SKY BUNGALOW
SHREESRI BUILDTECH PRIVATE LIMITED
Kanpur Nagar, Uttar Pradesh
Approved
1st Nov 2014
Pending
19th Sept 2026
Registration No.
UPRERAPRJ3298
Project Type
Residential
District
Kanpur Nagar
Taluka
Kanpur
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ3298 |
| Project Status | Ongoing |
| Project Category | Residential |
| District | Kanpur Nagar |
| Taluka | Kanpur |
| Start Date | 2014-11-01 |
| Completion Date | 2026-09-19 |
| Total Area (sqm) | 3763 |
| Project Cost (Lacs) | 9500 |
| Duration (Months) | 143 |
| Registration Fee | 24000 |
Promoter Details
| Promoter Name | SHREESRI BUILDTECH PRIVATE LIMITED |
| Promoter ID | UPRERAPRM1662 |
| Mobile | 73******** |
Project Team
| role | name |
|---|---|
| Architect | Mr. Sidhartha Singh |
| Contractor | Mr. Manoj Tiwari |
| Structural Engineer | Pioneer Consulting Engineering Pvt Ltd |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Plot No. GH-1, Vinayak Shree NRI City, Kanpur | 3762 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A8 | 1 | 5 BHK | 2 | 236.1 | - |
| A8 | 1 | 5 BHK | 2 | 253.6 | - |
| A8 | 1 | OTHER | 2 | 285.6 | - |
| A8 | 2 | 5 BHK | 2 | 236.1 | - |
| A8 | 2 | 5 BHK | 2 | 253.6 | - |
| A8 | 2 | OTHER | 2 | 285.6 | - |
| A8 | 3 | 5 BHK | 2 | 236.10 | - |
| A8 | 3 | 5 BHK | 2 | 253.6 | - |
| A8 | 3 | OTHER | 2 | 285.60 | - |
| A8 | 4 | 5 BHK | 2 | 236.10 | - |
| A8 | 4 | 5 BHK | 2 | 253.60 | - |
| A8 | 4 | OTHER | 2 | 285.6 | - |
| A8 | 5 | 5 BHK | 2 | 236.10 | - |
| A8 | 5 | 5 BHK | 2 | 253.60 | - |
| A8 | 5 | OTHER | 2 | 285.6 | - |
| A8 | 6 | 5 BHK | 2 | 236.10 | - |
| A8 | 6 | 5 BHK | 2 | 253.60 | - |
| A8 | 6 | OTHER | 2 | 285.6 | - |
| A8 | 7 | 5 BHK | 2 | 253.6 | - |
| A8 | 7 | OTHER | 2 | 285.6 | - |
| A8 | 8 | 5 BHK | 2 | 236.10 | - |
| A8 | 8 | 5 BHK | 2 | 253.60 | - |
| A8 | 8 | OTHER | 2 | 285.60 | - |
| A8 | 9 | 5 BHK | 2 | 236.10 | - |
| A8 | 9 | 5 BHK | 2 | 253.60 | - |
| A8 | 9 | OTHER | 2 | 285.60 | - |
| A8 | 10 | 5 BHK | 2 | 236.10 | - |
| A8 | 10 | 5 BHK | 2 | 253.60 | - |
| A8 | 10 | OTHER | 2 | 285.60 | - |
| A8 | 11 | 5 BHK | 2 | 236.10 | - |
| A8 | 11 | 5 BHK | 2 | 253.6 | - |
| A8 | 11 | OTHER | 2 | 285.60 | - |
| A8 | 12 | 5 BHK | 2 | 236.10 | - |
| A8 | 12 | 5 BHK | 2 | 253.60 | - |
| A8 | 12 | OTHER | 2 | 285.60 | - |
| A8 | 13 | 5 BHK | 2 | 236.10 | - |
| A8 | 13 | 5 BHK | 2 | 253.60 | - |
| A8 | 13 | OTHER | 2 | 285.60 | - |
| A8 | 14 | 5 BHK | 2 | 236.10 | - |
| A8 | 14 | 5 BHK | 2 | 253.60 | - |
| A8 | 14 | OTHER | 2 | 285.60 | - |
| A8 | 15 | 5 BHK | 2 | 236.10 | - |
| A8 | 15 | 5 BHK | 2 | 253.60 | - |
| A8 | 15 | OTHER | 2 | 285.60 | - |
| A8 | 16 | 5 BHK | 2 | 236.10 | - |
| A8 | 16 | 5 BHK | 2 | 253.60 | - |
| A8 | 16 | OTHER | 2 | 285.60 | - |
| A8 | 17 | 5 BHK | 1 | 326.3 | - |
| A8 | 17 | 5 BHK | 1 | 328.39 | - |
| A8 | 17 | 4 BHK | 1 | 263.84 | - |
| A8 | 17 | 4 BHK | 1 | 264.04 | - |
| A8 | 17 | 4 BHK+ STUDY | 1 | 317.46 | - |
| A8 | 17 | 4 BHK+STUDY | 1 | 317.17 | - |
| A8 | 18 | 5 BHK | 1 | 326.3 | - |
| A8 | 18 | 5 BHK | 1 | 328.39 | - |
| A8 | 18 | 4 BHK | 1 | 263.84 | - |
| A8 | 18 | 4 BHK | 1 | 264.04 | - |
| A8 | 18 | 4 BHK+ STUDY | 1 | 317.46 | - |
| A8 | 18 | 4 BHK+STUDY | 1 | 317.17 | - |
| A8 | 19 | 5 BHK | 1 | 326.28 | - |
| A8 | 19 | 5 BHK | 1 | 327.83 | - |
| A8 | 19 | 4 BHK | 1 | 264.46 | - |
| A8 | 19 | 4 BHK | 1 | 264.04 | - |
| A8 | 19 | 4 BHK+ STUDY | 1 | 326 | - |
| A8 | 19 | 4 BHK+STUDY | 1 | 316.49 | - |
| A8 | 20 | 5 BHK | 1 | 326.28 | - |
| A8 | 20 | 5 BHK | 1 | 327.83 | - |
| A8 | 20 | REFUSE AREA | 0 | 0 | - |
| A8 | 20 | 4 BHK | 1 | 264.04 | - |
| A8 | 20 | 4 BHK+ STUDY | 1 | 317.46 | - |
| A8 | 20 | 4 BHK+STUDY | 1 | 316.91 | - |
