NEELAYA CAPITAL
SHIV BADAN INFRACON PRIVATE LIMITED
Lucknow, Uttar Pradesh
Approved
1st Apr 2024
Pending
15th Jun 2028
Registration No.
UPRERAPRJ753803/10/2024
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ753803/10/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2024-04-01 |
| Completion Date | 2028-06-15 |
| Total Area (sqm) | 4124 |
| Project Cost (Lacs) | 4299 |
| Duration (Months) | 51 |
| Registration Fee | 26000 |
Promoter Details
| Promoter Name | SHIV BADAN INFRACON PRIVATE LIMITED |
| Promoter ID | UPRERAPRM288567 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Sachin Chauhan |
| Contractor | Shivbadan Infracon Pvt Ltd. |
| Structural Engineer | Surjeet Kumar Verma |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 154/3,4 and 149, 150, 151 ka Minjumla | 4135.24 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Block-1 | BSMNT | OTHER | 0 | 0 | - |
| Block-1 | GF | OTHER | 0 | 0 | 0 |
| Block-1 | 1 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 1 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 1 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 1 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 1 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 1 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 2 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 2 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 2 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 2 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 2 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 2 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 3 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 3 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 3 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 3 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 3 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 3 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 4 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 4 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 4 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 4 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 4 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 4 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 5 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 5 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 5 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 5 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 5 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 5 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 6 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 6 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 6 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 6 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 6 | 3 BHK | 1 | 117.15 | - |
| Block-1 | 6 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 7 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 7 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 7 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 7 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 7 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 7 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 8 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 8 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 8 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 8 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 8 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 8 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 9 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 9 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 9 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 9 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 9 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 9 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 10 | 2 BHK | 1 | 74.88 | - |
| Block-1 | 10 | 2 BHK | 1 | 75.94 | - |
| Block-1 | 10 | 3 BHK | 1 | 117.56 | - |
| Block-1 | 10 | 3 BHK | 1 | 118.92 | - |
| Block-1 | 10 | 3 BHK | 1 | 117.51 | - |
| Block-1 | 10 | 3 BHK | 2 | 109.12 | - |
| Block-1 | 11 | 2 BHK | 1 | 75.02 | - |
| Block-1 | 11 | 2 BHK | 1 | 75.04 | - |
| Block-1 | 11 | 3 BHK | 1 | 118.93 | - |
| Block-1 | 12 | 2 BHK | 1 | 74.91 | - |
| Block-1 | 12 | 2 BHK | 1 | 75.09 | - |
| Block-1 | 12 | 3 BHK | 1 | 119.02 | - |
| Block-1 | 13 | 2 BHK | 1 | 74.91 | - |
| Block-1 | 13 | 2 BHK | 1 | 75.09 | - |
| Block-1 | 13 | 3 BHK | 1 | 119.02 | - |
| Block-1 | 14 | 2 BHK | 1 | 74.91 | - |
| Block-1 | 14 | 2 BHK | 1 | 75.09 | - |
| Block-1 | 14 | 3 BHK | 1 | 119.02 | - |
| Block-1 | 15 | 2 BHK | 1 | 74.91 | - |
| Block-1 | 15 | 2 BHK | 1 | 75.09 | - |
| Block-1 | 15 | 3 BHK | 1 | 119.02 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot is already demarcated all the development and construction work will be done under the demarcated plot. |
| Boundary Wall | Brick work boundary wall at the height of 6ft. combination of RCC is proposed around the project as per sanctioned plan. |
| Road Work | 6.00 mt. wide black top road, aggregate of size 0–10 mm mixed with bitumen forms the base, which is coarse and 150 mm thick. Bitumen, such as cutback bitumen, emulsion, and asphalt, finds application in bitumen mix, tack coat,is proposed around the building as per sanctioned plan. |
| Footpaths | Footpath shall be with concrete paving and width roper stand and practice in as city. |
| Water Supply Including Drinking Water Facilities | o Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Outline systems for proper drainage The water line is connected to the water source, which will be a municipal water treatment plant, a well, or another water supply source. Pipelines, pumping stations, and control valves are installed to convey water from the main pup station to various parts of the building and site . The distribution network is designed to optimise flow rates, pressure levels, and water quality and builthroughout the system. |
| Sewer System | A centralised sewer system will be provided, a 300 mm to 600 mm diameter R.C.C. sewer line will be provided. The manhole size will be 900 mm dia (main), and the sub-branch line will be 600 mm dia of the manhole provided as per design of MEP system. |
| Drain | Storm water system will be provided which will be connected to the Municipal drain line as per specified plan. |
| Parks | Not Applicable |
| Tree Planting | Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan. |
| Design For Electric Supply Including Street Lighting | A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, 430 V Fidder piller, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines |
| Community Buildings | There is no community building proposed in our project. |
| Treatment and Disposal System of Sewage and Sullage water | The S.T.P. treats wastewater from the site to remove contaminants and pollutants before discharge into the environment. Treatment processes may include screening, sedimentation, biological treatment (such as activated sludge or bio filtration), and disinfection to meet regulatory standards and protect public health and the environment. |
| Solid Waste Management And Disposal System | For Waste management and garbage collection chambers are proposed as per layout. After completing the project, it will be handed over to the local municipal corporation. |
| Water Conservation System | A well-designed rainwater harvesting system shall be provided. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights as well as solar lights in external areas for energy management system. |
| Fire Protection And Fire Safety System | o Fire norms shall be followed as per NBC and approval of the fire department. Include smoke detectors, heat detectors, and manual pull stations throughout the building. Centralized monitoring with integration for emergency response. Design: Specify a comprehensive sprinkler system (wet, dry, or pre-action). o Hydraulic Calculations: Conduct calculations for water supply and pressure requirements. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not applicable |
| Emergency Evacuation Services | The staircase will provided with emergency exit doors in each floor as per fire department specs |
| Other Miscellaneous Work | Grand entrance lobby shall be provided. |
Bank Details
| Bank Name | State Bank of India |
| Branch | Commercial Branch Lucknow |
| Branch Address | 6A,way Road, Gokhle Marg Lucknow, UP ,Pin-226001 |
| Account Holder | Shiv Badan Infracon Pvt Ltd – Coll A/c Proj - Neelaya Capital |
| Account Number | 43012282368 |
| IFSC Code | SBIN0004166 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in