Centre Point Complex

Skylandvision Infra Private Limited

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Jun 2022

Project completed

Completed

30th Dec 2024

Registration No.

UPRERAPRJ398937

Project Type

Commercial

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ398937
Project StatusCompleted
Project CategoryCommercial
DistrictLucknow
TalukaSarojini Nagar
Start Date2022-06-01
Completion Date2024-12-30
Total Area (sqm)1802
Project Cost (Lacs)500
Duration (Months)31
Registration Fee15800

Promoter Details

Promoter NameSkylandvision Infra Private Limited
Promoter IDUPRERAPRM177677
Mobile93********

Project Team

rolename
ArchitectRavi Kant Dubey
ContractorSkylandvision Infra Private Limited
Structural EngineerChaudhary Mohammed Nadeem

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGGCP-COM-M2-B1801.97

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Centre Point ComplexBSMNTSHOP5336-
Centre Point Complex1SHOP5478-
Centre Point Complex2SHOP6531-
Centre Point Complex3OTHER1775-
Centre Point ComplexBSMNT2OTHER0900-

Development Works

work_namedescription
Demarcation of PlotsDemarcation of plot GGCP-COM-M2-B-situated at EMAAR MGF integrated township already done before starting of project.
Boundary WallBoundry wall work already done. Northern wall is 48.55 mt, Eastern is 15.19 mt, Western is 21.90 mt and southern is 58.38 mt. Size of the wall is 5.6 ft (height) and width is 9 inch. Remaining work will be done before completion.
Road WorkSince the project is at the corner their is no need to develop road at site, however, wears n tears (if any) will be done after completion.
FootpathsProject is at T-End of the road i.e, at the corner. No specific footpath required to be done. Building foothpath will be done before completion..
Water Supply Including Drinking Water FacilitiesWater supply available from "Jal Kal" department and also we will install tank of 25K Gallon at the roof top as back-up.
Sewer SystemSewer system already available by Lucknow Muncipality Corporation - LMC.
DrainWater drain system will be developed as water supply and drain plan.
ParksSince it is single commercial building supposed to be developed their is no park development required.
Tree PlantingSince it is single commercial building supposed to be developed their is no specific "Tree Planting" required. We will work on tree planting near parking and indoors.
Design For Electric Supply Including Street LightingWe plan to have proper lightning inside building as per electrical plan. Also, we will arrange power back-up 24X7 as back-up. Additionally, we will work with relevant government departments to maintain existing street lights.
Community BuildingsProject is commercial in nature their is no requirement of community building.
Treatment and Disposal System of Sewage and Sullage waterWe plan to have robustic treatment and disposal system of sewage and sullage water as per plan.
Solid Waste Management And Disposal SystemWe will develop solid waste management and disposal system as per attached plan.
Water Conservation SystemWe are working with our engineers and see how well we can conserve water.
Energy Management System Including Use of Renewable EnergyNo applicable.
Fire Protection And Fire Safety SystemWe will install "Fire protection and fire safety system" as per standard norms by the fire department during the development of project.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSince our project is commercial in nature their is no need for amenities. We will keep all hygiene and human health safety protocols up and running. after completion.
Emergency Evacuation ServicesEmergency evacuation plan prepared and we will make sure that in case of emergencies fire alarm and clear staircase remain available. We will work with stakeholders on tenant training on evacuation.
Other Miscellaneous WorkWork-In-Process.

Bank Details

Bank NameJammu and Kashmir Bank
BranchAkbari Gate Crossing
Branch AddressAbdulaziz Road, Akbari Gate Crossing
Account HolderSkylandvision Collection Account for Centre Point Complex
Account Number0328010100002019
IFSC CodeJAKA0LUKNOW

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy