7th Avenue
TULIP HOUSING
Lucknow, Uttar Pradesh
Approved
1st Oct 2019
Completed
18th Sept 2025
Registration No.
UPRERAPRJ541330
Project Type
Commercial
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ541330 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2019-10-01 |
| Completion Date | 2025-09-18 |
| Total Area (sqm) | 11780 |
| Project Cost (Lacs) | 4000 |
| Duration (Months) | 72 |
| Registration Fee | 128000 |
Promoter Details
| Promoter Name | TULIP HOUSING |
| Promoter ID | UPRERAPRM93661 |
| Mobile | 94******** |
Project Team
| role | name |
|---|---|
| Architect | Design Group |
| Contractor | V S Enterprises |
| Structural Engineer | Capt. Manoj Wascon |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | Undived share in Land in Khasra no. 18,19,20,21 and 22 in Paarth Nu for Tower-3 | 3954.63 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 7th Avenue | 1 | OTHER | 6 | 590.92 | - |
| 7th Avenue | 2 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 3 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 4 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 5 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 6 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 7 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 8 | OTHER | 6 | 590.92 | - |
| 7TH AVENUE | 9 | OTHER | 1 | 524.93 | - |
| 7th Avenue | 10 | STUDIO | 12 | 346.08 | - |
| 7th Avenue | 11 | STUDIO | 12 | 346.08 | - |
| 7th Avenue | 12 | STUDIO | 12 | 346.08 | - |
| 7th Avenue | 13 | STUDIO | 12 | 346.08 | - |
| 7th Avenue | 14 | STUDIO | 12 | 346.08 | - |
| 7th Avenue | 15 | STUDIO | 12 | 346.08 | - |
| 7th Avenue | 16 | STUDIO | 12 | 346.08 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The plots are not being developed. Since it is a commercial project, we shall be demarcating the shops/offices/studio apartment/food court as per the Sanction Plan |
| Boundary Wall | The boundry wall are not required to be constructed as per the Sanction Plan. However since this FSI is purchased from Paarth Infrabuild which have developed the township, the boundry wall for the entire township has already been developed. |
| Road Work | The internal road is to be done by Paarth Infrabuild Pvt. Ltd. |
| Footpaths | There is no footpaths in the project. |
| Water Supply Including Drinking Water Facilities | It will be provided by the promoter |
| Sewer System | The promoter will connect its system to the STP developed by by Paarth Infrabuild Pvt. Ltd. |
| Drain | The promoter will provided proper drainage for its building and will connect its sytem with the STP of Paarth Infrabuild Pvt. Ltd.. The promoter will provide a separate tanks for drainage prupose |
| Parks | The promoter has purchased the FSI from the Paarth Infrabuild Pvt. Ltd., hence, the development of parks are to be done by them. |
| Tree Planting | To be done by the promoter for the area developed by it, for remaining common area to be done by Paarth Infrabuild Pvt. Ltd. |
| Design For Electric Supply Including Street Lighting | The Electric supply shall be provided by the promoter. For this purpose the necessary work and the Electric NOC at the time of offer of possession shall be taken by the promoter |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | The promoter will build the necessary system for sewage and sullage water and it will be connected to the main STP built by Paarth Infrabuild Pvt. Ltd. |
| Solid Waste Management And Disposal System | The promoter will connect its drainage pipes with the STP built by Paarth Infrabuild Pvt. Ltd. |
| Water Conservation System | The rain water harvesting will be done as per the applicable guidelines |
| Energy Management System Including Use of Renewable Energy | The energy management shall be done by the promoter. The system shall be developed in such manner so that maximum utilisation of resources are done. However, since it is not a green building, hence, the guidelines of green building will not be applicable in construction |
| Fire Protection And Fire Safety System | To be done by the promoter as per the applicable guidelines |
| Social Infrastructure And Other Public Amenities Including Public Health Services | The social infrastructure and public amenities such as toilets shall be part of the project. |
| Emergency Evacuation Services | It shall be as per the Fire Department guidelines and the Fire NOC shall be taken from them, |
| Other Miscellaneous Work | To be done as per the sanctioned plan |
Bank Details
| Bank Name | VIJAYA BANK NOW BANK OF BARODA |
| Branch | JOPPLING ROAD |
| Branch Address | GOKHALE MARG, LUCKNOW |
| Account Holder | TULIP HOUSING |
| Account Number | 716100301000184 |
| IFSC Code | VIJB0007161 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in