New Launch - India Real Estate Report 2026.

Kailasha Awadh

Marigold Buildcon

Lucknow, Uttar Pradesh

RERA approved

Approved

12th Sept 2023

Completion pending

Pending

11th Sept 2028

Registration No.

UPRERAPRJ850664

Project Type

Commercial

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ850664
Project StatusNew
Project CategoryCommercial
DistrictLucknow
TalukaSarojini Nagar
Start Date2023-09-12
Completion Date2028-09-11
Total Area (sqm)5592
Project Cost (Lacs)4534
Duration (Months)60
Registration Fee66000

Promoter Details

Promoter NameMarigold Buildcon
Promoter IDUPRERAPRM257672
Mobile78********

Project Team

rolename
ArchitectDeepankar Sharma
ContractorBaba Construction Pvt. Ltd.
Structural EngineerChhatrapal Singh

Land Details

typekhasra_or_plot_noarea_sqmt
Plot26.45.38.96 N, 80.55.23.36 E0
Plot26.45.41.13 N, 80.55.23.33 E0
Plot26.45.38.00 N, 80.55.21.54 E0
Plot26.45.39.97 N, 80.55.19.72 E5593

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower-1BSMNTSHOP130.199-
Tower-1BSMNTSHOP1729.988-
Tower-1BSMNTSHOP156.7-
Tower-1BSMNTSHOP117.173-
Tower-1BSMNTSHOP1619.448-
Tower-1BSMNTSHOP123.71-
Tower-1BSMNTSHOP117.24-
Tower-1BSMNTSHOP713.149-
Tower-1BSMNTSHOP48.829-
Tower-1BSMNTSHOP113.922-
Tower-1BSMNTSHOP1113.149-
Tower-1BSMNTSHOP713.77-
Tower-1BSMNTSHOP110.36-
Tower-1BSMNTSHOP78.829-
Tower-1BSMNTSHOP113.22-
Tower-1GFSHOP130.1990
Tower-1GFSHOP1729.9880
Tower-1GFSHOP156.70
Tower-1GFSHOP117.1730
Tower-1GFSHOP1619.4480
Tower-1GFSHOP123.710
Tower-1GFSHOP125.20
Tower-1GFSHOP713.1490
Tower-1GFSHOP48.8290
Tower-1GFSHOP114.290
Tower-1GFSHOP1113.1490
Tower-1GFSHOP713.770
Tower-1GFSHOP110.360
Tower-1GFSHOP213.770
Tower-1GFSHOP110.360
Tower-1GFSHOP108.8290
Tower-1GFSHOP113.220
Tower-11SHOP130.199-
Tower-11SHOP829.988-
Tower-11SHOP249.833-
Tower-11SHOP729.988-
Tower-11SHOP156.7-
Tower-11SHOP117.173-
Tower-11SHOP719.448-
Tower-11SHOP232.318-
Tower-11SHOP719.448-
Tower-11SHOP123.71-
Tower-11SHOP125.2-
Tower-11SHOP713.149-
Tower-11SHOP48.829-
Tower-11SHOP114.29-
Tower-11SHOP1113.149-
Tower-11SHOP713.77-
Tower-11SHOP110.36-
Tower-11SHOP213.77-
Tower-11SHOP110.36-
Tower-11SHOP108.829-
Tower-11SHOP113.22-
Tower-12OTHER11097.38-
Tower-12OTHER1311.14-
Tower-13OTHER1155.7436-
Tower-13OTHER1155.7436-

Development Works

work_namedescription
Demarcation of PlotsWe have one plot of size 5592.52 sq. mtr.having 1 main entrance gate from the 24 m wide front road.
Boundary Wall2Mtr High Precast Rcc Boundary wall at the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we will make 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 6 - 10 mtr.
FootpathsNA
Water Supply Including Drinking Water FacilitiesWe will provide Two nos. of pump for the requirement of blocks through underground pipelines.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksNA
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemFire protection will be provides as per By-lays and Guidelines of Fire Dept.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkNA

Bank Details

Bank NameCANARA BANK
BranchSECTOR-8, INDIRA NAGAR, LUCKNOW
Branch AddressLITTLE ANGELS HIGH SCHOOL, SECTOR- 8, INDIRA NAGAR, LUCKNOW, UTTAR PRADESH- 226016
Account HolderMB COLLECTION ACCOUNT FOR KAILASHA AWADH
Account Number120024748958
IFSC CodeCNRB0018487

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy