LJK Vasto Phase I
LJK Construction India Private Limited
Lucknow, Uttar Pradesh
Approved
30th Jan 2023
Pending
29th Jan 2028
Registration No.
UPRERAPRJ172300
Project Type
Residential
District
Lucknow
Taluka
Sarojini Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ172300 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Sarojini Nagar |
| Start Date | 2023-01-30 |
| Completion Date | 2028-01-29 |
| Total Area (sqm) | 32760 |
| Project Cost (Lacs) | 1900 |
| Duration (Months) | 60 |
| Registration Fee | 169000 |
Promoter Details
| Promoter Name | LJK Construction India Private Limited |
| Promoter ID | UPRERAPRM219774 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Sanjay Kumar Gupta |
| Contractor | Supriya Singh C-o Evanka Construction India Pvt Ltd |
| Structural Engineer | Er. Akhilesh Kr Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 581,587,588,590,593,594,595,596,598,607KA,607KH | 103560 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Land is well demarcated at site with a wide opening at main road. |
| Boundary Wall | A 2.4 mt high permanent boundary wall is proposed to be constructed to enclose the site. A well designed gate complex shall be part of it. |
| Road Work | With 18 mt. entrance road, network of 9.00 and 12.00 mt. wide Bituminous road is proposed to be constructed as per CPWD norms. |
| Footpaths | 900 to 1200 mm. wide paved area shall run on both side of the roads as footpath. |
| Water Supply Including Drinking Water Facilities | We will provide Two nos. of pump to fill up UG tank/OHT to supply drinking water to the whole township. Make of pumps and pipes shall be as per the standard good quality specifications. |
| Sewer System | A well designed sewerage system is proposed to be laid to carry sewage/soil water up to STP of required capacity. All the standard quality material shall be used to match CPWD Norms. |
| Drain | Storm water from Roads and other landscape area shall be connected to the Storm water drain channel which shall lead to Rain water harvesting Pits to recharge the Ground water. |
| Parks | Marked green areas shall be developed as theme parks with facilities for elderly, children and residents in general. Low height trees, shrubs and grass carpet shall be common to all the green spaces. |
| Tree Planting | All the roads shall be lined with 4.5 to 6 mt. high trees(Plumeria Alba etc.) at close recommended intervals. |
| Design For Electric Supply Including Street Lighting | We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. |
| Community Buildings | A club building with basic facilities is proposed to be constructed on the marked area. |
| Treatment and Disposal System of Sewage and Sullage water | A well designed sewerage system is proposed to be laid to carry sewage/soil water up to STP of required capacity. All the standard quality material shall be used to match CPWD Norms. |
| Solid Waste Management And Disposal System | There is a proper garbage collection area maked for garbage disposal. Collection shall be lined up with the local municipal authorities. |
| Water Conservation System | Apart from rainwater harvesting, treated water shall be used for irrigation purposes resulting in zero wastage. |
| Energy Management System Including Use of Renewable Energy | Apart from use of LED lights, 25% of the street lights shall have solar back up. Natural light sensitive LED lights shall be used in common areas to avoid electricity wastage. |
| Fire Protection And Fire Safety System | UG tank to have enough reserved storage for fire fighting. Required number of fire hydrants shall be installed with water supply line. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | All the exit roads are a minimum 9 mt. wide with 18.00 mt wide main exit to facilitate an easy emergency exit. |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | ICICI Bank |
| Branch | Vibhuti Khand |
| Branch Address | TC 56 VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW,LUCKNOW,226010 |
| Account Holder | M/S.LJK CONSTRUCTION INDIA PVT. LTD. RERA COLLECTION ACCOUNT FOR LJK VASTO PHASE 1 |
| Account Number | 167105002319 |
| IFSC Code | ICIC0001671 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in