Eldeco Imperia Phase II
ELDECO Housing and Industries Ltd.
Lucknow, Uttar Pradesh
Approved
1st Oct 2023
Pending
5th Sept 2028
Registration No.
UPRERAPRJ396763
Project Type
Mixed
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ396763 |
| Project Status | New |
| Project Category | Mixed |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2023-10-01 |
| Completion Date | 2028-09-05 |
| Total Area (sqm) | 114892 |
| Project Cost (Lacs) | 11274 |
| Duration (Months) | 60 |
| Registration Fee | 869250 |
Promoter Details
| Promoter Name | ELDECO Housing and Industries Ltd. |
| Promoter ID | UPRERAPRM21 |
| Mobile | 96******** |
Project Team
| role | name |
|---|---|
| Architect | Sanjay Kumar Gupta |
| Contractor | Mr. J.K Sahani Proprietor J.K Construction and Mr. Rakesh Kumar Proprietor Mahalaxmi Construction Company |
| Structural Engineer | Er. Akhilesh Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 119 | 1260 |
| Khasra | 293sa | 573 |
| Khasra | 122 | 14590 |
| Khasra | 123 | 2790 |
| Khasra | 124 | 5010 |
| Khasra | 125 | 5440 |
| Khasra | 126 | 5080 |
| Khasra | 129 | 2530 |
| Khasra | 129 | 1550 |
| Khasra | 129 | 2045 |
| Khasra | 131 | 2360 |
| Khasra | 138 | 5250 |
| Khasra | 139 | 5840 |
| Khasra | 139 | 5840 |
| Khasra | 140 | 5010 |
| Khasra | 140 | 2530 |
| Khasra | 293sa | 310 |
| Khasra | 293sa | 5060 |
| Khasra | 293sa | 1686 |
| Khasra | 293sa | 1376 |
| Khasra | 293sa | 1686 |
| Khasra | 94 | 3790 |
| Khasra | 94 | 1110 |
| Khasra | 85 | 630 |
| Khasra | 75 | 250 |
| Khasra | 76 | 480 |
| Khasra | 89 | 310 |
| Khasra | 72 | 630 |
| Khasra | 73 | 1010 |
| Khasra | 84 | 630 |
| Khasra | 92 | 2580 |
| Khasra | 90 | 1390 |
| Khasra | 91 | 890 |
| Khasra | 86 | 340 |
| Khasra | 93 | 4160 |
| Khasra | 93 | 6320 |
| Khasra | 93 | 3790 |
| Khasra | 79 | 760 |
| Khasra | 82 | 426 |
| Khasra | 101 | 630 |
| Khasra | 102 | 1895 |
| Khasra | 78 | 510 |
| Khasra | 88 | 250 |
| Khasra | 69 | 1785 |
| Khasra | 67 | 930 |
| Khasra | 77 | 130 |
| Khasra | 106sa | 250 |
| Khasra | 107sa | 250 |
| Khasra | 86sa | 570 |
| Khasra | 80 | 380 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) |
|---|---|---|---|---|
| 0 | GF | OTHER | 0 | 0 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot is very well demarcated at the site and land is under possession. |
| Boundary Wall | 2.4 meter high wall along periphery is proposed to be constructed/is under construction |
| Road Work | 18 mtr/12 mtr/9 mtr roads with black top and adjoining paved areas for services are proposed to be constructed as per the approved layout. |
| Footpaths | 1.8 to 2.4 mtr wide paved areas to run along both side of the roads. This to be finished with grass pavers/ CC blocks and greenery. |
| Water Supply Including Drinking Water Facilities | Provision of UGT and OHT of desired capacity to be constructed on the approved location. Water supply to the township shall be through specified pipe dia. as per the design. |
| Sewer System | A well laid/designed sewerage system with RCC NP pipes connected to STP. |
| Drain | A well designed under ground drainage system connected to a specific number of Rain water harvesting systems have been proposed to get zero discharge. |
| Parks | Parks shall have a well laid grass with 2 to 3 percent paving, shrubs and 3.5 to 4.5 mtr high plants. |
| Tree Planting | 4,5 mtr to 6 mtr high plants/trees along all the roads of evergreen nature. |
| Design For Electric Supply Including Street Lighting | 6.0 mtr to 7.5 mtr high pole lights with single arm along 9 mtr road and 9 mtr high pole lights with double arms along 18 mtr roads are proposed. |
| Community Buildings | Club provided in Phase I of the project registered as Eldeco Imperia |
| Treatment and Disposal System of Sewage and Sullage water | STP at the approved location with latest technology to treat and create recycled water. |
| Solid Waste Management And Disposal System | 2 to 3 locations to be marked with coordination with the local municipal authority for disposal on everyday basis. |
| Water Conservation System | 8-10RWH points have been planned as per the drawing. |
| Energy Management System Including Use of Renewable Energy | 25 of the street lights shall be with solar backup. Use of LED lights to be fully implemented. |
| Fire Protection And Fire Safety System | all the proposed structures are of G+1 storeys abutting wide roads to get quick exit. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Available within 4-5 kms of the site. A few parks to be developed for social and recreational activities. |
| Emergency Evacuation Services | N.A |
| Other Miscellaneous Work | N.A |
Bank Details
| Bank Name | ICICI Bank Limited |
| Branch | Indira Nagar,Lucknow |
| Branch Address | 19/753,Sec-19,Indira Nagar,lucknow-226016 |
| Account Holder | Eldeco Housing and Industries Ltd-Coll A/c for Imperia Phase-2 |
| Account Number | 777705591201 |
| IFSC Code | ICIC0000591 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in