AMRAWATI SPORTS CITY
GOLDFINCH REALTY
Lucknow, Uttar Pradesh
Approved
1st Jul 2025
Pending
6th Jan 2030
Registration No.
UPRERAPRJ547032/06/2025
Project Type
Residential
District
Lucknow
Taluka
Bakshi Ka Talab**
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ547032/06/2025 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Bakshi Ka Talab** |
| Start Date | 2025-07-01 |
| Completion Date | 2030-01-06 |
| Total Area (sqm) | 61885 |
| Project Cost (Lacs) | 6200 |
| Duration (Months) | 55 |
| Registration Fee | 314500 |
Promoter Details
| Promoter Name | GOLDFINCH REALTY |
| Promoter ID | UPRERAPRM302588 |
| Mobile | 94******** |
Project Team
| role | name |
|---|---|
| Architect | PANKAJ SANON |
| Contractor | ARYAN CONSTRUCTION |
| Structural Engineer | VARTIKA PRAJAPATI |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 426, 427, 432 | 61885 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | WE HAVE RESIDENCIAL AREA OF SIZE 61885.16 SQMT HAVING , 2 MAIN ENTRANCE AND 1 EXIT GATE FROM THE 45M WIDE FRONT ROD. |
| Boundary Wall | THE M30 RCC WALL WITH GRILL OF HIGH 1.8 M WILL BE CONSTRUCTED ALONG THE PERIPHARY OF THE PLOT. |
| Road Work | THE INTERNAL ROADS WILL BE CONSTRUCTED AS PER THE SANCTION PLAN HAVING 6M WIDTH. THE ROAD WILL BE MADE OFF RCC/PAVERS. THE THICKNESS OF RCC ROAD WILL BE 150MM AND M30 GRADE. THE EXTERNAL ROAD IS ALREADY CONSTRUCTED BY LDA |
| Footpaths | THE FOOTHPATH OR OTHER PUBLIC CARES SHALL BE CONSTRUCTED AS OER THE LANDSCAPE PLANS. THE FOOTPATH SHALL BE MADE OF RCC/CHECKERRED TILES/PAVERS/GRAVEL. THE WIDTH OF FOOTHPATH SHALL BE AS PER THE LANDSCAPING PLAN. |
| Water Supply Including Drinking Water Facilities | THE INTERNAL DISTRIBUTION OF WATER SUPPLY UPTO THE PUMPING STATION. UNERGROUND STORAGE , PUMPING TO OVERHEAD TANKS SHALL BE DONE BY US. THE WATER SUPPLY LINES SHALL BE MADE OF PVC, CPVC AND GI . THE UGT AND OHT OF REQUIREDCAPACITY SHALL BE CONSTRUCTED BY RCC M30 GRADE. THE WATER SUPPLY DISTRIBUATION FROM TO OHT TO INDIVIDUAL PLOTS SHALL BE DONE WITH UPVC/CPVC WITH PRV. THE SEPRATE SYSTEM OF DISTRIBUTION OF RECYCLED WATER WILL BE DONE WITH UPVC PIPES |
| Sewer System | THE INTERNAL COLLECTION OF SEWAGE SHALL BE DONE THROUGH RCC SEWER LINES WITH MANHOLES AT REQUIRED DISTANCE . THISSEWAGE WILL BE FURTHER TREATEDIN THE STP. THE TREATED WATER FROM STP SHALL BE USED FOR LANDSCAPING AND FLUSHING PURPOSE. THE EXCESS OF TREATED WATER IF ANY SHALL BE DISPOSED IN MUNICIPAL SEWER SYSTEM . THE STP WILL BE BASED ON MBBR TECHNOLOGY. |
| Drain | THE STORM WATER DRAIN SHALL BE CONSTRUCTEDAS PER THE DRAINAGE PLAN AND DISPOSED IN MUNICIPAL DRAIN PROVIDED BY LDA. THE RAIWATER SHALL BE COLLECTED AND WILL BE USED TO RECHARGE UNDERGROUND WATER. |
| Parks | THE PARK AND PUBLIC AREA WILL BE DEVELOPED AS PER THE LANDSCAPING PLAN WITH VARIOUS PUBLIC AMENITIES CHILDREN PLAY. AREA , ELDERLY SITTING, JOGGING TRACK, YOGA SPACES , OUTDOOR GYM ETC. THE LOCAL PLANTS WILL BE USED ALONG THE BOUNDARY WALL. THE VARIOUS SHRUBS AND PLANTS WILL BE PLANTED THROUGH OUT THE LANDSCAPING ACCORDING TO LAND SCAPING PLAN. |
| Tree Planting | THE TRESS WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECTS AND ALONG THE BOUNDARY WALLS. |
| Design For Electric Supply Including Street Lighting | ELECTRCI LAYOUT AND CAPACITY WILL BE INSTALLED TO SUFFICE THE DOMESTIC USE. ALL ELECTRIC CABLING WILL BE UNDERGROUND AND STREETLIGHTS WILL BE AS PER LAYOUT WORKING DRAWING. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | THE ENTIRE SEWER WATER WILL BE TREATED IN STP (MBBR TECHNOLOGY) AND TREATED WATER SHALL BE USED FOR IRRIGATION AND FLUSHING PURPOSE . REST TREATED WATER WILL BE DISPOSED IN MUNICPAL SEWAGE LINE. |
| Solid Waste Management And Disposal System | DOOR TO DOOR SOLID WASTE WILL BE COLLECTED FROM ALL RESIDENTIAL PLOTS. THE ORGANIC PORTION OF WASTE WILL BE COMPOSTED AT SITE IN OWC AND TREATED MANURE WILL BE USED FOR LANDSCAPE PURPOSE . THE OTHER WASTE WILL BE SOLD TO AUTHORISED RECYCLE AGENTS. |
| Water Conservation System | RAIN WATER WILL BE COLLETEC AND USED IN INDERGROUND WATER TABLE RECHARGINGTHROUGH RAIN WATER HARVESTING SYSTEM. A PART FROM THIS, LOW FLOW SANITARY FIXTURES WILL BE USE TO SAVE FRESH WATER. |
| Energy Management System Including Use of Renewable Energy | WE WILL BE USEING ENERGY EFFICENT LIGHT FIXTURE, ELECTRIC PUMPS TO SAVE ELECTRICITY , ALSO SPECIAL GLASS WILL BE USE TO MINIMUM HEAT IN HOMES, RESSULTING LOAD IN AC SYSTEMS. A SOLAR SYSTEM WILL ALSO BE INSTALLEDFOR OPEN AREA LIGHTING. |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | OPEN GYM, POOLS, YOGA AREA , SPORTS PLAY AREA, GARDEN SITTING ETC. |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | ITS GATED HAVING FULL SECURITY , CCTV CAMERAS , SUPPORT FACILITIES WITH POWER BACKUP SYSTEM, STP, OWC ETC. |
Bank Details
| Bank Name | ICICI BANK |
| Branch | VIBHUTI KHAND |
| Branch Address | VIBHUTI KHAND , GOMTI NAGAR, LUCKNOW-226010 |
| Account Holder | GOLDFINCH REALTY COLLECTION ACCOUNT FOR AMRAWATI SPORTS CITY |
| Account Number | 469805000070 |
| IFSC Code | ICIC0001671 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





