Imperial Estates by Sapphire

Sapphire Infraventures Pvt. Ltd.

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Sept 2024

Completion pending

Pending

31st Mar 2029

Registration No.

UPRERAPRJ263165/10/2024

Project Type

Residential

District

Lucknow

Taluka

Mohanlalganj

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ263165/10/2024
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaMohanlalganj
Start Date2024-09-01
Completion Date2029-03-31
Total Area (sqm)6028
Project Cost (Lacs)8924
Duration (Months)55
Registration Fee35500

Promoter Details

Promoter NameSapphire Infraventures Pvt. Ltd.
Promoter IDUPRERAPRM64792
Mobile99********

Project Team

rolename
ArchitectAkash Thapliyal
ContractorPradeep Kumar Tyagi
Structural EngineerParesh Jauhri

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra804 and 8066028

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower BGFOTHER000
Tower CGFOTHER000
Tower C14 BHK2173.12-
Tower C24 BHK2173.12-
Tower C34 BHK2173.12-
Tower C44 BHK2173.12-
Tower C54 BHK2173.12-
Tower C64 BHK2173.12-
Tower C74 BHK2173.12-
Tower C84 BHK2173.12-
Tower C94 BHK2173.12-
Tower C104 BHK2173.12-
Tower C114 BHK2173.12-
Tower C124 BHK2173.12-
Tower B13 BHK4109.22-
Tower B23 BHK296.39-
Tower B23 BHK4109.22-
Tower B33 BHK296.39-
Tower B33 BHK4109.22-
Tower B43 BHK296.39-
Tower B43 BHK4109.22-
Tower B53 BHK296.39-
Tower B53 BHK4109.22-
Tower B63 BHK296.39-
Tower B63 BHK4109.22-
Tower B73 BHK296.39-
Tower B73 BHK4109.22-
Tower B83 BHK296.39-
Tower B83 BHK4109.22-
Tower B93 BHK296.39-
Tower B93 BHK4109.22-
Tower B103 BHK296.39-
Tower B103 BHK4109.22-
Tower B113 BHK296.39-
Tower B113 BHK4109.22-
Tower B123 BHK296.39-
Tower B123 BHK4109.22-

Development Works

work_namedescription
Demarcation of PlotsAs per sanction plan this is Irregular shaped plot. Having total 1 no. of entry gate and exit gate, from the 12m wide road, Site is surrounded by other plots on one side and another side proposed 60 mtr wide master plan road (master plan 2031)
Boundary Wall1.8 - 2.1m high and 200 mm thick brick work and rcc work in column and beam. MS Board enterance and exit gates are developed with boundary.
Road Work12m wide road on entrance and 6m wide road inside the project with Trimix / asphalt/interlocking Brick/RCC road will be used as per design suggested by the Architect for internal road.
FootpathsNot Applicable
Water Supply Including Drinking Water FacilitiesAll apartments shall be provided with potable water for household activities and STP treated water for flushing. Clear water may also be used, and user can have their individual RO system as per their requirements.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. after treatment, water shall be recycled, and it will use in gardening. overflow from the STP shall be connected with the Municiple sewerage system when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line when come into force.
ParksWe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be Provided. All Sewerage water shall be going to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemWe will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authoritys requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameState Bank of India
BranchS.M.E Hazratganj Branch
Branch AddressHazratganj Branch, Lucknow
Account HolderSAPPHIRE INFRAVENTURES PRIVATE LIMITED - COLLECTION ACCOUNT- IMPERIAL ESTATES BY SAPPHIRE
Account Number43319197189
IFSC CodeSBIN0063629

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy