Belvedere Suites (GH-12) Integrated Township
M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
Lucknow, Uttar Pradesh
Approved
1st Oct 2022
Pending
30th Sept 2026
Registration No.
UPRERAPRJ263280
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ263280 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2022-10-01 |
| Completion Date | 2026-09-30 |
| Total Area (sqm) | 6541 |
| Project Cost (Lacs) | 12286 |
| Duration (Months) | 48 |
| Registration Fee | 38000 |
Promoter Details
| Promoter Name | M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) |
| Promoter ID | UPRERAPRM10813 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Mr. Rudraksha Charan |
| Contractor | Rajesh Tiwari - Prabha Enterprises |
| Structural Engineer | Mr. Sanjeev Jain |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 91, 93, 321, 327, 322, 323 | 6541 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Tower A | GF | OTHER | 0 | 0 | 0 |
| Tower A | 1 | 4 BHK | 2 | 171.99 | - |
| Tower A | 1 | 4 BHK | 2 | 218.38 | - |
| Tower A | 2 | 4 BHK | 2 | 171.99 | - |
| Tower A | 2 | 4 BHK | 2 | 218.38 | - |
| Tower A | 3 | 4 BHK | 2 | 171.99 | - |
| Tower A | 3 | 4 BHK | 2 | 218.38 | - |
| Tower A | 4 | 4 BHK | 2 | 171.99 | - |
| Tower A | 4 | 4 BHK | 2 | 218.38 | - |
| Tower A | 5 | 4 BHK | 2 | 171.99 | - |
| Tower A | 5 | 4 BHK | 2 | 218.38 | - |
| Tower A | 6 | 4 BHK | 2 | 171.99 | - |
| Tower A | 6 | 4 BHK | 2 | 218.38 | - |
| Tower A | 7 | 4 BHK | 2 | 171.99 | - |
| Tower A | 7 | 4 BHK | 2 | 218.38 | - |
| Tower A | 8 | 4 BHK | 2 | 171.99 | - |
| Tower A | 8 | 4 BHK | 2 | 218.38 | - |
| Tower A | 9 | 4 BHK | 2 | 171.99 | - |
| Tower A | 9 | 4 BHK | 2 | 218.38 | - |
| Tower A | 10 | 4 BHK | 2 | 171.99 | - |
| Tower A | 10 | 4 BHK | 2 | 218.38 | - |
| Tower A | 11 | 4 BHK | 2 | 171.99 | - |
| Tower A | 11 | 4 BHK | 2 | 218.38 | - |
| Tower A | 12 | 4 BHK | 2 | 171.99 | - |
| Tower A | 12 | 4 BHK | 2 | 218.38 | - |
| Tower A | 13 | 4 BHK | 2 | 171.99 | - |
| Tower A | 13 | 4 BHK | 2 | 218.38 | - |
| Tower A | 14 | 4 BHK | 2 | 171.99 | - |
| Tower A | 14 | 4 BHK | 2 | 218.38 | - |
| Tower A | 15 | 4 BHK | 2 | 171.99 | - |
| Tower A | 15 | 4 BHK | 2 | 218.38 | - |
| Tower A | 16 | 4 BHK | 2 | 171.99 | - |
| Tower A | 16 | 4 BHK | 2 | 218.38 | - |
| Tower A | 17 | 4 BHK | 2 | 171.99 | - |
| Tower A | 17 | 4 BHK | 2 | 218.38 | - |
| Tower A | 18 | 4 BHK | 2 | 171.99 | - |
| Tower A | 18 | 4 BHK | 2 | 218.38 | - |
| Tower A | 19 | 4 BHK | 2 | 171.99 | - |
| Tower A | 19 | 4 BHK | 2 | 218.38 | - |
| Tower A | 20 | 4 BHK | 2 | 171.99 | - |
| Tower A | 20 | 4 BHK | 2 | 218.38 | - |
| Tower A | 21 | 4 BHK | 2 | 171.99 | - |
| Tower A | 21 | 4 BHK | 2 | 218.38 | - |
| Tower A | 22 | OTHER | 0 | 0 | - |
| Tower A | 23 | OTHER | 1 | 165.11 | - |
| Tower A | 23 | OTHER | 1 | 165.11 | - |
| Tower A | 24 | OTHER | 0 | 146 | - |
| Tower A | 24 | OTHER | 0 | 146 | - |
| Tower A | 25 | OTHER | 1 | 165.11 | - |
| Tower A | 25 | OTHER | 1 | 165.11 | - |
| Tower A | 26 | OTHER | 0 | 146 | - |
| Tower A | 26 | OTHER | 0 | 146 | - |
| Tower A | 27 | OTHER | 1 | 165.11 | - |
| Tower A | 27 | OTHER | 1 | 165.11 | - |
| Tower A | 28 | OTHER | 0 | 146 | - |
| Tower A | 28 | OTHER | 0 | 146 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per approved sanction plan.This is single plot traingle shaped , having total 1 no. of entry gate and 1no. of exit gate from the 45 mtr wide front road and 30 mtr internal road. Site is surronded by 45 mtr road and 30 mtr road from North and West respectively and a green plot from East side. |
| Boundary Wall | 1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary. |
| Road Work | Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road. |
| Footpaths | All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes as per landscape design. |
| Water Supply Including Drinking Water Facilities | All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water. |
| Sewer System | Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system. |
| Drain | Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line. |
| Parks | There is a significant green area beside building including green parks, play areas for childrens and different recretional activities. |
| Tree Planting | The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view. |
| Design For Electric Supply Including Street Lighting | We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc. |
| Community Buildings | Fully centralised AC Club House/community center is proposed, swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises of mini-theatre,spa with steam and sauna ,swimming pools with changing rooms,yoga/medidation room, multipurpose hall ,Gymanasium,squash court,indoor playing areas etc. |
| Treatment and Disposal System of Sewage and Sullage water | Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system. |
| Solid Waste Management And Disposal System | Project shall have waste segregation area and OWC for treatment of organic waste.The solid waste shall be encouraged for segregation with in all apartments. the dustbins shall be provided for segregated waste in the common areas. from where the bio waste shall be converted to manure through owc within the campus and other waste shall be handed over to the government vendors for further disposal. |
| Water Conservation System | A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy managemen. |
| Fire Protection And Fire Safety System | All Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,smoke detectors,FHC with pumps are provided as per norms. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | The Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,Dg power backup for essential common supply,lifts. |
| Emergency Evacuation Services | Fire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. Dedicated assembly areas are also defined in the campus.Adequate signage is also provided. |
| Other Miscellaneous Work | Not applicable |
Bank Details
| Bank Name | State Bank of India |
| Branch | Commercial Branch, Lucknow |
| Branch Address | 6A, Way Road, Gokhle Marg, Lucknow |
| Account Holder | ANS DPL COLLECTION A/C BELVEDERE SUITES GH-12 |
| Account Number | 42036164749 |
| IFSC Code | SBIN0004166 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