| A8 | 21 | 5 BHK | 1 | 326.28 | - |
| A8 | 21 | 5 BHK | 1 | 327.83 | - |
| A8 | 21 | 4 BHK | 1 | 264.46 | - |
| A8 | 21 | 4 BHK | 1 | 264.04 | - |
| A8 | 21 | 4 BHK+ STUDY | 1 | 326 | - |
| A8 | 21 | 4 BHK+STUDY | 1 | 316.49 | - |
| A8 | 22 | 5 BHK | 1 | 326.28 | - |
| A8 | 22 | 5 BHK | 1 | 327.83 | - |
| A8 | 22 | 4 BHK | 1 | 264.46 | - |
| A8 | 22 | 4 BHK | 1 | 264.04 | - |
| A8 | 22 | 4 BHK+ STUDY | 1 | 326 | - |
| A8 | 22 | 4 BHK+STUDY | 1 | 316.49 | - |
| A8 | 23 | 5 BHK | 1 | 326.28 | - |
| A8 | 23 | 5 BHK | 1 | 327.83 | - |
| A8 | 23 | 4 BHK | 1 | 264.46 | - |
| A8 | 23 | 4 BHK | 1 | 264.04 | - |
| A8 | 23 | 4 BHK+ STUDY | 1 | 326 | - |
| A8 | 23 | 4 BHK+STUDY | 1 | 316.49 | - |
| A8 | 24 | 5 BHK | 1 | 326.28 | - |
| A8 | 24 | 5 BHK | 1 | 327.83 | - |
| A8 | 24 | 4 BHK | 1 | 264.46 | - |
| A8 | 24 | 4 BHK | 1 | 264.04 | - |
| A8 | 24 | 4 BHK+ STUDY | 1 | 326 | - |
| A8 | 24 | 4 BHK+STUDY | 1 | 316.49 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Already Completed |
| Boundary Wall | Temporary Boundary Wall is already present at the sitee. However, permanent boundary wall made of ACC block and RCC is under construction At the center face of boundary wall there would be a Logo of Sky Bungalow which give a beautiful iconic design to boundary wall. |
| Road Work | Approach road from the main gate of NRI City to the project site is well developed. Internal roads are already demarcated and shall be develpoed at appropriate stage of the project |
| Footpaths | Interlock footpath at both side of the apporach road with beautiful pattern is already developed |
| Water Supply Including Drinking Water Facilities | Project shall rely for drinking water supply through bore well as well as through Municipal Corporation. |
| Sewer System | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system. |
| Drain | Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| Parks | 1 main park nearby temple having kids play area is already developed. One more park is proosed to be developed at the appropriate stage of the project |
| Tree Planting | More than 300 trees have already been planted. However, more tree plantation is in process |
| Design For Electric Supply Including Street Lighting | Designing of Electrc supply including street lighting is already being done. |
| Community Buildings | It shall be developed at appropriate stage of the project |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system. |
| Solid Waste Management And Disposal System | "There are a proper garbage collection area provided for the solid waste management." |
| Water Conservation System | We are providing Fitting and fixtures having low outflow of water as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use LED lights Fitting. |
| Fire Protection And Fire Safety System | Project hall have fire protection and fire safety system as per regulatory norms |
| Social Infrastructure And Other Public Amenities Including Public Health Services | "Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room. All Sewerage shall be go to the STP. Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain." |
| Emergency Evacuation Services | Project shall have emergency evacuation plan as per the requirement of regulatory authorities |
| Other Miscellaneous Work | Nil |
Bank Details
| Bank Name | PUNJAB NATIONAL BANK |
| Branch | PUNJAB NATIONAL BANK SWAROOP NAGAR KANPUR |
| Branch Address | SWAROOP NAGAR KANPUR |
| Account Holder | SHREESRI BUILDTECH PRIVATE LIMITED SKY BUNGALOW ESCROW A/C |
| Account Number | 0727002100054800 |
| IFSC Code | PUNB0072700 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





