Experion Capital - Phase 2
Experion Developers Pvt. Ltd
Lucknow, Uttar Pradesh
Approved
1st May 2018
Completed
29th Oct 2023
Registration No.
UPRERAPRJ15884
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ15884 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2018-05-01 |
| Completion Date | 2023-10-29 |
| Total Area (sqm) | 2583 |
| Project Cost (Lacs) | 3600 |
| Duration (Months) | 66 |
| Registration Fee | 18000 |
Promoter Details
| Promoter Name | Experion Developers Pvt. Ltd |
| Promoter ID | UPRERAPRM3669 |
| Mobile | 95********/94********/85******** |
Project Team
| role | name |
|---|---|
| Architect | Vastulipi (Local Architect) & DSP Design Associates Pvt. Ltd. (Yatin Patel, Main Architect) |
| Contractor | Bucon Infratech Private Limited |
| Structural Engineer | M.N. Consultants Pvt. Ltd. |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | TCG 1-A/V6 | 9409.95 |
| Plot | TCG 1-A/V7 | 18164 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| T6 | GF | 1 BHK | 1 | 69.20 | 0 |
| T6 | GF | 4 BHK | 1 | 125.38 | 0 |
| T6 | GF | 4 BHK | 1 | 148.08 | 0 |
| T6 | 1 | 4 BHK | 2 | 125.38 | - |
| T6 | 1 | 4 BHK | 1 | 148.08 | - |
| T6 | 2 | 4 BHK | 2 | 125.38 | - |
| T6 | 2 | 4 BHK | 1 | 148.08 | - |
| T6 | 3 | 4 BHK | 2 | 125.38 | - |
| T6 | 3 | 4 BHK | 1 | 148.08 | - |
| T6 | 4 | 4 BHK | 2 | 125.38 | - |
| T6 | 4 | 4 BHK | 1 | 148.08 | - |
| T6 | 5 | 4 BHK | 2 | 125.38 | - |
| T6 | 5 | 4 BHK | 1 | 148.08 | - |
| T6 | 6 | 4 BHK | 2 | 125.38 | - |
| T6 | 6 | 4 BHK | 1 | 148.08 | - |
| T6 | 7 | 4 BHK | 2 | 125.38 | - |
| T6 | 7 | 4 BHK | 1 | 148.08 | - |
| T6 | 8 | 4 BHK | 2 | 125.38 | - |
| T6 | 8 | 4 BHK | 1 | 148.08 | - |
| T6 | 9 | 4 BHK | 2 | 125.38 | - |
| T6 | 9 | 4 BHK | 1 | 148.08 | - |
| T6 | 10 | 4 BHK | 2 | 125.38 | - |
| T6 | 10 | 4 BHK | 1 | 148.08 | - |
| T6 | 11 | 4 BHK | 2 | 125.38 | - |
| T6 | 11 | 4 BHK | 1 | 148.08 | - |
| T6 | 12 | 4 BHK | 2 | 125.38 | - |
| T6 | 12 | 4 BHK | 1 | 148.08 | - |
| T6 | 13 | 4 BHK | 2 | 125.38 | - |
| T6 | 13 | 4 BHK | 1 | 148.08 | - |
| T6 | 14 | 4 BHK | 2 | 125.38 | - |
| T6 | 14 | 4 BHK | 1 | 148.08 | - |
| T6 | 15 | 4 BHK | 2 | 125.38 | - |
| T6 | 15 | 4 BHK | 1 | 148.08 | - |
| T6 | 16 | 4 BHK | 2 | 125.38 | - |
| T6 | 16 | 4 BHK | 1 | 148.08 | - |
| T6 | 17 | 4 BHK | 2 | 125.38 | - |
| T6 | 17 | 4 BHK | 1 | 148.08 | - |
| T6 | 18 | 4 BHK | 2 | 125.38 | - |
| T6 | 18 | 4 BHK | 1 | 148.08 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Project site is located adjacent to new High Court Complex and Indira Gandhi Pratishthan Bhawan. |
| Boundary Wall | Boundary wall shall be constructed as per approved layout plan. |
| Road Work | 6 mts wide internal road shall be provided as per approved layout. |
| Footpaths | Footpaths shall be provided as per the landscape scheme. |
| Water Supply Including Drinking Water Facilities | Municipal supplied water from Jal Kal Vibhag will be treated as per requirement for domestic water. |
| Sewer System | Sewerage from households shall be treated in STP and the overflow will be connected with Municipal drainage. |
| Drain | Storm water shall be collected and recharged in ground. Final overflow will be connected with Municipal drainage system if required. |
| Parks | Parks shall be provided as per approved layout plan. |
| Tree Planting | Evergreen flowering trees shall be provided as per the landscape scheme. |
| Design For Electric Supply Including Street Lighting | Direct supply of electricity shall be supplied by UPPCL and the design is as per UPPCL standards. |
| Community Buildings | Common club shall be provided. |
| Treatment and Disposal System of Sewage and Sullage water | STP will be provided to treat sewerage and treated water will be reused for flushing and irrigation. |
| Solid Waste Management And Disposal System | Solid waste shall be collected and disposed through Municipal approved vendor. |
| Water Conservation System | Low flow fixtures shall be provided. |
| Energy Management System Including Use of Renewable Energy | Energy conservation measures like use of solar energy for street lighting and use of LED and CFL lights. |
| Fire Protection And Fire Safety System | Fire protection and fire safety system shall be provided as per NBC 2005(Part IV). |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Roads, fire tender path, parks shall be provided. |
| Emergency Evacuation Services | Emergency evacuation services shall be provided as per NBC 2005. |
| Other Miscellaneous Work | Internal road and parks shall be provided. |
Bank Details
| Bank Name | Kotak Mahindra Bank |
| Branch | Kotak Mahindra Bank JMD Regent Square.Mehrauli Gurgaon Road, Gurgaon 122002,Haryana |
| Branch Address | JMD Regent Square.Mehrauli Gurgaon Road, Gurgaon 122002,Haryana |
| Account Holder | Experion Developers Private Limited. |
| Account Number | 2112912264 |
| IFSC Code | KKBK0000261 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





