New Launch - India Real Estate Report 2026.

AMOR

CCS INFRATECH

Lucknow, Uttar Pradesh

RERA approved

Approved

23rd Feb 2025

Completion pending

Pending

1st Jan 2030

Registration No.

UPRERAPRJ389222/03/2025

Project Type

Residential

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ389222/03/2025
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaLucknow
Start Date2025-02-23
Completion Date2030-01-01
Total Area (sqm)35376.59
Project Cost (Lacs)14700
Duration (Months)59
Registration Fee188500

Promoter Details

Promoter NameCCS INFRATECH
Promoter IDUPRERAPRM343059
Mobile98********

Project Team

rolename
ArchitectMr Abdul Aziz
ContractorCCS INFRATECH
Structural EngineerANAS SIDDIQUI

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra506SA36685

Development Works

work_namedescription
Demarcation of PlotsPlots are very well demarcated at the site and land is under possession. Development work is underway with essential infrastructure in progress.
Boundary WallA 2 meter high boundary wall is designed to enhance security and privacy, creating a safe and well-defined perimeter for the site . it serves as a protective barrier, restricting unauthorized access while maintaining a clear property boundary.
Road WorkA blacktop road is proposed with 9 meter and 12 meter widths, ensuring durability and smooth traffic flow. The construction will include subgrade prepration, base layers, and bituminous surfacing for strength and longevity.
FootpathsA footpath will be constructed alongside the road for pedestrian saftey and convenience, ensuring smooth and accessible movement.
Water Supply Including Drinking Water FacilitiesWe will provide Separate borewells between every two plots as drinking water facilities to ensure a reliable drinking water supply for residents.
Sewer SystemAll Sewage water will be directed to the on site Sewage Treatment Plant(STP) for proper waste management.
DrainAll the Drainage Water will be directed to the on site Sewage Treatment Plant (STP) For proper waste Management.
ParksWe will develop a green Park areas Compirising 15.01 percent of the total township Area . This will Include Parks and green belts with lush landscaping .
Tree PlantingWe will Plant evergreen Trees and Plants Ranging from 1 meter to 4 meter in height .
Design For Electric Supply Including Street LightingWe will design and implement the system as per local electricity Board . We will use LED light fitting in extrenal Areas.
Community BuildingsN/A
Treatment and Disposal System of Sewage and Sullage waterAll the Treatment and Disposal water will be directed to on site Sewage Treatment Plant (STP) for proper waste Disposal .
Solid Waste Management And Disposal SystemThere is Provision of Garbage Collection center for Solid Waste Managemnt and disposal system
Water Conservation SystemN/A
Energy Management System Including Use of Renewable EnergyN/A
Fire Protection And Fire Safety SystemN/A
Social Infrastructure And Other Public Amenities Including Public Health ServicesN/A
Emergency Evacuation ServicesN/A
Other Miscellaneous WorkN/A

Bank Details

Bank NamePUNJAB NATIONAL BANK
BranchHAZRATGANJ LUCKNOW
Branch AddressPNB HALWASIYA HAZRATGANJ LUCKNOW
Account HolderCCS INFRATECH COLLECTION ACCOUNT FOR AMOR
Account Number0294002900000154
IFSC CodePUNB0029400

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy