CRYSTAL MAYBERRY
OPPORTUNE ASSOCIATES PRIVATE LIMITED
Lucknow, Uttar Pradesh
Approved
1st Jan 2024
Completed
31st Dec 2025
Registration No.
UPRERAPRJ137589/05/2024
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ137589/05/2024 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2024-01-01 |
| Completion Date | 2025-12-31 |
| Total Area (sqm) | 2905 |
| Project Cost (Lacs) | 1777 |
| Duration (Months) | 24 |
| Registration Fee | 20000 |
Promoter Details
| Promoter Name | OPPORTUNE ASSOCIATES PRIVATE LIMITED |
| Promoter ID | UPRERAPRM274945 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | Ar. Sanjeev Kumar Sanghal |
| Contractor | Zaheer |
| Structural Engineer | Er. Ch. Mohd. Nadeem |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 404 and 406 | 2516 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| CRYSTAL MAYBERRY | BSMNT | OTHER | 1 | 120.36 | - |
| CRYSTAL MAYBERRY | 1 | 3 BHK | 1 | 126.44 | - |
| CRYSTAL MAYBERRY | 1 | 3 BHK | 1 | 118.58 | - |
| CRYSTAL MAYBERRY | 1 | 3 BHK | 1 | 108.80 | - |
| CRYSTAL MAYBERRY | 1 | 3 BHK | 1 | 110.94 | - |
| CRYSTAL MAYBERRY | 1 | 3 BHK | 1 | 111.73 | - |
| CRYSTAL MAYBERRY | 1 | 4 BHK | 1 | 175.54 | - |
| CRYSTAL MAYBERRY | 2 | 3 BHK | 1 | 126.44 | - |
| CRYSTAL MAYBERRY | 2 | 3 BHK | 1 | 118.58 | - |
| CRYSTAL MAYBERRY | 2 | 3 BHK | 1 | 108.80 | - |
| CRYSTAL MAYBERRY | 2 | 3 BHK | 1 | 110.94 | - |
| CRYSTAL MAYBERRY | 2 | 3 BHK | 1 | 111.73 | - |
| CRYSTAL MAYBERRY | 2 | 4 BHK | 1 | 175.54 | - |
| CRYSTAL MAYBERRY | 3 | 3 BHK | 1 | 126.44 | - |
| CRYSTAL MAYBERRY | 3 | 3 BHK | 1 | 118.58 | - |
| CRYSTAL MAYBERRY | 3 | 3 BHK | 1 | 108.80 | - |
| CRYSTAL MAYBERRY | 3 | 3 BHK | 1 | 110.94 | - |
| CRYSTAL MAYBERRY | 3 | 3 BHK | 1 | 111.73 | - |
| CRYSTAL MAYBERRY | 3 | 4 BHK | 1 | 175.54 | - |
| CRYSTAL MAYBERRY | 4 | 3 BHK | 1 | 126.44 | - |
| CRYSTAL MAYBERRY | 4 | 3 BHK | 1 | 118.58 | - |
| CRYSTAL MAYBERRY | 4 | 3 BHK | 1 | 108.80 | - |
| CRYSTAL MAYBERRY | 4 | 3 BHK | 1 | 110.94 | - |
| CRYSTAL MAYBERRY | 4 | 3 BHK | 1 | 111.73 | - |
| CRYSTAL MAYBERRY | 4 | 4 BHK | 1 | 175.54 | - |
| CRYSTAL MAYBERRY | 5 | 3 BHK | 1 | 126.44 | - |
| CRYSTAL MAYBERRY | 5 | 3 BHK | 1 | 118.58 | - |
| CRYSTAL MAYBERRY | 5 | 3 BHK | 1 | 108.80 | - |
| CRYSTAL MAYBERRY | 5 | 3 BHK | 1 | 110.94 | - |
| CRYSTAL MAYBERRY | 5 | 3 BHK | 1 | 111.73 | - |
| CRYSTAL MAYBERRY | 5 | 4 BHK | 1 | 175.54 | - |
| CRYSTAL MAYBERRY | 6 | 3 BHK | 1 | 126.44 | - |
| CRYSTAL MAYBERRY | 6 | 3 BHK | 1 | 118.58 | - |
| CRYSTAL MAYBERRY | 6 | 3 BHK | 1 | 108.80 | - |
| CRYSTAL MAYBERRY | 6 | 3 BHK | 1 | 110.94 | - |
| CRYSTAL MAYBERRY | 6 | 3 BHK | 1 | 111.73 | - |
| CRYSTAL MAYBERRY | 6 | 4 BHK | 1 | 175.54 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is a single plot rectangular shaped plots spanning in an area of 2905 sq. mtr. Surrounded by strong boundary wall and there is a single entry gate and single exit gate on 12 mtr. wide road from North, 12 mtr. wide road from south. |
| Boundary Wall | 1.6m -2.1m high and 230 mm thick boundary wall with MS railing designed with 9 inches brick work and RCC column and beam. |
| Road Work | A 6.0 mtr wide RCC Road installed with road reflector inside the campus for clear visibility of road. |
| Footpaths | Footpaths will be developed using highest grade of casting to make it uniform and longlasting. Campus is surrounded by Lavish and meticulously green landscape making it healthier for the residents residing in it. |
| Water Supply Including Drinking Water Facilities | Adequate water supply connection from the bore well routed through domestic water tank to the water supply connections to the building. |
| Sewer System | Adequate sewer system will be provided to mange, operate and maintain all parts of the sanitary sewer system connected to drainage line of development authority/ municipal authority. |
| Drain | A Storm water system is implemented to manage storm water from road, rooftop storm water will be channeled to a rain water pipelines and slopes are provided wherever required. |
| Parks | There is approximately 600 sq.ft. of green spaces crafted around 7 mtr. inside campus road to delight and inspire our residents. |
| Tree Planting | The total no. of 40 or more seasonal trees will be planted to maintain greenery and natural view. |
| Design For Electric Supply Including Street Lighting | All internal wiring will be in copper conductors using concealed PVC conduits. As per electrical layout map continuous Generator back up. Adequate lighting for the whole building premises with 1 set of Generator back up. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Internal sewer line shall be connected to the sewage and drainage line of development authority/ municipal authority. |
| Solid Waste Management And Disposal System | The location for solid waste/ garbage disposal is adjacent to Gate No.2 and all the waste/ garbage shall be collected by Municipal authority. |
| Water Conservation System | A well designed rain water harvesting system as per green building codes shall be provided for the whole building complex to conserve water. |
| Energy Management System Including Use of Renewable Energy | The proposed project practices to promote a positive impact on the environment and long term operational efficiency. Total 22 no. of solar LED street light will be installed to save energy during night. Ample natural light to all the flats during day time to save energy during day. |
| Fire Protection And Fire Safety System | All the fire safety norms shall be provided as per applicable norms. NOC and Plan is uploaded. 5 nos. of Signage board will be also installed. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Toilets shall be provided. It shall be with First class ceramic tiles flooring upto Dado level on floor. |
| Emergency Evacuation Services | Fire Escape Staircase is already provided in the building to exit in case of emergency and 5 nos. of signage board is also provided. |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | Kotak Mahindra Bank |
| Branch | Kotak Mahindra Bank, Naka Hindola Lucknow |
| Branch Address | Shop No.A-3 & A-4, Gurudwara Road, Lucknow-226004 |
| Account Holder | Opportune Associates Private Limited-Collection Account for Crystal Mayberry |
| Account Number | 5549755336 |
| IFSC Code | KKBK0000678 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in