New Launch - India Real Estate Report 2026.

Jashn Elevate Phase 1

Privue Builders Private Limited

Lucknow, Uttar Pradesh

RERA approved

Approved

15th Feb 2024

Completion pending

Pending

14th Feb 2029

Registration No.

UPRERAPRJ654285/05/2024

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ654285/05/2024
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2024-02-15
Completion Date2029-02-14
Total Area (sqm)7697
Project Cost (Lacs)19461.70
Duration (Months)60
Registration Fee43500

Promoter Details

Promoter NamePrivue Builders Private Limited
Promoter IDUPRERAPRM254590
Mobile96********

Project Team

rolename
ArchitectAr. Vikas Vijay C/o Design Forum International
ContractorSelf
Structural EngineerV D Sharma C/o Optimum design Pvt ltd.

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra300, 301, 30511140

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block CGF3 BHK2113.5260
Block CGF3 BHK2126.8110
Block C13 BHK2113.526-
Block C13 BHK2126.811-
Block C23 BHK2113.526-
Block C23 BHK2126.811-
Block C33 BHK2113.526-
Block C33 BHK2126.811-
Block C43 BHK2113.526-
Block C43 BHK2126.811-
Block C53 BHK2113.526-
Block C53 BHK2126.811-
Block C63 BHK2113.526-
Block C63 BHK2126.811-
Block C73 BHK2113.526-
Block C73 BHK2126.811-
Block C83 BHK2113.526-
Block C83 BHK2126.811-
Block C93 BHK2113.526-
Block C93 BHK2126.811-
Block C103 BHK2113.526-
Block C103 BHK2126.811-
Block C113 BHK2113.526-
Block C113 BHK2126.811-
Block C123 BHK2113.526-
Block C123 BHK2126.811-
Block C133 BHK2113.526-
Block C133 BHK2126.811-
Block C143 BHK2113.526-
Block C143 BHK2126.811-
Block C153 BHK2113.526-
Block C153 BHK2126.811-
Block CGF2 BHK482.2180
Block CGF3 BHK292.8090
Block C12 BHK482.218-
Block C13 BHK292.809-
Block C22 BHK482.218-
Block C23 BHK292.809-
Block C32 BHK482.218-
Block C33 BHK292.809-
Block C42 BHK482.218-
Block C43 BHK292.809-
Block C52 BHK482.218-
Block C53 BHK292.809-
Block C62 BHK482.218-
Block C63 BHK292.809-
Block C72 BHK482.218-
Block C73 BHK292.809-
Block C82 BHK482.218-
Block C83 BHK292.809-
Block C92 BHK482.218-
Block C93 BHK292.809-
Block C102 BHK482.218-
Block C103 BHK292.809-
Block C112 BHK482.218-
Block C113 BHK292.809-
Block C122 BHK482.218-
Block C123 BHK292.809-
Block C132 BHK482.218-
Block C133 BHK292.809-
Block C142 BHK482.218-
Block C143 BHK292.809-
Block C152 BHK482.218-
Block C153 BHK292.809-
Block CGF3 BHK492.8090
Block C13 BHK492.809-
Block C23 BHK492.809-
Block C33 BHK492.809-
Block C43 BHK492.809-
Block C53 BHK492.809-
Block C63 BHK492.809-
Block C73 BHK492.809-
Block C83 BHK492.809-
Block C93 BHK492.809-
Block C103 BHK492.809-
Block C113 BHK492.809-
Block C123 BHK492.809-
Block C133 BHK492.809-
Block C143 BHK492.809-
Block C153 BHK492.809-

Development Works

work_namedescription
Demarcation of PlotsDemarcation of plot admeasuring of total area 38919.26 sqmt has been done at site.
Boundary WallBoudary wall 7.5 ft height brickwork and MS Railing completed all around the plot boundary.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking Paver /RCC road through out the project. Whose width shall be 6mt as per the architecture drawing.
FootpathsInterlocking paver to be provided on the foothpath as per drawings
Water Supply Including Drinking Water FacilitiesWe provide water from our own 2 nos of borewells constructed under our premises through underground tank and overhead tank on each block.
Sewer SystemSewerage network shall be Provided. All Sewerage water shall go to the STP and overflow from the STP shall be connected to the Trunk of sushant golf city network
DrainStorm water from Roads/ Building Terrace and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with external drainage of sushant golf city drainage work.
ParksWe will provide green area with the different activities with landscape features play area for kids.
Tree PlantingDifferent varities of plants shall be provided along with the boundary and in landscape area as per the drawing
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG backup for common service like External lighting, Fountain, STP, Pump room and DG backup maximum upto 3 kva to be provided to each flat/Dwelling units through dual metering sysytem etc.
Community BuildingsPromoter will provide Club House/Community center featuring a swimming pool, seating area, and garden in upcoming phases. All allottees from every phase will have access to these amenities.
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Trunk sewerage system of Sushant Golf Hitech City.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemRain water harvesting to be to improve the ground water level. The treated water from STP shall be used for irrigation and for flush water.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas and inside the flats and basements as per the NBC and local fire norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkThe project consist of Block C having 3 towers (Tower 5,6,7) in this project.

Bank Details

Bank NameState Bank of India
BranchCOMMERCIAL BRANCH LUCKNOW
Branch Address6A,WAY ROAD, GOKHLE MARG LUCKNOW, UTTAR PRADESH
Account HolderPrivue Builders Pvt Ltd - Coll A/c- Jashn Elevate Phase - I
Account Number42746792993
IFSC CodeSBIN0004166

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy