AMOR
CCS INFRATECH
Lucknow, Uttar Pradesh
Approved
23rd Feb 2025
Pending
1st Jan 2030
Registration No.
UPRERAPRJ389222/03/2025
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ389222/03/2025 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2025-02-23 |
| Completion Date | 2030-01-01 |
| Total Area (sqm) | 35376.59 |
| Project Cost (Lacs) | 14700 |
| Duration (Months) | 59 |
| Registration Fee | 188500 |
Promoter Details
| Promoter Name | CCS INFRATECH |
| Promoter ID | UPRERAPRM343059 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Mr Abdul Aziz |
| Contractor | CCS INFRATECH |
| Structural Engineer | ANAS SIDDIQUI |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 506SA | 36685 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plots are very well demarcated at the site and land is under possession. Development work is underway with essential infrastructure in progress. |
| Boundary Wall | A 2 meter high boundary wall is designed to enhance security and privacy, creating a safe and well-defined perimeter for the site . it serves as a protective barrier, restricting unauthorized access while maintaining a clear property boundary. |
| Road Work | A blacktop road is proposed with 9 meter and 12 meter widths, ensuring durability and smooth traffic flow. The construction will include subgrade prepration, base layers, and bituminous surfacing for strength and longevity. |
| Footpaths | A footpath will be constructed alongside the road for pedestrian saftey and convenience, ensuring smooth and accessible movement. |
| Water Supply Including Drinking Water Facilities | We will provide Separate borewells between every two plots as drinking water facilities to ensure a reliable drinking water supply for residents. |
| Sewer System | All Sewage water will be directed to the on site Sewage Treatment Plant(STP) for proper waste management. |
| Drain | All the Drainage Water will be directed to the on site Sewage Treatment Plant (STP) For proper waste Management. |
| Parks | We will develop a green Park areas Compirising 15.01 percent of the total township Area . This will Include Parks and green belts with lush landscaping . |
| Tree Planting | We will Plant evergreen Trees and Plants Ranging from 1 meter to 4 meter in height . |
| Design For Electric Supply Including Street Lighting | We will design and implement the system as per local electricity Board . We will use LED light fitting in extrenal Areas. |
| Community Buildings | N/A |
| Treatment and Disposal System of Sewage and Sullage water | All the Treatment and Disposal water will be directed to on site Sewage Treatment Plant (STP) for proper waste Disposal . |
| Solid Waste Management And Disposal System | There is Provision of Garbage Collection center for Solid Waste Managemnt and disposal system |
| Water Conservation System | N/A |
| Energy Management System Including Use of Renewable Energy | N/A |
| Fire Protection And Fire Safety System | N/A |
| Social Infrastructure And Other Public Amenities Including Public Health Services | N/A |
| Emergency Evacuation Services | N/A |
| Other Miscellaneous Work | N/A |
Bank Details
| Bank Name | PUNJAB NATIONAL BANK |
| Branch | HAZRATGANJ LUCKNOW |
| Branch Address | PNB HALWASIYA HAZRATGANJ LUCKNOW |
| Account Holder | CCS INFRATECH COLLECTION ACCOUNT FOR AMOR |
| Account Number | 0294002900000154 |
| IFSC Code | PUNB0029400 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





