New Launch - India Real Estate Report 2026.

Omaxe Metro City Commercial -2 Phase -3

Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited)

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Oct 2024

Completion pending

Pending

13th Jul 2028

Registration No.

UPRERAPRJ868587/10/2024

Project Type

Commercial

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ868587/10/2024
Project StatusNew
Project CategoryCommercial
DistrictLucknow
TalukaSarojini Nagar
Start Date2024-10-01
Completion Date2028-07-13
Total Area (sqm)7424
Project Cost (Lacs)12206
Duration (Months)46
Registration Fee85000

Promoter Details

Promoter NameOmaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited)
Promoter IDUPRERAPRM5708
Mobile87********

Project Team

rolename
ArchitectApurba Borah
ContractorInhouse
Structural EngineerSanjeev Jain

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra20458910

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block-2GFSHOP1100
Block-2GFSHOP1120
Block-2GFSHOP1160
Block-2GFSHOP1180
Block-2GFSHOP1200
Block-2GFSHOP1210
Block-2GFSHOP1220
Block-2GFSHOP1270
Block-2GFSHOP1280
Block-2GFSHOP7290
Block-2GFSHOP3300
Block-2GFSHOP9310
Block-2GFSHOP4320
Block-2GFSHOP2340
Block-2GFSHOP1380
Block-2GFSHOP1400
Block-21SHOP110-
Block-21SHOP115-
Block-21SHOP218-
Block-21SHOP220-
Block-21SHOP1021-
Block-21SHOP522-
Block-21SHOP323-
Block-21SHOP428-
Block-21SHOP729-
Block-21SHOP131-
Block-22SHOP110-
Block-22SHOP115-
Block-22SHOP218-
Block-22SHOP220-
Block-22SHOP1021-
Block-22SHOP522-
Block-22SHOP223-
Block-22SHOP328-
Block-22SHOP629-
Block-22SHOP129-
Block-22SHOP131-
Block-22SHOP148-
Block-23OTHER1889-
Block-24STUDIO224-
Block-24STUDIO926-
Block-24STUDIO928-
Block-24STUDIO229-
Block-25STUDIO424-
Block-25STUDIO926-
Block-25STUDIO127-
Block-25STUDIO928-
Block-25STUDIO229-
Block-26STUDIO424-
Block-26STUDIO926-
Block-26STUDIO127-
Block-26STUDIO928-
Block-26STUDIO229-
Block-27STUDIO424-
Block-27STUDIO926-
Block-27STUDIO127-
Block-27STUDIO928-
Block-27STUDIO229-
Block-28STUDIO224-
Block-28STUDIO926-
Block-28STUDIO928-
Block-28STUDIO229-
Block-29STUDIO424-
Block-29STUDIO926-
Block-29STUDIO127-
Block-29STUDIO928-
Block-29STUDIO229-
Block-210STUDIO424-
Block-210STUDIO926-
Block-210STUDIO227-
Block-210STUDIO1028-
Block-210STUDIO229-
Block-211STUDIO424-
Block-211STUDIO926-
Block-211STUDIO227-
Block-211STUDIO1028-
Block-211STUDIO229-
Block-211STUDIO229-
Block-212STUDIO224-
Block-212STUDIO926-
Block-212STUDIO127-
Block-212STUDIO1028-
Block-212STUDIO229-
Block-213STUDIO424-
Block-213STUDIO926-
Block-213STUDIO227-
Block-213STUDIO1028-
Block-213STUDIO229-
Block-214OTHER10-

Development Works

work_namedescription
Demarcation of PlotsDemarcation of project to be done at site.
Boundary WallBoundary wall will be constructed by brick work / MS railing as per requirement and designed by promoter.
Road Work9 meter wide internal road will be developed by RCC/Interlocking pavers/Bitumen
FootpathsBoth side of road, 1.5 mtr footpath will be developed as per requirement .
Water Supply Including Drinking Water Facilities24 hours Water supply including drinking water facilities will be provided by promoter through roof tank/bore well.
Sewer SystemWill be constructed by promoter
DrainDrainage system will be developed and connected with RWH over flow will be connected with existing Drains.
ParksCommon Park/Green area will be developed as per approved plan and requirements.
Tree PlantingWill be planted as per norms requirements
Design For Electric Supply Including Street LightingCommon ESS developed for Metrocity Township. Electric supply will be provided from ESS. Street lights will be fixed at road berms as per requirements and design.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterS.T.P will be constructed by promoter and treated water will be use in Irrigation of green areas and as per govt. norms.
Solid Waste Management And Disposal SystemSolid waste management and disposal system will be provided as per requirement and govt. Norms
Water Conservation SystemWater conservation system will be provided as per govt. Norms
Energy Management System Including Use of Renewable EnergyEnergy management system will be provided as per govt. norms
Fire Protection And Fire Safety SystemFire safety system will be provided as per approval, Design Norms
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWill be provided as per aproval, design norms
Other Miscellaneous WorkNA

Bank Details

Bank NameAxis Bank
BranchM G Marg Lucknow
Branch AddressGround floor, first floor, 31/93, M G Marg, Lucknow
Account HolderOmaxe Garv Buildtech Collection Account for Omaxe Metro City Commercial-2 Phase-3
Account Number924020041427667
IFSC CodeUTIB0000053

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy