New Launch - India Real Estate Report 2026.

Dynasty By ORO

ORO REAL INFRA LLP

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Apr 2025

Completion pending

Pending

14th Jun 2031

Registration No.

UPRERAPRJ469558/12/2024

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ469558/12/2024
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2025-04-01
Completion Date2031-06-14
Total Area (sqm)4578
Project Cost (Lacs)13923
Duration (Months)75
Registration Fee28000

Promoter Details

Promoter NameORO REAL INFRA LLP
Promoter IDUPRERAPRM152277
Mobile94********

Project Team

rolename
ArchitectK-Design Rakesh Sharma
ContractorORO Real Infra LLP
Structural EngineerAKB Consultants

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra784P822
Khasra790P336.50
Khasra791P3318
Khasra792 KHA P101.50

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
CROWN (Tower B)13 BHK491.89-
CROWN (Tower B)12 BHK171.00-
CROWN (Tower B)12 BHK175.45-
CROWN (Tower B)23 BHK491.89-
CROWN (Tower B)22 BHK171.00-
CROWN (Tower B)22 BHK175.45-
CROWN (Tower B)33 BHK491.89-
CROWN (Tower B)32 BHK171.00-
CROWN (Tower B)32 BHK175.45-
CROWN (Tower B)43 BHK491.89-
CROWN (Tower B)42 BHK171.00-
CROWN (Tower B)42 BHK175.45-
CROWN (Tower B)53 BHK491.89-
CROWN (Tower B)52 BHK171.00-
CROWN (Tower B)52 BHK175.45-
CROWN (Tower B)63 BHK491.89-
CROWN (Tower B)62 BHK171.00-
CROWN (Tower B)73 BHK491.89-
CROWN (Tower B)72 BHK171.00-
CROWN (Tower B)72 BHK175.45-
CROWN (Tower B)83 BHK491.89-
CROWN (Tower B)82 BHK171.00-
CROWN (Tower B)82 BHK175.45-
CROWN (Tower B)93 BHK491.89-
CROWN (Tower B)92 BHK171.00-
CROWN (Tower B)92 BHK175.45-
CROWN (Tower B)103 BHK491.89-
CROWN (Tower B)102 BHK171.00-
CROWN (Tower B)102 BHK175.45-
CROWN (Tower B)113 BHK491.89-
CROWN (Tower B)112 BHK171.00-
CROWN (Tower B)112 BHK175.45-
CROWN (Tower B)123 BHK491.89-
CROWN (Tower B)122 BHK171.00-
CROWN (Tower B)122 BHK175.45-
CROWN (Tower B)133 BHK491.89-
CROWN (Tower B)132 BHK171.00-
CROWN (Tower B)132 BHK175.45-
CROWN (Tower B)143 BHK491.89-
CROWN (Tower B)142 BHK171.00-
CROWN (Tower B)142 BHK175.45-
CROWN (Tower B)153 BHK491.89-
CROWN (Tower B)152 BHK171.00-
CROWN (Tower B)152 BHK175.45-
CROWN (Tower B)163 BHK491.89-
CROWN (Tower B)162 BHK171.00-
CROWN (Tower B)162 BHK175.45-
CROWN (Tower B)173 BHK491.89-
CROWN (Tower B)172 BHK171.00-
CROWN (Tower B)172 BHK175.45-
CROWN (Tower B)193 BHK491.89-
CROWN (Tower B)192 BHK171.00-
CROWN (Tower B)192 BHK175.45-
CROWN (Tower B)203 BHK491.89-
CROWN (Tower B)202 BHK171.00-
CROWN (Tower B)202 BHK175.45-
CROWN (Tower B)213 BHK491.89-
CROWN (Tower B)212 BHK171.00-
CROWN (Tower B)212 BHK175.45-
CROWN (Tower B)223 BHK491.89-
CROWN (Tower B)222 BHK171.00-
CROWN (Tower B)222 BHK175.45-
CROWN (Tower B)233 BHK491.89-
CROWN (Tower B)232 BHK171.00-
CROWN (Tower B)232 BHK175.45-
CROWN (Tower B)243 BHK491.89-
CROWN (Tower B)242 BHK171.00-
CROWN (Tower B)242 BHK175.45-
CROWN (Tower B)253 BHK491.89-
CROWN (Tower B)252 BHK171.00-
CROWN (Tower B)252 BHK175.45-
CROWN (Tower B)263 BHK491.89-
CROWN (Tower B)262 BHK171.00-
CROWN (Tower B)262 BHK175.45-
CROWN (Tower B)183 BHK491.88-
CROWN (Tower B)182 BHK171.00-
CROWN (Tower B)182 BHK175.43-
CROWN (Tower B)62 BHK175.45-

Development Works

work_namedescription
Demarcation of PlotsThe total approved area is of size 9156 aq. mtr. (after deduction of road widening) exist at Lucknow Sultanpur highway , having 1 main entrance gate from the 76m wide front road(Extension of the project will be planned in due course)
Boundary Wall2m high and230mm thick brick work and RCC work in column and beam. At the centre face of boundary wall there would be a Logo of the project which will give a beautiful iconic design to the boundary wall.
Road WorkFrom the main entrance gate we will provide 125 mm thick interlocking brick/RCC road throughout the project. The widess starts from 6 Mtr and goes uptp 7.5Mtr..
FootpathsWe shall provide footpath of 60/80 mm thick interlocking paver.
Water Supply Including Drinking Water FacilitiesWe will provide pumps for the requirement of blocks through underground pipelines of diameter 110 mm
Sewer SystemModular sewerage system shall be provided of capacity 135KLD as per approved MBBR technology. All sewerage water shall go to the STP through DWC/RCC hume pipes and overflow from the STP shall be connected with the Municipal Sewerage System.
DrainStorm water shall be connected to the Storm water drain, through DWC/RCC hume pipes (Dia 150mm above) and go to the rain water harvesting pit for recharge of ground water and overflow shall be connected with Municipal drain Line.
ParksWe will provide 1378.16 Sq. Mt. Green Area with different activities and kids play area
Tree PlantingWe will provide 83 Nos of Trees in green area along with boundary wall
Design For Electric Supply Including Street LightingElectrical infrastructure will be developed as per approved electrical drawings
Community BuildingsClub community centre with good amenities. It will be run and maintained by RWA. Same club will also be used by the residents of future extension.
Treatment and Disposal System of Sewage and Sullage waterTreatment and disposal of sewage and sludge water will be done through vendor of municipal body
Solid Waste Management And Disposal SystemThere will be a proper Garbage collection area for the solid waste management.
Water Conservation SystemRain water Harvesting System for recharging of water and improve the ground water level
Energy Management System Including Use of Renewable EnergyWe will use LED lights and Solar water heating system as per approved drawing. In pump room also all the equipments shall have energy efficient motor.
Fire Protection And Fire Safety SystemWe will provide Fire fighting facility as per approved drawing in common areas.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesWe will have staircases and Refuge area and evacuation services as per approved drawings.
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameState Bank of India
BranchCommercial Branch
Branch Address6A, Way Road, Gokhale Marg
Account HolderORI Collection A/C for Dynasty By ORO
Account Number43378037770
IFSC CodeSBIN0004166

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy