Coronation Amy Villa

CORONATION HOUSING AND DILIGENCE

Lucknow, Uttar Pradesh

RERA approved

Approved

15th Feb 2022

Project completed

Completed

12th Feb 2026

Registration No.

UPRERAPRJ730714

Project Type

Mixed

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ730714
Project StatusCompleted
Project CategoryMixed
DistrictLucknow
TalukaLucknow
Start Date2022-02-15
Completion Date2026-02-12
Total Area (sqm)3666
Project Cost (Lacs)2208
Duration (Months)48
Registration Fee35250

Promoter Details

Promoter NameCORONATION HOUSING AND DILIGENCE
Promoter IDUPRERAPRM168004
Mobile81********

Project Team

rolename
ArchitectPoint Architects Pvt Ltd
Contractorself
Structural EngineerRahul Tripathi

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra183666

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
1GFSHOP1888.700
11SHOP1961.58-
123 BHK1619.46-
133 BHK1619.46-
143 BHK1619.46-
153 BHK1619.46-

Development Works

work_namedescription
Demarcation of PlotsN/A
Boundary WallBoundary Wall shall be constructed on all the three sides in first class brick work with 1;6 cement sand mortar proportion. 230 mm x 230 mm R.C.C. Column shall be provided at regular intervals with expansion joints where required. On road side M.S. Railing shall be provided up to the height of 2.1 meters with 6 meter wide gate as per site plan
Road Work80mm Paver stones over 100mm PCC over 50mm Sand bed
FootpathsN/A
Water Supply Including Drinking Water FacilitiesTerrace Tank of 25000 litres capacity shall be provided for water supply. All the toilets and kitchens will be connected from terrace tank through different sizes of PVC pipes. Water shall be available round the clock in the building.
Sewer SystemWaste water of the building shall be discharged through pvc pipe of 150 mm diameter laid in trenches of 230mm wide covered with course aggregate. The trenches shall be excavated to a slight gradient (1 in 300 or so). Inspection chamber shall be provided at regular interval
DrainThe rainwater from roof top shall be routed through down pipes passing through each floor shaft till ground floor then finally converging to under ground external RWH pipelines. These underground RWH pipelines shall finally transfer rain water harvesting pits (1 Nos.) provided at site. The surface rain water shall be collected through drain from roads and all other surfaces in open/under ground trenches. The trenches shall be covered with MS gratings through out on top of open trenches. PVC pipe of 150mm diameter shall be laid in trenches of 230mm wide covered with course aggregate.
Parks535.64 sq mtr area has been proposed
Tree Planting19 no of Trees are proposed to be planted
Design For Electric Supply Including Street LightingThe electrical supply shall be drawn from MVVNL electrical infrastructure of high voltage line. This high voltage supply shall be tapped from MVVNL source to our high voltage controlling unit consisting of VCB, step down transformer, LT power control systems and LT power shall be then distributed through power cables to energy supply meters of Individual consumers and shall be individually billed for recording power consumptions by MVVNL. The necessary features shall be like earthing and other protection shall follow as per standard applicable norms The street light designing shall be separately done as per land scaping and road design plans. All lighting system electricity supply shall be compatible with necessary earthing as per Bureau of Indian Standards, MVVNL Rules and regulations
Community BuildingsN/A
Treatment and Disposal System of Sewage and Sullage waterA septic tank of 20000 liters capacity shall be provided
Solid Waste Management And Disposal SystemDifferent types of bins shall be kept in the building to collect waste of the building and disposed by the municipality vans of Lucknow Municipal Corporation
Water Conservation SystemWater Conservation System shall consist of RWH (Rain Water Harvesting) pits and associated under ground tank of adequate capacity
Energy Management System Including Use of Renewable EnergySolar Energy shall be tapped from terrace floor with required capacity. The total energy produced throughout the day time from solar panels will be directed to online grid systems of MVVNL for maximum benefit
Fire Protection And Fire Safety SystemAll rules and regulations of NBC shall be followed The system will consist of fire fighting equipment, firehose reels, extinguishers, underground water tank, Terrace and Jockey pumps etc. Necessary fire water tank on terrace shall be provided, fire sprinklers as required on both commercial floors as per NBC guidelines. Basement shall be provided with sprinklers and fire fighting systems as per NBC guidelines
Social Infrastructure And Other Public Amenities Including Public Health ServicesN/A
Emergency Evacuation ServicesFire Escape
Other Miscellaneous WorkN/A

Bank Details

Bank NameFederal Bank
BranchMain Branch
Branch Address37-A, Cantonment Road, Burlington Crossing, Lucknow
Account HolderCoronation Housing Diligence Account - Collection Account for Coronation Amy Villa
Account Number11490200021681
IFSC CodeFDRL0001149

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy