |
| Plot | 137 | 1 | |
| Plot | 139 | 1 | |
| Plot | 140 | 1 | |
| Plot | 146 | 2 | |
| Plot | 153 | 1 | |
| Plot | 159 | 1 | |
| Plot | 162 | 1 | |
| Plot | 163 | 1 | |
| Plot | 164 | 1 | |
| Plot | 172 | 1 | |
| Plot | 178 | 2 | |
| Plot | 191 | 10 | |
| Plot | 192 | 1 | |
| Plot | 197 | 1 | |
| Plot | 198 | 1 | |
| Plot | 199 | 2 | |
| Plot | 201 | 2 | |
| Plot | 202 | 1 | |
| Plot | 203 | 1 | |
| Plot | 204 | 1 | |
| Plot | 214 | 1 | |
| Plot | 238 | 1 | |
| Plot | 246 | 1 | |
| Plot | 285 | 1 | |
| Plot | 337 | 1 | |
| Plot | 353 | 1 | |
| Plot | 354 | 1 | |
| Plot | 357 | 1 | |
| Plot | 368 | 1 | |
| Plot | 397 | 1 | |
| Plot | 2868 | 1 | |
| Villa | 98 | 2 | 207 |
| Plot | 98 | 138 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have 286 plots of different sizes having 1 main entrance gate from the 60 m road on which the project is situated |
| Boundary Wall | 2 m high and 140 mm thick Brick work and rcc work in column and beam is proposed in the project |
| Road Work | From the main entrance gate we have connected 20-40 feet pathways to each existing plot. |
| Footpaths | We have provided 5 ft. footpath in parks of Kota stone in the project. |
| Water Supply Including Drinking Water Facilities | We will provide Two nos. of bore well for the requirement through underground pipelines in the project. |
| Sewer System | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be used in car washing , gardening and irrigation. |
| Drain | Storm water from Roads and other landscape area shall be connected to the drain pipes and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be excreted outside the premises. |
| Parks | We will provide green area with the different activities and the green area will have sports facilities for kids in our project |
| Tree Planting | We will provide many type of trees along the boundary wall & green area in our project |
| Design For Electric Supply Including Street Lighting | We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service in project. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be reused for gardening, utility like car wash and irrigation ,when come into force. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area and we will suggest to individual also to use. |
| Fire Protection And Fire Safety System | We will follow the local authorities requirements in our project |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | ICICI Bank |
| Branch | Civil Lines, Kanpur |
| Branch Address | Kan Chambers, G3 & G4 14/113, Civil Lines, Kanpur - 208001 |
| Account Holder | Siddhartha Developers Collection Account for Passion Nand Niwas Palace |
| Account Number | 779205000145 |
| IFSC Code | ICIC0007792 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate