Lavanya Enclave

Shaurya Constructions

Lucknow, Uttar Pradesh

RERA approved

Approved

8th Apr 2021

Project completed

Completed

7th Apr 2024

Registration No.

UPRERAPRJ580431

Project Type

Residential

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ580431
Project StatusCompleted
Project CategoryResidential
DistrictLucknow
TalukaLucknow
Start Date2021-04-08
Completion Date2024-04-07
Total Area (sqm)8787
Project Cost (Lacs)1004
Duration (Months)36
Registration Fee49000

Promoter Details

Promoter NameShaurya Constructions
Promoter IDUPRERAPRM152573
Mobile78********

Project Team

rolename
ArchitectRajnish Agarwal
ContractorVimlesh kumar Singh
Structural EngineerAbhishek kumar sharma

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra315, 319, 320MI, 321, 366, 36713113

Development Works

work_namedescription
Demarcation of PlotsPlots will be demarcated through numbering on RCC bricks
Boundary WallNA
Road WorkFrom the main entrance gate, we have 80mm thick damar road throughout the project whose wideness starts 9 mtr.
FootpathsNA
Water Supply Including Drinking Water FacilitiesWe will provide 2 nos of pump from the requirement of blocks through underground pipelines.
Sewer SystemA modular sewerage system shall be provided. All sewer water shall go to STP and overflow from STP shall go into the municipal sewerage system when comes into force.
DrainStrom water shall be provided. Strom water from roads and other landscape areas shall connect to stormwater drain channel and go to rainwater harvesting pit for recharge the groundwater and overflow shall connect to the municipal drain line.
ParksWe will provide green area with different activities and it will have gaming facilities for kids.
Tree PlantingWe will provide many types of trees all along with the boundary work
Design For Electric Supply Including Street LightingWe will design and implement system as per the local electricity board and will consider centralized transformer, HT/LT panel, Feeder, Pillar, and DG back for common service like external lighting fountain pump room etc.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterA modular sewerage system shall be provided. All sewerage water shall go to STP and overflow from STP shall connect with the municipal sewerage system when comes to force
Solid Waste Management And Disposal SystemThere are proper garbage collection areas provided for solid waste management
Water Conservation SystemWe will suggest to individuals to use low flow fixtures as well as a dual flush cistern and raw water harvesting system to reduce consumption and improve ground water level.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in the external area as well as solar lights. In the pump room, all types of equipment have energy-efficient motors.
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameIndian Bank
BranchAhimamahu Branch
Branch AddressIndian Bank Ahimamahu Branch Lucknow
Account HolderM/s. Shaurya Constructions RERA Collection Account for Lavanya Enclave
Account Number7080215116
IFSC CodeIDBI000A532

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy