New Launch - India Real Estate Report 2026.

THE PEAK

SKYLINE INFRA HEIGHTS PRIVATE LIMITED

Kanpur Nagar, Uttar Pradesh

RERA approved

Approved

1st Apr 2021

Project completed

Completed

30th Sept 2024

Registration No.

UPRERAPRJ491603

Project Type

Residential

District

Kanpur Nagar

Taluka

Kanpur

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ491603
Project StatusCompleted
Project CategoryResidential
DistrictKanpur Nagar
TalukaKanpur
Start Date2021-04-01
Completion Date2024-09-30
Total Area (sqm)9100
Project Cost (Lacs)2500
Duration (Months)42
Registration Fee50500

Promoter Details

Promoter NameSKYLINE INFRA HEIGHTS PRIVATE LIMITED
Promoter IDUPRERAPRM4280
Mobile93********

Project Team

rolename
ArchitectTARUN BHARTI
ContractorRAMPAL
Structural Engineersantosh kumar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra6 KA2000
Khasra6 KHA600
Khasra6 KA MI2000
Khasra7 MI4500

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
A13 BHK5472.54-
A23 BHK5472.54-
A33 BHK5472.54-
A43 BHK5472.54-
A53 BHK5472.54-
A63 BHK5472.54-
A73 BHK5472.54-
A83 BHK5472.54-
A93 BHK5472.54-
A103 BHK5472.54-
A113 BHK5472.54-
A123 BHK5472.54-
B123 BHK5472.54-
B113 BHK5472.54-
B103 BHK5472.54-
B93 BHK5472.54-
B83 BHK5472.54-
B73 BHK5472.54-
B63 BHK5472.54-
B53 BHK5472.54-
B43 BHK5472.54-
B33 BHK5472.54-
B23 BHK5472.54-
B13 BHK5472.54-
C13 BHK5472.54-
C23 BHK5472.54-
C33 BHK5472.54-
C43 BHK5472.54-
C53 BHK5472.54-
C63 BHK5472.54-
C73 BHK5472.54-
C83 BHK5472.54-
C93 BHK5472.54-
C103 BHK5472.54-
C113 BHK5472.54-
C123 BHK5472.54-
D123 BHK5472.54-
D113 BHK5472.54-
D103 BHK5472.54-
D93 BHK5472.54-
D83 BHK5472.54-
D73 BHK5472.54-
D63 BHK5472.54-
D53 BHK5472.54-
D43 BHK5472.54-
D33 BHK5472.54-
D23 BHK5472.54-
D13 BHK5472.54-

Development Works

work_namedescription
Demarcation of PlotsNo demarcation of plots required since it is a multi story project consisting of four towers. WEBSITE ADDRESS WWW.THEPEAKSKYLINE.COM/HOME.HTM
Boundary WallBoundary wall of bricks will be made with concrete pillars in between.
Road Work6 ft. wide concrete road will be made surrounding the tower blocks.
FootpathsNOT REQUIRED
Water Supply Including Drinking Water FacilitiesWater will be drawn from underground using submersible pumps and will be supplied through overhead tanks.
Sewer SystemPVC pipes will be used for sewage which will connect chambers. All sewage will be taken to STP from which it will be drawn into municipal lines in front of the project.
DrainDrains will be made to collect water of all open areas and will be connected to sewage chambers.
ParksCentral lawn is planned in between 4 blocks. 15 percent green area is being left in the project as per norms which will be properly landscaped.
Tree PlantingAppropriate trees suitable to the climate will be planted and maintained.
Design For Electric Supply Including Street LightingAt appropriate distances street lights will be installed to ensure proper illumination during night.
Community BuildingsClub house will be made with Gym and other entertainment facilities at designated place.
Treatment and Disposal System of Sewage and Sullage waterSTP will be used for treatment of sewage and sullage water. Treated water will be used for watering plants as well as for flushing. Remaining waste water will be disposed in municipal lines.
Solid Waste Management And Disposal SystemDustbins will be installed in all blocks from where municipal persons will collect garbage.
Water Conservation SystemRain water harvesting as given in municipal plans will be made functional. All roof top water will be taken under ground through reverse boring.
Energy Management System Including Use of Renewable Energy25 k.w. solar roof top electricity plant is planned to provide power to common areas.
Fire Protection And Fire Safety SystemAll fire protection and safety systems will be installed as per NOC given by the fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesClub house is proposed to be made with GYM and other entertainment activities.
Emergency Evacuation ServicesApart from 2 lifts and 1 regular staircase in each block a fire escape stair case is made for emergency evacuation.
Other Miscellaneous WorkThere are multiple things like swimming pool, home theatre etc. which will be given.

Bank Details

Bank NameSTATE BANK OF INDIA
BranchSME PHOOL BAGH BRANCH
Branch Address24/66, BIRHANA ROAD, KANPUR
Account HolderSKYLINE INFRA HEIGHTS PRIVATE LIMITED
Account Number036625678232
IFSC CodeSBIN0000242

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy