Eiffel Vivassa Estate Phase 2
EIFFEL INFRADEVELOPERS PRIVATE LIMITED
Lucknow, Uttar Pradesh
Approved
1st Jul 2019
Completed
24th Jun 2026
Registration No.
UPRERAPRJ929171
Project Type
Residential
District
Lucknow
Taluka
Mohanlalganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ929171 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Mohanlalganj |
| Start Date | 2019-07-01 |
| Completion Date | 2026-06-24 |
| Total Area (sqm) | 9624 |
| Project Cost (Lacs) | 7072 |
| Duration (Months) | 84 |
| Registration Fee | 53500 |
Promoter Details
| Promoter Name | EIFFEL INFRADEVELOPERS PRIVATE LIMITED |
| Promoter ID | UPRERAPRM84896 |
| Mobile | 73******** |
Project Team
| role | name |
|---|---|
| Architect | Sanjay Kumar Gupta |
| Contractor | SN Tiwari |
| Structural Engineer | Akhilesh Kr. Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 481, 480KA, 479KA, 477, 615, 614(part) 616(part), 617(part) | 9813.54 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| REGAL-1 | GF | 4 BHK | 4 | 181.95 | 0 |
| REGAL-1 | 1 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 2 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 3 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 4 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 5 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 6 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 7 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 8 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 9 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 10 | 4 BHK | 4 | 181.95 | - |
| REGAL-1 | 11 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 1 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 2 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 3 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 4 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 5 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 6 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 7 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 8 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 9 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 10 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | 11 | 4 BHK | 4 | 181.95 | - |
| REGAL-2 | GF | 4 BHK | 4 | 181.95 | 0 |
| Cosmic | GF | SHOP | 6 | 18.37 | 0 |
| Cosmic | 1 | SHOP | 6 | 18.37 | - |
Development Works
| work_name | description |
|---|---|
| Boundary Wall | 2.5 mt. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex. |
| Road Work | Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points. |
| Footpaths | All internal roads to have 0.75m wide footpath in 40- 60 mm thick concrete/granite pavers or equivalent finishes. |
| Water Supply Including Drinking Water Facilities | underground water to be supplied through terrace tank. |
| Sewer System | Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and complex washing. overflow from the STP shall be connected to the Municipal sewerage system. |
| Drain | Storm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main 45 mt. road. |
| Parks | Highly enriched green parks with grass cover and plantation/shrubs have been proposed on approved location. Facilities like open Gym and children play equipments to be part of green areas. |
| Tree Planting | "There are 5 type of trees proposed at site: which are kachnar, gulmauhar, amaltas, kusum and neem." |
| Design For Electric Supply Including Street Lighting | A well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel. |
| Community Buildings | Club Building With Basic Recreational Facilities Like Gym, Library And Common Room And Pool Facility. The Said Facility Will Be Shared By The Allottees Of Phase 2 Also. |
| Treatment and Disposal System of Sewage and Sullage water | Centralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, washing and flushing system . Overflow from the STP shall be connected with the Municipal sewerage system. |
| Solid Waste Management And Disposal System | "Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point for the solid waste management." |
| Water Conservation System | A well designed rain water harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes. |
| Energy Management System Including Use of Renewable Energy | We will use LED light fittings in external and common areas as well as 20% solar street lights. In STP and Pump room all the equipment shall have energy efficient motors/pumps. |
| Fire Protection And Fire Safety System | Since the building is less than 45m in height all the fire norms shall be followed as NBC with the approval of fire department. A dedicated pipe line along with hydrants will be connected to wet risers. Terrace tanks shall have separate storage facility to store water for fire fighting. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | A creche for the children of labors during construction period with play and study facility. Temporary toilets for workers during construction period and emergency medical kit. |
| Emergency Evacuation Services | Exits from each and every point has been planned and proposed as per norms in case of emergency. |
| Other Miscellaneous Work | N.A. |
Bank Details
| Bank Name | ICICI Bank |
| Branch | Indranagar, Lucknow |
| Branch Address | Indranagar, Lucknow |
| Account Holder | EIFFEL INFRADEVELOPERS PRIVATE LIMITED PHASE-2 RERA RETENTION ACCOUNT |
| Account Number | 059105002847 |
| IFSC Code | ICIC0000591 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





