Central Park 2
M I Builders Private Limited
Lucknow, Uttar Pradesh
Approved
1st Mar 2021
Completed
1st Feb 2025
Registration No.
UPRERAPRJ936227
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ936227 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2021-03-01 |
| Completion Date | 2025-02-01 |
| Total Area (sqm) | 6691 |
| Project Cost (Lacs) | 5400 |
| Duration (Months) | 48 |
| Registration Fee | 38500 |
Promoter Details
| Promoter Name | M I Builders Private Limited |
| Promoter ID | UPRERAPRM7636 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | Nida Qadir |
| Contractor | MIB Infraengineering Pvt. Ltd |
| Structural Engineer | Hemant Kumar |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 791, 792 kha, 783, 784 | 6161.710 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Central Park 2 | BSMNT | OTHER | 0 | 0 | - |
| Central Park 2 | GF | OTHER | 0 | 0 | 0 |
| Central Park 2 | 1 | 3 BHK | 6 | 122.64 | - |
| Central Park 2 | 2 | 3 BHK | 6 | 122.64 | - |
| Central Park 2 | 3 | 3 BHK | 6 | 122.64 | - |
| Central Park 2 | 4 | 3 BHK | 6 | 122.64 | - |
| Central Park 2 | 5 | 3 BHK | 6 | 122.64 | - |
| Central Park 2 | 1 | 3 BHK | 6 | 103.31 | - |
| Central Park 2 | 2 | 3 BHK | 6 | 103.31 | - |
| Central Park 2 | 3 | 3 BHK | 6 | 103.31 | - |
| Central Park 2 | 4 | 3 BHK | 6 | 103.31 | - |
| Central Park 2 | 5 | 3 BHK | 6 | 103.31 | - |
| Central Park 2 | 6 | 3 BHK | 6 | 111.80 | - |
| Central Park 2 | 7 | 3 BHK | 6 | 111.80 | - |
| Central Park 2 | 6 | 2 BHK | 6 | 94.02 | - |
| Central Park 2 | 7 | 2 BHK | 6 | 94.02 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot having one common gate for entry and exit from the main road and about 7 meter internal roads. Site surrounded by other open plot of land of others. |
| Boundary Wall | Construction of Boundary wall is under process as per drawings about 1.8 meter high and 230 mm thick with MS gate. |
| Road Work | Approximately 7.5 mtr wide RCC road will be constructed around the plot as per the approved map. |
| Footpaths | Approximately 1.5-2 meter footpath will be constructed around the plot. Cement Stone/Curve Stone or equivalent finish will be used for footpath all around the internal roads. |
| Water Supply Including Drinking Water Facilities | Water Supply will be provided by ground water source through pipeline and through overhead storage tanks on building terrace for distribution through gravity. |
| Sewer System | As per drawings, STP system will be maintained and sewerage disposal will be connected through municipal lines. |
| Drain | Storm water system will be provided from the roads and other landscape area shall be connect to the storm drain channel. Any overflow will be connected with municipal drain line. Drains will be constructed as per the drawings in and around the whole area. |
| Parks | N/A |
| Tree Planting | Plantation of trees will be done after completion of main building tower. Tree plantation will be done all around the footpath / surroundings as per the norms to maintain greenery and natural view. |
| Design For Electric Supply Including Street Lighting | Design for electricity supply as per the norms of local electricity board and consider centralized transformer, HT Panel, ET Panel, Feeder pillar etc. Supply of electricity will be provided as per drawings including Street Lights. |
| Community Buildings | Multipurpose Halls , Sports area, will be provided as per drawings. |
| Treatment and Disposal System of Sewage and Sullage water | Sewerge Disposal System will be done through the municipal line of sewer. |
| Solid Waste Management And Disposal System | Solid Waste Management and disposal will be provided through any registered agency |
| Water Conservation System | Water Conservation System will be done by Harvesting Pit System |
| Energy Management System Including Use of Renewable Energy | We will use energy saving LED lightning, Fittings in external area and solar system may be provided if required. Energy Management System will be done as per requirements. |
| Fire Protection And Fire Safety System | Fire stairs and other fire prevention system will be installed as per the terms of Government . Fire NOC attached |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage, storm water, water supply system and Green area will be developed as per the drawings. |
| Emergency Evacuation Services | Fire stairs and other fire safety services will be provided. |
| Other Miscellaneous Work | Other services like rain water system, green area, footpath, swimming pool etc. will be developed as per the drawings. |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | Mid Corporate |
| Branch Address | Mid Corporate Branch , 10 , Ashok Marg , Lucknow (UP) -226001 |
| Account Holder | M I BUILDERS PRIVATE LIMITED SYED MOHD QADIR ALI |
| Account Number | 7177002100001149 |
| IFSC Code | PUNB0717700 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate