Life and Joy
Aakansha Infratech
Lucknow, Uttar Pradesh
Approved
1st Apr 2022
Pending
31st Mar 2028
Registration No.
UPRERAPRJ726971
Project Type
Residential
District
Lucknow
Taluka
Mohanlalganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ726971 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Mohanlalganj |
| Start Date | 2022-04-01 |
| Completion Date | 2028-03-31 |
| Total Area (sqm) | 6461 |
| Project Cost (Lacs) | 5220 |
| Duration (Months) | 72 |
| Registration Fee | 37500 |
Promoter Details
| Promoter Name | Aakansha Infratech |
| Promoter ID | UPRERAPRM171178 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Mr. Rakesh Vasudeva |
| Contractor | Self |
| Structural Engineer | Mr. Sanjay Sharma |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | GH-01, Sector-1, Pocket-2 in Pintail Park City at Village-Mastemau, Tehsil-Mohanlalganj, Distt. - Lucknow | 6461.069 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Tower - A | 1 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 2 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 3 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 4 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 5 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 6 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 7 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 8 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 9 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 10 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 11 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 12 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 13 | 3 BHK | 4 | 80.01 | - |
| Tower - A | 14 | 3 BHK | 4 | 80.01 | - |
| Tower - B | 1 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 2 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 3 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 4 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 5 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 6 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 7 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 8 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 9 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 10 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 11 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 12 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 13 | 3 BHK | 4 | 77.75 | - |
| Tower - B | 14 | 3 BHK | 4 | 77.75 | - |
| Tower - C | 1 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 2 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 3 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 4 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 5 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 6 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 7 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 8 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 9 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 10 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 11 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 12 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 13 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 14 | 3 BHK | 3 | 77.75 | - |
| Tower - C | 1 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 2 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 3 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 4 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 5 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 6 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 7 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 8 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 9 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 10 | 2 BHK | 1 | 63.33 | - |
| Tower - C | 11 | 2 BHK | 1 | 63.33 | - |
| Tower - D | 1 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 2 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 3 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 4 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 5 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 6 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 7 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 8 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 9 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 10 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 11 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 12 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 13 | 3 BHK | 2 | 76.54 | - |
| Tower - D | 14 | 3 BHK | 2 | 76.54 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have one plot of size 6461.069 sq. mtr.having 1 main entrance gate from the 30 m wide front road. |
| Boundary Wall | 2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall. |
| Road Work | From the main entrance gate we have 80 mm thick interlocking brick road through out the project. Whose wideness starts from 10 mtr. |
| Footpaths | We would not provide any footpath |
| Water Supply Including Drinking Water Facilities | We will provide water supply for the requirement of blocks through underground tank which will get water supply from water supply line given to us by Pintail Infracon. |
| Sewer System | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force. |
| Drain | Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| Parks | No parks as our group housing is inside an Integrated Township (Pintail Park City) and the parks are provided inside this integrated township |
| Tree Planting | We will provide many type of trees all along the boundary wall & green area |
| Design For Electric Supply Including Street Lighting | We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use. |
| Fire Protection And Fire Safety System | This Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | We have Proposed common pump room. All Sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | HDFC Bank |
| Branch | Gomti Nagar II |
| Branch Address | B-3/178, VIBHAV KHAND, GOMTI NAGAR, LUCKNOW |
| Account Holder | M/S. AAKANSHA INFRA COLL ACC LIFE AND JOY |
| Account Number | 50200066818332 |
| IFSC Code | HDFC0002623 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





