Imperial Estates by Sapphire
Sapphire Infraventures Pvt. Ltd.
Lucknow, Uttar Pradesh
Approved
1st Sept 2024
Pending
31st Mar 2029
Registration No.
UPRERAPRJ263165/10/2024
Project Type
Residential
District
Lucknow
Taluka
Mohanlalganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ263165/10/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Mohanlalganj |
| Start Date | 2024-09-01 |
| Completion Date | 2029-03-31 |
| Total Area (sqm) | 6028 |
| Project Cost (Lacs) | 8924 |
| Duration (Months) | 55 |
| Registration Fee | 35500 |
Promoter Details
| Promoter Name | Sapphire Infraventures Pvt. Ltd. |
| Promoter ID | UPRERAPRM64792 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | Akash Thapliyal |
| Contractor | Pradeep Kumar Tyagi |
| Structural Engineer | Paresh Jauhri |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 804 and 806 | 6028 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Tower B | GF | OTHER | 0 | 0 | 0 |
| Tower C | GF | OTHER | 0 | 0 | 0 |
| Tower C | 1 | 4 BHK | 2 | 173.12 | - |
| Tower C | 2 | 4 BHK | 2 | 173.12 | - |
| Tower C | 3 | 4 BHK | 2 | 173.12 | - |
| Tower C | 4 | 4 BHK | 2 | 173.12 | - |
| Tower C | 5 | 4 BHK | 2 | 173.12 | - |
| Tower C | 6 | 4 BHK | 2 | 173.12 | - |
| Tower C | 7 | 4 BHK | 2 | 173.12 | - |
| Tower C | 8 | 4 BHK | 2 | 173.12 | - |
| Tower C | 9 | 4 BHK | 2 | 173.12 | - |
| Tower C | 10 | 4 BHK | 2 | 173.12 | - |
| Tower C | 11 | 4 BHK | 2 | 173.12 | - |
| Tower C | 12 | 4 BHK | 2 | 173.12 | - |
| Tower B | 1 | 3 BHK | 4 | 109.22 | - |
| Tower B | 2 | 3 BHK | 2 | 96.39 | - |
| Tower B | 2 | 3 BHK | 4 | 109.22 | - |
| Tower B | 3 | 3 BHK | 2 | 96.39 | - |
| Tower B | 3 | 3 BHK | 4 | 109.22 | - |
| Tower B | 4 | 3 BHK | 2 | 96.39 | - |
| Tower B | 4 | 3 BHK | 4 | 109.22 | - |
| Tower B | 5 | 3 BHK | 2 | 96.39 | - |
| Tower B | 5 | 3 BHK | 4 | 109.22 | - |
| Tower B | 6 | 3 BHK | 2 | 96.39 | - |
| Tower B | 6 | 3 BHK | 4 | 109.22 | - |
| Tower B | 7 | 3 BHK | 2 | 96.39 | - |
| Tower B | 7 | 3 BHK | 4 | 109.22 | - |
| Tower B | 8 | 3 BHK | 2 | 96.39 | - |
| Tower B | 8 | 3 BHK | 4 | 109.22 | - |
| Tower B | 9 | 3 BHK | 2 | 96.39 | - |
| Tower B | 9 | 3 BHK | 4 | 109.22 | - |
| Tower B | 10 | 3 BHK | 2 | 96.39 | - |
| Tower B | 10 | 3 BHK | 4 | 109.22 | - |
| Tower B | 11 | 3 BHK | 2 | 96.39 | - |
| Tower B | 11 | 3 BHK | 4 | 109.22 | - |
| Tower B | 12 | 3 BHK | 2 | 96.39 | - |
| Tower B | 12 | 3 BHK | 4 | 109.22 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per sanction plan this is Irregular shaped plot. Having total 1 no. of entry gate and exit gate, from the 12m wide road, Site is surrounded by other plots on one side and another side proposed 60 mtr wide master plan road (master plan 2031) |
| Boundary Wall | 1.8 - 2.1m high and 200 mm thick brick work and rcc work in column and beam. MS Board enterance and exit gates are developed with boundary. |
| Road Work | 12m wide road on entrance and 6m wide road inside the project with Trimix / asphalt/interlocking Brick/RCC road will be used as per design suggested by the Architect for internal road. |
| Footpaths | Not Applicable |
| Water Supply Including Drinking Water Facilities | All apartments shall be provided with potable water for household activities and STP treated water for flushing. Clear water may also be used, and user can have their individual RO system as per their requirements. |
| Sewer System | Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. after treatment, water shall be recycled, and it will use in gardening. overflow from the STP shall be connected with the Municiple sewerage system when come into force. |
| Drain | Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line when come into force. |
| Parks | We will provide green area with the different activities and the green area will have gaming facilities for kids. |
| Tree Planting | We will provide many type of trees all along the boundary wall & green area |
| Design For Electric Supply Including Street Lighting | We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be Provided. All Sewerage water shall be going to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use. |
| Fire Protection And Fire Safety System | We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authoritys requirement. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | We will have staircases which will be provided with emergency exit doors and emergency exit gates |
| Other Miscellaneous Work | Not Applicable |
Bank Details
| Bank Name | State Bank of India |
| Branch | S.M.E Hazratganj Branch |
| Branch Address | Hazratganj Branch, Lucknow |
| Account Holder | SAPPHIRE INFRAVENTURES PRIVATE LIMITED - COLLECTION ACCOUNT- IMPERIAL ESTATES BY SAPPHIRE |
| Account Number | 43319197189 |
| IFSC Code | SBIN0063629 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





