New Launch - India Real Estate Report 2026.

ANANT NAGAR YOJNA ADITYA KHAND

Lucknow Development Authority

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Apr 2025

Completion pending

Pending

9th Mar 2030

Registration No.

UPRERAPRJ283066/04/2025

Project Type

Mixed

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ283066/04/2025
Project StatusNew
Project CategoryMixed
DistrictLucknow
TalukaSarojini Nagar
Start Date2025-04-01
Completion Date2030-03-09
Total Area (sqm)114170
Project Cost (Lacs)24226
Duration (Months)60
Registration Fee864000

Promoter Details

Promoter NameLucknow Development Authority
Promoter IDUPRERAPRM10102
Mobile99********

Project Team

rolename
ArchitectMURALAGE
ContractorLUCKNOW DEVELOPMENT AUTHORITY
Structural EngineerSANJEEV Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra5841800
Khasra575250
Khasra6403210
Khasra558K3220
Khasra634K160
Khasra6331900
Khasra6351390
Khasra637280
Khasra645320
Khasra6291520
Khasra632480
Khasra629794
Khasra629726
Khasra632KH480
Khasra632K380
Khasra563760
Khasra5722100
Khasra5711320
Khasra652A1220
Khasra652B270
Khasra5701470
Khasra560630
Khasra561380
Khasra5794100
Khasra646540
Khasra6245800
Khasra6443270
Khasra6202620
Khasra619290
Khasra620530
Khasra580A3200
Khasra580B1880
Khasra565250
Khasra5622150
Khasra559250
Khasra639A730
Khasra639B350
Khasra650310
Khasra647310
Khasra648160
Khasra649320
Khasra5661010
Khasra6231390
Khasra623K380
Khasra6253700
Khasra6261520
Khasra6272150
Khasra628460
Khasra6423620
Khasra6212530
Khasra6223790
Khasra5723920
Khasra576130
Khasra5814960
Khasra5821420
Khasra63180
Khasra2542120
Khasra2713690
Khasra56660
Khasra558Kh190
Khasra5642310
Khasra565kh380
Khasra573280
Khasra574130
Khasra577250
Khasra578100
Khasra582B260
Khasra620CH4060
Khasra628KH180
Khasra630570
Khasra634Kh920
Khasra635K5060
Khasra636760
Khasra637Kh280
Khasra643260
Khasra651400
Khasra659240
Khasra580A3220
Khasra580B1880
Khasra582A1420
Khasra583A890
Khasra583B790
Khasra617k250
Khasra617Kh2530
Khasra617G1020
Khasra634K160
Khasra634Kh920
Khasra639A730
Khasra639B350
Khasra652A1220
Khasra652B270
Khasra614G690
Khasra614K1830
Khasra618100

Development Works

work_namedescription
Demarcation of PlotsDemarcation of plots will be done after the development work will be completed
Boundary WallNo boundary wall is propsoed
Road WorkRoad will be constructed as per sanction layout plan. Earth filling work sub grade preparation GSB 200 mm laying and final premix carpet will be done in stepwise development work.The roads in sector 07 has been designed with varying width 12,18 & 9m. Pathways, Cycle Track, are provided to enhance mobility
FootpathsThe footpath will be developed with interlocking tiles and electric trench will run through footpath. The footpath will be 1.2mtrs to 1.8 mtrs as per road width.
Water Supply Including Drinking Water FacilitiesThe water will be supplied through borewell and Overhead Tanks and UG Tanks for commercial tanks. The diameter of the water pipeline is 100mm to 250mm as per population and load demand.
Sewer SystemThe provision of seweage chamber for sector -06 to manage waste water efficiently. The diameter of sewage pipe is 200mm to 800mm as per population. The material of pipe is DWC SN8.
DrainSurafce drain is of RCC and the diameter is 300mm to 1200mm and depth is 300mm to 1800mm
ParksParks will be developed as per sanction layout and the parks will have brick walls of height 5ft as per design
Tree PlantingLandscaping & Tree Plantation on green belts along roads and parks to create a greener, healthier & more pleasant environment.
Design For Electric Supply Including Street LightingElectric work is proposed including street light on each external road through electric pole. Street Lighting is provided for the road visibility. The main substation is 220/33KV and second tier substation is 33/11 KVA and sectoral 11/.433 KV substation.
Community BuildingsA area of 3870.25Sqm 6/COM-01 is provided for community Buildings
Treatment and Disposal System of Sewage and Sullage waterIt Has been provided on the sector-08
Solid Waste Management And Disposal SystemA Big plot Has been provided for garbage of entire sector will be collected in sector-01 and A garbage plot has been provided for each sector.
Water Conservation SystemRain water harvesting pits are provided on the parks.
Energy Management System Including Use of Renewable Energy100% Led Lighting Considered Instead Of Cfl Or Incandescent Lamps,Provision Of Minimum 3 Star Rated Electrical Equipments,Provision Of Energy Management Strategy & Analysis Provisions With Multifunction Meters Compatible With Scada,Considering 2 % Voltage Drop For Power Distribution In Lt & 4% In Ht,Plug In Provision In Feeder Panels For Other Renewable Sources To Reduce Distribution Losses ,Astronomical & Timer Based Switching For Street Lighting
Fire Protection And Fire Safety System1 FIRE STATION plot has been provided for sector 6 and 7. the area of 7/FS-01= 1978.00 Sqm is provided.
Social Infrastructure And Other Public Amenities Including Public Health ServicesArea reserved for such amenities are demarcated in the sanction layoutt
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameICICI BANK
BranchASHOK MARG BRANCH
Branch Address28/10 ASHOK MARG HAZRATGANJ
Account HolderSECRETARY LDA COLLECTION ACCOUNT FOR ANANT NAGAR YOJNA ADITYA KHAND
Account Number628101111877
IFSC CodeICIC0006281

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy