New Launch - India Real Estate Report 2026.

Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow

U.P. Awas Evam Vikas Parishad

Lucknow, Uttar Pradesh

RERA approved

Approved

16th Jan 2024

Completion pending

Pending

15th Sept 2028

Registration No.

UPRERAPRJ608263

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ608263
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2024-01-16
Completion Date2028-09-15
Total Area (sqm)36198
Project Cost (Lacs)17831
Duration (Months)56
Registration Fee186000

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile87********

Project Team

rolename
ArchitectMr. Vikas Kumar
ContractorCD Lko-Five UPAVP Lucknow
Structural EngineerUPAVP

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1232870
Khasra12331010
Khasra12341060
Khasra1235151800

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
B46GF2 BHK840.000
B4612 BHK840.00-
B4622 BHK840.00-
B4632 BHK840.00-
B48GF2 BHK840.000
B4812 BHK840.00-
B4822 BHK840.00-
B4832 BHK840.00-
B49GF2 BHK840.000
B4912 BHK840.00-
B4922 BHK840.00-
B4932 BHK840.00-
B50GF2 BHK840.000
B5012 BHK840.00-
B5022 BHK840.00-
B5032 BHK840.00-
B51GF2 BHK840.000
B5112 BHK840.00-
B5122 BHK840.00-
B5132 BHK840.00-
B52GF2 BHK840.000
B5212 BHK840.00-
B5222 BHK840.00-
B5232 BHK840.00-
B47GF2 BHK840.000
B4712 BHK840.00-
B4722 BHK840.00-
B4732 BHK840.00-
B53GF2 BHK840.000
B5312 BHK840.00-
B5322 BHK840.00-
B5332 BHK840.00-
B54GF2 BHK840.000
B5412 BHK840.00-
B5422 BHK840.00-
B5432 BHK840.00-
B55GF2 BHK840.000
B5512 BHK840.00-
B5522 BHK840.00-
B5532 BHK840.00-
B56GF2 BHK840.000
B5612 BHK840.00-
B5622 BHK840.00-
B5632 BHK840.00-
B57GF2 BHK840.000
B5712 BHK840.00-
B5722 BHK840.00-
B5732 BHK840.00-
B58GF2 BHK840.000
B5812 BHK840.00-
B5822 BHK840.00-
B5832 BHK840.00-
B59GF2 BHK840.000
B5912 BHK840.00-
B5922 BHK840.00-
B5932 BHK840.00-
B60GF2 BHK840.000
B6012 BHK840.00-
B6022 BHK840.00-
B6032 BHK840.00-
B61GF2 BHK840.000
B6112 BHK840.00-
B6122 BHK840.00-
B6132 BHK840.00-
B62GF2 BHK840.000
B6212 BHK840.00-
B6222 BHK840.00-
B6232 BHK840.00-
B63GF2 BHK840.000
B6312 BHK840.00-
B6322 BHK840.00-
B6332 BHK840.00-

Development Works

work_namedescription
Demarcation of PlotsDone
Boundary WallN/A
Road WorkBituminous type Road of 6m, 7.5m and 12m wide will be provided. As per design.
FootpathsN/A
Water Supply Including Drinking Water Facilitieswater supply will be provided by different type and dia of pipes as per design in which PVC pipe of 200mm, 150mm, 125mm, 100mm dia and 300mm dia pipe of ductile Iron (DI) will be provided. The source of water is OHT that is already present in Sec-13, Vrindavan Yojna Lucknow
Sewer SystemFor seweage system, NP3 type RCC pipe of 250mm, 300mm 450mm dia will be provided as per desing. Treatment of sewage will be done in STP of 37.50MLD capacity that is already present in Sector-10B, Vrindavan Yojna Lucknow and effluent generated from STP after treatment will be finally disposed into Gomti River.
DrainU-type drain (CK, C1, C2) in which flat brick work with struct pointing and for bidding PCC of design thickness will be provided as per design.
ParksThere is porvision of park as per approved layout. The park will be provided with approved designed boundary in which tree/plant shall be planted.
Tree PlantingDiffrent type of plant will be planted at proper spacing in proposed area of construction of LIG houses after construction of road /Building.
Design For Electric Supply Including Street LightingElectricity supply will be provided from transformers installed by UPPCL that is already present in Sector-13, Vrindavan yojna Lucknow. RCC pole will be used for connecting electric supply wire from transformer to LIG houses. For the purpose of street lighting appropriate electric bulbs will be installed on RCC poles at proper spacing.
Community Buildingsit is proposed in sector-13 and is also built in other sectors of Vrindavan Yojna Lucknow
Treatment and Disposal System of Sewage and Sullage waterTreatment of sewage and sullage water will be done by STP (capacity 37.50MLD) and technology based on Sequence batch reactor (SBR) that is already present in Sector-10B Vrindavan Yojna Lucknow. Final effluent from STP after treatment will be disposed into gomti river.
Solid Waste Management And Disposal SystemNagar Nigam/Parishad dumper/vehicles will collect the solid waste and transport to the disposal centre for further process.
Water Conservation SystemN/A
Energy Management System Including Use of Renewable EnergyN/A
Fire Protection And Fire Safety SystemN/A
Social Infrastructure And Other Public Amenities Including Public Health ServicesProvision for nursing home/ helth center has been consedered out as per Building bye-laws issued by Govt.
Emergency Evacuation ServicesN/A
Other Miscellaneous WorkN/A

Bank Details

Bank NameICICI BANK
BranchVibhuti Khand, Gomti Nagar Lucknow
Branch AddressRegional Office, Lucknow TC-13, Vibhuti Khand Gomti Nagar -226010
Account HolderUpavp Vrindavan yojna No-04 LKO Sector-13, 576 LIG houses G+3 Collection A/C
Account Number469801000039
IFSC CodeICIC00004698

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy