New Launch - India Real Estate Report 2026.

NEELAYA CAPITAL

SHIV BADAN INFRACON PRIVATE LIMITED

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Apr 2024

Completion pending

Pending

15th Jun 2028

Registration No.

UPRERAPRJ753803/10/2024

Project Type

Residential

District

Lucknow

Taluka

Lucknow

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ753803/10/2024
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaLucknow
Start Date2024-04-01
Completion Date2028-06-15
Total Area (sqm)4124
Project Cost (Lacs)4299
Duration (Months)51
Registration Fee26000

Promoter Details

Promoter NameSHIV BADAN INFRACON PRIVATE LIMITED
Promoter IDUPRERAPRM288567
Mobile98********

Project Team

rolename
ArchitectSachin Chauhan
ContractorShivbadan Infracon Pvt Ltd.
Structural EngineerSurjeet Kumar Verma

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra154/3,4 and 149, 150, 151 ka Minjumla4135.24

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block-1BSMNTOTHER00-
Block-1GFOTHER000
Block-112 BHK174.88-
Block-112 BHK175.94-
Block-113 BHK1117.56-
Block-113 BHK1118.92-
Block-113 BHK1117.51-
Block-113 BHK2109.12-
Block-122 BHK174.88-
Block-122 BHK175.94-
Block-123 BHK1117.56-
Block-123 BHK1118.92-
Block-123 BHK1117.51-
Block-123 BHK2109.12-
Block-132 BHK174.88-
Block-132 BHK175.94-
Block-133 BHK1117.56-
Block-133 BHK1118.92-
Block-133 BHK1117.51-
Block-133 BHK2109.12-
Block-142 BHK174.88-
Block-142 BHK175.94-
Block-143 BHK1117.56-
Block-143 BHK1118.92-
Block-143 BHK1117.51-
Block-143 BHK2109.12-
Block-152 BHK174.88-
Block-152 BHK175.94-
Block-153 BHK1117.56-
Block-153 BHK1118.92-
Block-153 BHK1117.51-
Block-153 BHK2109.12-
Block-162 BHK174.88-
Block-162 BHK175.94-
Block-163 BHK1117.56-
Block-163 BHK1118.92-
Block-163 BHK1117.15-
Block-163 BHK2109.12-
Block-172 BHK174.88-
Block-172 BHK175.94-
Block-173 BHK1117.56-
Block-173 BHK1118.92-
Block-173 BHK1117.51-
Block-173 BHK2109.12-
Block-182 BHK174.88-
Block-182 BHK175.94-
Block-183 BHK1117.56-
Block-183 BHK1118.92-
Block-183 BHK1117.51-
Block-183 BHK2109.12-
Block-192 BHK174.88-
Block-192 BHK175.94-
Block-193 BHK1117.56-
Block-193 BHK1118.92-
Block-193 BHK1117.51-
Block-193 BHK2109.12-
Block-1102 BHK174.88-
Block-1102 BHK175.94-
Block-1103 BHK1117.56-
Block-1103 BHK1118.92-
Block-1103 BHK1117.51-
Block-1103 BHK2109.12-
Block-1112 BHK175.02-
Block-1112 BHK175.04-
Block-1113 BHK1118.93-
Block-1122 BHK174.91-
Block-1122 BHK175.09-
Block-1123 BHK1119.02-
Block-1132 BHK174.91-
Block-1132 BHK175.09-
Block-1133 BHK1119.02-
Block-1142 BHK174.91-
Block-1142 BHK175.09-
Block-1143 BHK1119.02-
Block-1152 BHK174.91-
Block-1152 BHK175.09-
Block-1153 BHK1119.02-

Development Works

work_namedescription
Demarcation of PlotsPlot is already demarcated all the development and construction work will be done under the demarcated plot.
Boundary WallBrick work boundary wall at the height of 6ft. combination of RCC is proposed around the project as per sanctioned plan.
Road Work6.00 mt. wide black top road, aggregate of size 0–10 mm mixed with bitumen forms the base, which is coarse and 150 mm thick. Bitumen, such as cutback bitumen, emulsion, and asphalt, finds application in bitumen mix, tack coat,is proposed around the building as per sanctioned plan.
FootpathsFootpath shall be with concrete paving and width roper stand and practice in as city.
Water Supply Including Drinking Water Facilitieso Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Outline systems for proper drainage The water line is connected to the water source, which will be a municipal water treatment plant, a well, or another water supply source. Pipelines, pumping stations, and control valves are installed to convey water from the main pup station to various parts of the building and site . The distribution network is designed to optimise flow rates, pressure levels, and water quality and builthroughout the system.
Sewer SystemA centralised sewer system will be provided, a 300 mm to 600 mm diameter R.C.C. sewer line will be provided. The manhole size will be 900 mm dia (main), and the sub-branch line will be 600 mm dia of the manhole provided as per design of MEP system.
DrainStorm water system will be provided which will be connected to the Municipal drain line as per specified plan.
ParksNot Applicable
Tree PlantingMany types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
Design For Electric Supply Including Street LightingA Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, 430 V Fidder piller, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
Community BuildingsThere is no community building proposed in our project.
Treatment and Disposal System of Sewage and Sullage waterThe S.T.P. treats wastewater from the site to remove contaminants and pollutants before discharge into the environment. Treatment processes may include screening, sedimentation, biological treatment (such as activated sludge or bio filtration), and disinfection to meet regulatory standards and protect public health and the environment.
Solid Waste Management And Disposal SystemFor Waste management and garbage collection chambers are proposed as per layout. After completing the project, it will be handed over to the local municipal corporation.
Water Conservation SystemA well-designed rainwater harvesting system shall be provided.
Energy Management System Including Use of Renewable EnergyWe will use LED lights as well as solar lights in external areas for energy management system.
Fire Protection And Fire Safety Systemo Fire norms shall be followed as per NBC and approval of the fire department. Include smoke detectors, heat detectors, and manual pull stations throughout the building. Centralized monitoring with integration for emergency response. Design: Specify a comprehensive sprinkler system (wet, dry, or pre-action). o Hydraulic Calculations: Conduct calculations for water supply and pressure requirements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation ServicesThe staircase will provided with emergency exit doors in each floor as per fire department specs
Other Miscellaneous WorkGrand entrance lobby shall be provided.

Bank Details

Bank NameState Bank of India
BranchCommercial Branch Lucknow
Branch Address6A,way Road, Gokhle Marg Lucknow, UP ,Pin-226001
Account HolderShiv Badan Infracon Pvt Ltd – Coll A/c Proj - Neelaya Capital
Account Number43012282368
IFSC CodeSBIN0004166

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy