Armaan Muskan
M/s Shalimar KSMB Projects
Lucknow, Uttar Pradesh
Approved
10th Nov 2020
Completed
30th Sept 2024
Registration No.
UPRERAPRJ717215
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ717215 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2020-11-10 |
| Completion Date | 2024-09-30 |
| Total Area (sqm) | 8501 |
| Project Cost (Lacs) | 2149 |
| Duration (Months) | 47 |
| Registration Fee | 48000 |
Promoter Details
| Promoter Name | M/s Shalimar KSMB Projects |
| Promoter ID | UPRERAPRM10366 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | MM Architecture |
| Contractor | SA Construction |
| Structural Engineer | C.S. Bhandari |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 2,3- Village Ghaila and No. 5- village Alinagar | 8501.36 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| EWS | GF | 1 BHK | 29 | 30.42 | 0 |
| EWS | 1 | 1 BHK | 29 | 30.42 | - |
| EWS | 2 | 1 BHK | 29 | 30.42 | - |
| EWS | 3 | 1 BHK | 29 | 30.42 | - |
| LIG | GF | 1 BHK | 29 | 35.49 | 0 |
| LIG | 1 | 1 BHK | 29 | 35.49 | - |
| LIG | 2 | 1 BHK | 29 | 35.49 | - |
| LIG | 3 | 1 BHK | 29 | 35.49 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is single plot rhombus shaped , having total 1 no. of entry gate and 1 no. of exit gate from the 12 m wide front road and 5m and 6m internal roads. Site is surrounded by other plot on south , west and east sides. |
| Boundary Wall | 3.0 -3.6 m high and 230 mm thick boundary wall designed. Brick Work of inches and RCC work in column and beam may be used as per design. MS Board entrance and exit gates are developed with boundary. |
| Road Work | Road with bituminous Cover/ High quality concrete pavers will be used as per design suggested by the Architect for internal road. |
| Footpaths | All internal roads will have narrow footpath cement stone pavers or equivalent finishes. |
| Water Supply Including Drinking Water Facilities | Ground Water will be used. End user will use their individual RO System as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity. |
| Sewer System | Centralized sewerage system shall be provided. All sewerage water shall be go to the STP for treatment. After treatment water shall be recycle and it will used in gardening , vehicle washing , overflow from the STP shall be connected with the Municipal sewerage system. |
| Drain | Storm water system shall be provided. Storm water from the roads and other landscape area shall be connect to the storm water drain channel and go to the Rain water harvesting pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| Parks | There is one park area provided beside the plot. |
| Tree Planting | Tree plantation shall be as per applicable norms to maintain greenary and natural view. |
| Design For Electric Supply Including Street Lighting | We have designed the system as per Local electricity board and consider centralized Transformer, HT Panel, LT Panel, Feeder Pillar and back up common service like External lighting , STP, Pump room , etc. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Centralized sewerage system shall be provided. All sewerage water shall be go to the STP for treatment after tretament , water shall be recycle and it will use in gardening and vehicle washing, overflowform the STP shall be connect with the Municipal sewerage system. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | A well designed rain water harvesting system shall be provided for the solid waste management. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. |
| Fire Protection And Fire Safety System | All fire safety norms shall be complied. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage, Storm water and water supply system shall be provided. We have proposed common pump room , Transfer pumps to fill the domestic tanks . Water for domestic use and flushing go down through gravity from tanks. All sewage shall be go to the STP for recycling the water. Storm water for roofs, roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting pit for recharge the Ground water and overflow shall be connect with Municipal drain. |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | Vivek Khand Gomti Nagar Lucknow |
| Branch Address | Vivek Khand Gomti Nagar Lucknow |
| Account Holder | Shalimar KSMB Projects |
| Account Number | 06871132000786 |
| IFSC Code | ORBC0100687 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





