GREENBERRY SIGNATURES
TEJAS INFRAVENTURES LLP
Lucknow, Uttar Pradesh
Approved
10th Jul 2019
Completed
9th Apr 2024
Registration No.
UPRERAPRJ161330
Project Type
Residential
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ161330 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2019-07-10 |
| Completion Date | 2024-04-09 |
| Total Area (sqm) | 11528 |
| Project Cost (Lacs) | 4500 |
| Duration (Months) | 57 |
| Registration Fee | 63000 |
Promoter Details
| Promoter Name | TEJAS INFRAVENTURES LLP |
| Promoter ID | UPRERAPRM90244 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | RAKESH SHARMA |
| Contractor | Tejas Infraventures LLP |
| Structural Engineer | T.D ANEJA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | GH-7 | 11528 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A | 1 | 2 BHK | 4 | 59.8 | - |
| B | 3 | 2 BHK | 7 | 59.8 | - |
| B | 4 | 2 BHK | 7 | 59.8 | - |
| B | 5 | 2 BHK | 7 | 59.8 | - |
| B | 8 | 2 BHK | 7 | 59.8 | - |
| B | 9 | 2 BHK | 7 | 59.8 | - |
| B | 10 | 2 BHK | 7 | 59.8 | - |
| B | 11 | 2 BHK | 7 | 59.8 | - |
| B | 12 | 2 BHK | 7 | 59.8 | - |
| B | 13 | 2 BHK | 7 | 59.8 | - |
| B | 14 | 2 BHK | 6 | 59.8 | - |
| C | 1 | 2 BHK | 6 | 59.8 | - |
| C | 2 | 2 BHK | 7 | 59.8 | - |
| C | 3 | 2 BHK | 7 | 59.8 | - |
| C | 4 | 2 BHK | 7 | 59.8 | - |
| C | 5 | 2 BHK | 7 | 59.8 | - |
| C | 6 | 2 BHK | 7 | 59.8 | - |
| C | 7 | 2 BHK | 7 | 59.8 | - |
| C | 8 | 2 BHK | 7 | 59.8 | - |
| C | 9 | 2 BHK | 7 | 59.8 | - |
| C | 10 | 2 BHK | 7 | 59.8 | - |
| C | 11 | 2 BHK | 7 | 59.8 | - |
| C | 12 | 2 BHK | 7 | 59.8 | - |
| C | 13 | 2 BHK | 7 | 59.8 | - |
| C | 14 | 2 BHK | 6 | 59.8 | - |
| D | 1 | 2 BHK | 6 | 59.8 | - |
| D | 2 | 2 BHK | 7 | 59.8 | - |
| D | 3 | 2 BHK | 7 | 59.8 | - |
| D | 4 | 2 BHK | 7 | 59.8 | - |
| D | 5 | 2 BHK | 7 | 59.8 | - |
| D | 6 | 2 BHK | 7 | 59.8 | - |
| D | 7 | 2 BHK | 7 | 59.8 | - |
| D | 8 | 2 BHK | 7 | 59.8 | - |
| D | 9 | 2 BHK | 7 | 59.8 | - |
| D | 10 | 2 BHK | 7 | 59.8 | - |
| D | 11 | 2 BHK | 7 | 59.8 | - |
| D | 12 | 2 BHK | 7 | 59.8 | - |
| D | 13 | 2 BHK | 7 | 59.8 | - |
| D | 14 | 2 BHK | 6 | 59.8 | - |
| A | 2 | 2 BHK | 7 | 59.8 | - |
| A | 3 | 2 BHK | 7 | 59.8 | - |
| A | 4 | 2 BHK | 7 | 59.8 | - |
| A | 5 | 2 BHK | 7 | 59.8 | - |
| A | 6 | 2 BHK | 7 | 59.8 | - |
| A | 7 | 2 BHK | 7 | 59.8 | - |
| A | 8 | 2 BHK | 7 | 59.8 | - |
| A | 9 | 2 BHK | 7 | 59.8 | - |
| A | 10 | 2 BHK | 7 | 59.8 | - |
| A | 11 | 2 BHK | 7 | 59.8 | - |
| A | 12 | 2 BHK | 7 | 59.8 | - |
| A | 13 | 2 BHK | 7 | 59.8 | - |
| A | 14 | 2 BHK | 6 | 59.8 | - |
| B | 1 | 2 BHK | 4 | 59.8 | - |
| B | 2 | 2 BHK | 7 | 59.8 | - |
| B | 6 | 2 BHK | 7 | 59.8 | - |
| B | 7 | 2 BHK | 7 | 59.8 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | NOT APPLICABLE |
| Boundary Wall | IN PROGRESS to be completed by december 2019. |
| Road Work | not applicable |
| Footpaths | not applicable |
| Water Supply Including Drinking Water Facilities | inetrnal water supply shall be developed by the developer and external connectionto be provided by U.p. Awas evam vikas Prishad |
| Sewer System | inetrnal sewer shall be developed by the developer and external connection to be provided by U.P. Awas evam Vikas parishad |
| Drain | has already built by U.P. Awas evam vikas parishad along the plot |
| Parks | to be completed as per landscape plan |
| Tree Planting | to be completed as per landscape plan |
| Design For Electric Supply Including Street Lighting | not applicable |
| Community Buildings | to be completed with A and B Block |
| Treatment and Disposal System of Sewage and Sullage water | S.T.P. plant has been built by U.P. Avas evam Vikas Parishad |
| Solid Waste Management And Disposal System | garbage bins and garbage collection facility has been shown in the plan |
| Water Conservation System | rainwater harvesting as per development plan shall be built |
| Energy Management System Including Use of Renewable Energy | solar power for common area lighting as shown in development plan |
| Fire Protection And Fire Safety System | all fire protection equipments shall be installed as per fire safety drawings as approved by C.F.O. Lucknow |
| Social Infrastructure And Other Public Amenities Including Public Health Services | to be developed as per sanction plan before completion of the project |
| Emergency Evacuation Services | fire escape staircases and exits as per Fire safety drawings approved by C.F.O. |
| Other Miscellaneous Work | all development work shall be done as per development plan before completion of the project |
Bank Details
| Bank Name | KOTAK MAHINDRA BANK |
| Branch | MUNSHIPULIYA LUCKNOW |
| Branch Address | MUNSHIPULIYA LUCKNOW |
| Account Holder | TEJAS INFRAVENTURES LLP |
| Account Number | 5712735776 |
| IFSC Code | KKBK00005653 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in