K.L. Heights
NIRMAN
Lucknow, Uttar Pradesh
Approved
1st Jul 2019
Completed
31st Dec 2022
Registration No.
UPRERAPRJ790597
Project Type
Residential
District
Lucknow
Taluka
Bakshi Ka Talab**
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ790597 |
| Project Status | Completed |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Bakshi Ka Talab** |
| Start Date | 2019-07-01 |
| Completion Date | 2022-12-31 |
| Total Area (sqm) | 3199 |
| Project Cost (Lacs) | 1205 |
| Duration (Months) | 42 |
| Registration Fee | 21000 |
Promoter Details
| Promoter Name | NIRMAN |
| Promoter ID | UPRERAPRM92866 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | Mr. Punit Srivastav |
| Contractor | M/s Nirman |
| Structural Engineer | Mayank Mittal |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1196 | 3198.96 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A | 1 | 2 BHK | 4 | 70.23 | - |
| A | 1 | 3 BHK | 4 | 88.98 | - |
| A | 2 | 2 BHK | 4 | 70.23 | - |
| A | 2 | 3 BHK | 4 | 88.98 | - |
| A | 3 | 2 BHK | 4 | 70.23 | - |
| A | 3 | 3 BHK | 4 | 88.98 | - |
| A | 4 | 2 BHK | 4 | 70.23 | - |
| A | 4 | 3 BHK | 4 | 88.98 | - |
| A | 5 | 2 BHK | 4 | 70.23 | - |
| A | 5 | 3 BHK | 4 | 88.98 | - |
| A | 6 | 3 BHK | 4 | 88.98 | - |
| A | 7 | 2 BHK | 2 | 70.23 | - |
| A | 7 | 3 BHK | 2 | 88.98 | - |
| A | 6 | 2 BHK | 4 | 70.23 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | SOUTH-18 M WIDE ROAD,WEST-9.0 M WIDE ROAD NORTH-KHASRA NO.-1195 & EAST LDA COLONY APPROACH ROAD |
| Boundary Wall | 2.7 M all around. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex. |
| Road Work | Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points. |
| Footpaths | Part of 6.0 M wide driveway all around the building block |
| Water Supply Including Drinking Water Facilities | underground water to be supplied through terrace tank. |
| Sewer System | Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and washing. overflow from the STP shall be connected to the Municipal sewerage system. |
| Drain | Storm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main road. |
| Parks | Beautifully landscaped area in front as per the required of LDA Norms. |
| Tree Planting | "There are 4 type of trees proposed at site: which are kachnar, gulmauhar, ashok, and neem." |
| Design For Electric Supply Including Street Lighting | A well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Centralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, & washing system . Overflow from the STP shall be connected with the Municipal sewerage system. |
| Solid Waste Management And Disposal System | "Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point. for the solid waste management." |
| Water Conservation System | A well designed rain water harvesting system has been planned along with 2 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes. |
| Energy Management System Including Use of Renewable Energy | We will use solar energy & LED light fittings for all the common areas |
| Fire Protection And Fire Safety System | Fire NOC is obtained from the fire departments and all the works of fire fighting shall be done as per the NOC |
| Social Infrastructure And Other Public Amenities Including Public Health Services | N.A. |
| Emergency Evacuation Services | Exits from each and every point has been planned and proposed as per norms in case of emergency. |
| Other Miscellaneous Work | N.A. |
Bank Details
| Bank Name | Bank of India |
| Branch | Aishbagh Lucknow |
| Branch Address | Bank of India, Aishbagh, Lucknow |
| Account Holder | M/s Nirman KL Heights Project A/c RERA |
| Account Number | 680322410000001 |
| IFSC Code | BKID0006803 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi