New Launch - India Real Estate Report 2026.

Eldeco East End at Shaurya

ELDECO Housing and Industries Ltd.

Lucknow, Uttar Pradesh

RERA approved

Approved

15th Jun 2021

Project completed

Completed

15th Mar 2026

Registration No.

UPRERAPRJ513776

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ513776
Project StatusCompleted
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2021-06-15
Completion Date2026-03-15
Total Area (sqm)12180
Project Cost (Lacs)505
Duration (Months)58
Registration Fee66000

Promoter Details

Promoter NameELDECO Housing and Industries Ltd.
Promoter IDUPRERAPRM21
Mobile96********

Project Team

rolename
ArchitectSanjay Kumar Gupta-
ContractorM-S J K Sahani Construction -Mr.J.K Sahani
Structural EngineerMr.Akhilesh Kumar Singh-ATS Structural Consultants

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra411550
Khasra421620
Khasra512970
Khasra522420
Khasra433620

Development Works

work_namedescription
Demarcation of PlotsTotal site is very well demarcated and most of the site boundary is constructed.
Boundary Wall2.7 mt. high boundary wall is planned for this mini Township.
Road Work9.00 mt Black top roads are planned as per the approved layout.
Footpaths0.9 mt to 12 mt. wide pathways along roads .To be constructed with C.C/paver blocks.
Water Supply Including Drinking Water FacilitiesTotal township to have a separate OHT/UGT with boring to extract under ground water. Supply to the township shall be through supply lines as per design.
Sewer SystemA well designed sewer system has been planned with provision of STP.
DrainTotal under ground drainage system has been planned along the roads with adequate no. of Rain water harvesting points.
Parks15 percentage of the total land area has been planned as parks .Kids play facilities and walking/ jogging facilities shall be part of these parks.
Tree Planting3.5 to 4.5 mt high plantation along the road has been planned.
Design For Electric Supply Including Street LightingAdequate no. of street lighting poles are planned as per norms.Under ground cable system has been designed.
Community BuildingsClub in township( Eldeco Shaurya) already developed.
Treatment and Disposal System of Sewage and Sullage waterSeparate STP to be provided.
Solid Waste Management And Disposal SystemShall be lined up with Lucknow Nagar Nigam for door to door collection.
Water Conservation SystemAdequate no. of recharge pits as per drawings .Endeavour is to recharge complete roof top storm water.
Energy Management System Including Use of Renewable EnergyRecycled water to be used for cisterns and irrigation.25 percentage of the street lights shall have solar back up.
Fire Protection And Fire Safety SystemN.A
Social Infrastructure And Other Public Amenities Including Public Health ServicesN.A
Emergency Evacuation Services9.00 mt. roads to facilitate easy exit.
Other Miscellaneous WorkN.A

Bank Details

Bank NameICICI Bank
BranchIndra Nagar
Branch Address19/753,Ring Road Indira Nagar,Lucknow-226016
Account HolderEldeco Housing And Industries Limited Eldeco East End At Shaurya-Rera Collection Account
Account Number777705321888
IFSC CodeICIC0000591

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy