Gopal Tirath Apartments (Tower C)
TIRATH RAM SUMER KUMAR
Lucknow, Uttar Pradesh
Approved
1st Jan 2023
Completed
23rd Feb 2025
Registration No.
UPRERAPRJ910190
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ910190 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2023-01-01 |
| Completion Date | 2025-02-23 |
| Total Area (sqm) | 2490 |
| Project Cost (Lacs) | 9100 |
| Duration (Months) | 26 |
| Registration Fee | 17500 |
Promoter Details
| Promoter Name | TIRATH RAM SUMER KUMAR |
| Promoter ID | UPRERAPRM214859 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | Arun Kumar |
| Contractor | Umar Construction Services |
| Structural Engineer | Ashok Gupta |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 569,572,573,578 | 2490 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Tower C | GF | OTHER | 0 | 0 | 0 |
| Tower C | 1 | 2 BHK | 4 | 69.81 | - |
| Tower C | 1 | 3 BHK | 4 | 99.27 | - |
| Tower C | 2 | 2 BHK | 4 | 69.81 | - |
| Tower C | 2 | 3 BHK | 4 | 99.27 | - |
| Tower C | 3 | 2 BHK | 4 | 69.81 | - |
| Tower C | 3 | 3 BHK | 4 | 99.27 | - |
| Tower C | 4 | 2 BHK | 4 | 69.81 | - |
| Tower C | 4 | 3 BHK | 4 | 99.27 | - |
| Tower C | 5 | 2 BHK | 2 | 69.81 | - |
| Tower C | 5 | OTHER | 4 | 25 | - |
| Tower C | 5 | OTHER | 4 | 35.00 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot is already demarcated all the development and construction work will be done under the demarcated plot. |
| Boundary Wall | Brick made boundary wall combination of RCC is proposed around the project as per sanctioned plan. |
| Road Work | 6 Mt wide Apex Road is proposed as per sanctioned plan. |
| Footpaths | 1 mt. wide footpath using interlocking paver block is proposed along both side of the road, will be developed as per sanctioned plan. |
| Water Supply Including Drinking Water Facilities | Water supply system should be fed threw separate boring system which is propose in campus also we have proposed Over Head Water Tank system at terrace level for water storage, water supply using drinking water facility will provide threw pipe line is proposed as per sanctioned plan. |
| Sewer System | A centralised sewer system is provided, underground sewer line is constructed which will linked with main dumping point. Service manhole (inside Plot)- Size should be 600X600 900X800 either 1200X900 |
| Drain | Storm water system will be provided which will be connected to the Municipal drain line as per specified plan. |
| Parks | Park is proposed as per sanctioned plan. many types of bushes trees and flowers will be planted at the park. |
| Tree Planting | Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan. |
| Design For Electric Supply Including Street Lighting | Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. |
| Community Buildings | There is no community building proposed in our project. |
| Treatment and Disposal System of Sewage and Sullage water | N/A |
| Solid Waste Management And Disposal System | For Waste management and garbage collection dustbin is proposed as per layout and after completing the project it will be handed over to the local municipal corporation. |
| Water Conservation System | A well-designed rainwater harvesting system shall be provided. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights as well as solar lights in external areas. |
| Fire Protection And Fire Safety System | Since the building is less than 30 meter in height all the fire norms shall be followed as per NBC and approval of the fire department. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | It will be connected with main exist sewer line. |
| Emergency Evacuation Services | The staircase will be provided with emergency exit doors in each floor |
| Other Miscellaneous Work | Luxurious entrance lobby shall be provided. |
Bank Details
| Bank Name | ICICI BANK LTD. |
| Branch | Gomti Nagar |
| Branch Address | 3/64, VIVEK KHAND, GOMTINAGAR, LUCKNOW 226010 |
| Account Holder | TIRATH RAM SUMER KUMAR RERA COLLECTION ACCOUNT FOR GOPAL TIRATH APARTMENTS |
| Account Number | 021405007815 |
| IFSC Code | ICIC0000214 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in