KAILASHA ENCALVE
BABA INFRA DEVELOPERS LLP
Lucknow, Uttar Pradesh
Approved
1st Sept 2021
Completed
31st Aug 2025
Registration No.
UPRERAPRJ418011
Project Type
Residential
District
Lucknow
Taluka
Mohanlalganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ418011 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Mohanlalganj |
| Start Date | 2021-09-01 |
| Completion Date | 2025-08-31 |
| Total Area (sqm) | 86446 |
| Project Cost (Lacs) | 11000 |
| Duration (Months) | 48 |
| Registration Fee | 437500 |
Promoter Details
| Promoter Name | BABA INFRA DEVELOPERS LLP |
| Promoter ID | UPRERAPRM150796 |
| Mobile | 78******** |
Project Team
| role | name |
|---|---|
| Architect | Deepankar Sharma |
| Contractor | Baba Infra Developers LLP |
| Structural Engineer | Chhatrapal Singh Rajput |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | Proposed residential township Kailasha enclave at khasra no. 258, 258, 265VA, 262, 256,261, 261,263, 264, 259, 261, 256, 268, 263 and 264, at village madharmau kalan, khasra no. 326, 327, 328,330, 323, 315, 324, 333, 334, 331, 311, 310, 332, 326, 327, 328, 330, 332, 312, 332 at Village Madharmau khurd, Khasra no. 3012, 3000, 3013, 3025, 3006, 3016, 3017, 3018, 3001, 3002, 3004, 3005, 3022, 3023, 3020, 3019 S, 3009, 3010, 3011, 3014, 3015 at village Bakkas, Khasta no. 2 and 1 MA at Village Pahad Nagar Tikariya, Tehsil Mohanlalganj, Lucknow | 94301.3 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is a single plot having 1 total no. of entry gate and 1 no. of exit gate from the 18m wide front road and 9m internal road |
| Boundary Wall | 2 m high and 200 mm thick boundary wall designed. Brick work of 9 inches and RCC work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary |
| Road Work | Concerete road with bituminous cover/ high quality concrete pavers will be used as per design as suggested by architect for internal road |
| Footpaths | As per the requirement |
| Water Supply Including Drinking Water Facilities | Ground water will be used. End user shall use their individual RO system as per their requirement. Overhead tanks shall be provided for distribution through gravity |
| Sewer System | Centralized sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment, water shall be recycled and it will be used in gardening, overflow from STP shall be connected with Municiple sewerage system. |
| Drain | Storm water system shall be provided. Storm water from roads and other landscape area shall be connected to the storm water drain channel and go to the rain eater harvesting pit for recharging the ground water and overflow shall connect with municiple drain line. |
| Parks | There is four lush green park and green areas along the plot, play area for childrens and different recreational activities |
| Tree Planting | There will be various types of trees provided on site. |
| Design For Electric Supply Including Street Lighting | We have designed the system as per local electricity board and consider centralized transformer, HT Panel, LT Panel, Feeder pillar and DG back for common service like external lighting, STP, Pump room etc |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Centralized sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment, water shall be recycled and it will be used in gardening, overflow from STP shall be connected with municiple drain line |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | A well designed rain water harvesting system shall be provided for parks to conserve water. |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage, storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewerage shall go to STP for recylcing the water. Storm water for roofs, roads and other area shall connect to storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall connected with municiple drain line. |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | Luxurious main entrance and convenience store along side of community center for day to day small purchasing, lush green shurbs at every vacant space on ground. |
Bank Details
| Bank Name | Punjab and Sind Bank |
| Branch | Hazratganj Branch |
| Branch Address | Hazratganj, M.G Road, Lucknow |
| Account Holder | BABA INFRA DEVELOPERS LLP- SEPARATE BANK A/C FOR KAILASHA ENCLAVE |
| Account Number | 01661100003976 |
| IFSC Code | PSIB0000166 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in