NRI Retreat Apartment
Arpit Yadav
Lucknow, Uttar Pradesh
Approved
15th Jul 2024
Pending
14th Jul 2029
Registration No.
UPRERAPRJ764470/08/2024
Project Type
Residential
District
Lucknow
Taluka
Lucknow
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ764470/08/2024 |
| Project Status | New |
| Project Category | Residential |
| District | Lucknow |
| Taluka | Lucknow |
| Start Date | 2024-07-15 |
| Completion Date | 2029-07-14 |
| Total Area (sqm) | 2937 |
| Project Cost (Lacs) | 6714 |
| Duration (Months) | 60 |
| Registration Fee | 20000 |
Promoter Details
| Promoter Name | Arpit Yadav |
| Promoter ID | UPRERAPRM280426 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Cosmic Designs Private Limited (Mr Dilbir Singh Bhui) |
| Contractor | Arpyash Real Builders Private Limited |
| Structural Engineer | Anushka Sinha |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Plot No. GH-4 | 2937 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| TOWER A | GF | 4 BHK | 1 | 149.68 | 0 |
| TOWER A | GF | 4 BHK | 1 | 150.51 | 0 |
| TOWER A | GF | SHOP | 1 | 32.48 | 0 |
| TOWER A | GF | OTHER | 1 | 110.33 | 0 |
| TOWER A | 1 | 4 BHK | 1 | 146.57 | - |
| TOWER A | 1 | 4 BHK | 1 | 145.83 | - |
| TOWER A | 1 | 4 BHK | 1 | 146.65 | - |
| TOWER A | 1 | 4 BHK | 1 | 145.73 | - |
| TOWER A | 2 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 2 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 2 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 2 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 3 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 3 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 3 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 3 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 4 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 4 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 4 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 4 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 5 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 5 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 5 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 5 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 6 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 6 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 6 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 6 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 7 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 7 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 7 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 7 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 8 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 8 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 8 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 8 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 9 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 9 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 9 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 9 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 10 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 10 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 10 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 10 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 11 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 11 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 11 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 11 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 12 | 4 BHK | 1 | 150.52 | - |
| TOWER A | 12 | 4 BHK | 1 | 149.69 | - |
| TOWER A | 12 | 4 BHK | 1 | 150.51 | - |
| TOWER A | 12 | 4 BHK | 1 | 149.68 | - |
| TOWER A | 13 | OTHER | 1 | 104.07 | - |
| TOWER A | 13 | OTHER | 1 | 102.93 | - |
| TOWER A | 13 | 4 BHK | 1 | 191.18 | - |
| TOWER A | 14 | OTHER | 1 | 103.02 | - |
| TOWER A | 14 | OTHER | 1 | 104.08 | - |
| TOWER A | 14 | 4 BHK | 1 | 191.64 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have one plot of size 2937 sq. mtr.having 1 main entrance gate from the 18 m wide front road. |
| Boundary Wall | 2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall. |
| Road Work | We will provide R.C.C. road all along the periphery for vehicular traffic. |
| Footpaths | We will provide 1.5 mtr. Footpath along road. |
| Water Supply Including Drinking Water Facilities | Two boreholes 300 ft. Deep. Water pumped to overhead tanks & supplied to units through gravity. The system will be part and parcel of the UGWST to be provided for fire fighting system. |
| Sewer System | Sewage & waste water from the units shall be taken through inspection chamber & underground sewer line to the main sewer provided by Development Authority. |
| Drain | Storm Water from hard surfaces at the rate of 100 percent & 20 percent from the green areas shall be used for rain water harvesting & surplus water shall be drained to the network provided by Development Authority. |
| Parks | Parks shall be provided at appropriate places with grass & seasonal flowers vertical plantations shall be developed along boundary walls. |
| Tree Planting | Required numbers of trees shall be planted along with the boundary wall giving shade to the parked cars. |
| Design For Electric Supply Including Street Lighting | Electric supply shall be harnessed from the board. Transformer, HT & LT panels shall be designed with DG back up for all services and units. |
| Community Buildings | There is no separate community building as such but community spaces like club, cafeteria, gym, swimming pool etc will be provisioned and will be available to residents on demand. |
| Treatment and Disposal System of Sewage and Sullage water | Sewage & waste water from the units shall be taken through inspection chamber & underground sewer line to the main sewer provided by Development Authority. |
| Solid Waste Management And Disposal System | Solid waste shall be bagged & collected floor wise. Collected waste shall be taken up to the point of collection from where it shall be taken to the disposal site by the arrangement of Development Authority. |
| Water Conservation System | All appliances provided shall be of low water consumption. Surface drainage shall be taken to first level through rainwater harvesting system. |
| Energy Management System Including Use of Renewable Energy | All equipments to be used in the complex shall be of the low energy consumption. LED lights & solar lights along with solar energy shall be as per government rules. |
| Fire Protection And Fire Safety System | All provision stipulated by NBC-16 shall be followed. Sprinkler system shall be used in basement. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | Area shall be marked on ground where people can collect in case of emergency |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | Canara Bank |
| Branch | Mohanlal Ganj, Lucknow |
| Branch Address | Mishra Bldg Ist Floor Raibareilly Road Mohanlal Ganj, Lucknow |
| Account Holder | ARPIT YADAV YASHARTH VIKRAM COLL AC NRI RETREAT APT |
| Account Number | 120029857434 |
| IFSC Code | CNRB0018502 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





