HIMALYA GALAXY
Himalya Developers PVT LTD
Lucknow, Uttar Pradesh
Approved
1st Jun 2023
Completed
30th Jul 2025
Registration No.
UPRERAPRJ913198
Project Type
Commercial
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ913198 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2023-06-01 |
| Completion Date | 2025-07-30 |
| Total Area (sqm) | 517 |
| Project Cost (Lacs) | 301 |
| Duration (Months) | 26 |
| Registration Fee | 10340 |
Promoter Details
| Promoter Name | Himalya Developers PVT LTD |
| Promoter ID | UPRERAPRM180442 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | Repunjay Kr. Patel |
| Contractor | ROHIT SAHU |
| Structural Engineer | MADAN SINGH |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | 16/COM-9 | 517.50 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| HIMALYA GALAXY | GF | SHOP | 1 | 265.44 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 260.60 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 310.21 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 268.13 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 233.70 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 229.40 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 152.79 | 0 |
| HIMALYA GALAXY | GF | SHOP | 1 | 158.60 | 0 |
| HIMALYA GALAXY | 1 | SHOP | 1 | 265.44 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 260.60 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 268.13 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 310.21 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 233.70 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 229.40 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 152.79 | - |
| HIMALYA GALAXY | 1 | SHOP | 1 | 158.60 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 265.44 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 260.60 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 268.13 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 310.21 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 233.70 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 229.40 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 152.79 | - |
| HIMALYA GALAXY | 2 | SHOP | 1 | 158.60 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 265.44 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 260.60 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 268.13 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 310.21 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 233.70 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 229.40 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 152.79 | - |
| HIMALYA GALAXY | 3 | SHOP | 1 | 158.60 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | COMMERCIAL BUILDING AT PLOT NO 16/COM-9, SECTOR-16, VRINDAVAN YOJNA, LUCKNOW, APPROVED BY UPAVP (AREA- 517.50 SQM) |
| Boundary Wall | 230MM WIDE AND 2.1 METRE HIGH EARTHQUAKE RESISTANT BOUNDARY WALL OF RCC/MILD STELL/ BRICK FILLED. |
| Road Work | ROAD IN THE HIMALAYA GALAXY WILL BE IN COMBINATION OF CONCRETE PAVERS OF DIFFERENT COLOUR, SHAPE, THICKNESS, ROADS WILL BE LAID OVER 225MM WATER BOUND MACADAM. |
| Footpaths | FOOTPATH IN THE HIMALAYA GALAXY WILL BE IN COMBINATION OF INTERLOCKING. |
| Water Supply Including Drinking Water Facilities | POTABLE WATER SUPPLY FROM MUNICIPLE WATER SUPPLY SHALL BE COLLECTEDIN UNDER GROUND COLLECTIONTANK AND PUMPED TO OVERHEAD WATER TANK. THE SUPPLY OF WATER TO INDIVIDUAL SHOPS SHALL BE FROM THE SAIDOVERHEAD WATER TANK. |
| Sewer System | THE SEWAGE WILL BE COLLETECD THOUGH A SOIL PIPELINE ARRANGEMENT BEND WITH MUNICIPLE LINE CONNECTION IN THE PROJECT. |
| Drain | DRAIN HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDED FOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUN OFF) |
| Parks | NA |
| Tree Planting | THE TREE WILL BE PROVIDED AND MAINTAINED IN THE HIMALAYA GALAXY PROJECT. |
| Design For Electric Supply Including Street Lighting | ELECTRIC SUPPLY PROVIDED THROUGH 11/0.433 KV TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUP. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | SEWAGE SHALL BE TREATED IN MUNICIPLE LINE CONNECTION. |
| Solid Waste Management And Disposal System | SOLID WASTE TO BE COLLECTED NAGAR NIGAM VEHICLE FROM PROJET HIMALAY GALAXY INDIVIDUAL SHOPS. |
| Water Conservation System | RAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUND WASTE RECHARGING AND OVERFLOW TO DISCHARGED IN THE MUNICIPLE DRAINS. |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | HDFC BANK |
| Branch | NIRALA NAGAR |
| Branch Address | GROUND FLOOR COMMERCIAL PLOT NO 3, NIRALA NAGAR, LUCKNOW |
| Account Holder | H D PVT LTD COLL. A/C FOR HIMALAYA GALAXY |
| Account Number | 50200081490331 |
| IFSC Code | HDFC0006998 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in