ORANJE CASTLE PHASE-2

SURAJ INFRAVENTURES PVT LTD

Lucknow, Uttar Pradesh

RERA approved

Approved

1st Jan 2025

Completion pending

Pending

9th Jan 2030

Registration No.

UPRERAPRJ748790/01/2025

Project Type

Residential

District

Lucknow

Taluka

Sarojini Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ748790/01/2025
Project StatusNew
Project CategoryResidential
DistrictLucknow
TalukaSarojini Nagar
Start Date2025-01-01
Completion Date2030-01-09
Total Area (sqm)7219
Project Cost (Lacs)9708
Duration (Months)61
Registration Fee41500

Promoter Details

Promoter NameSURAJ INFRAVENTURES PVT LTD
Promoter IDUPRERAPRM724
Mobile99********

Project Team

rolename
ArchitectHARSH CHAUHAN
ContractorSURAJ INFRAVENTURES PVT LTD
Structural EngineerS.N SHARAN

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra249, 253, 255, 317, 3287219.79

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER-NGFSHOP151.500
TOWER-N13 BHK1114.71-
TOWER-N12 BHK198.70-
TOWER-N23 BHK1110.32-
TOWER-N22 BHK198.69-
TOWER-N33 BHK1114.71-
TOWER-N32 BHK198.70-
TOWER-N43 BHK1110.32-
TOWER-N42 BHK198.70-
TOWER-N53 BHK1114.71-
TOWER-N52 BHK198.70-
TOWER-N63 BHK1110.32-
TOWER-N62 BHK198.70-
TOWER-N73 BHK1114.71-
TOWER-N72 BHK198.70-
TOWER-N83 BHK1110.32-
TOWER-N82 BHK198.69-
TOWER-N93 BHK1113.19-
TOWER-N92 BHK198.70-
TOWER-O13 BHK1140.40-
TOWER-O13 BHK1126.10-
TOWER-O23 BHK1140-
TOWER-O23 BHK1112.15-
TOWER-O23 BHK1124.09-
TOWER-O33 BHK1133.65-
TOWER-O33 BHK1115.33-
TOWER-O33 BHK1128.52-
TOWER-O43 BHK1140.00-
TOWER-O43 BHK1112.15-
TOWER-O43 BHK1124.09-
TOWER-O53 BHK1133.65-
TOWER-O53 BHK1114.85-
TOWER-O53 BHK1128.45-
TOWER-O63 BHK1140-
TOWER-O63 BHK1112.15-
TOWER-O63 BHK1124.09-
TOWER-O73 BHK1133.65-
TOWER-O73 BHK1114.85-
TOWER-O73 BHK1128.77-
TOWER-O83 BHK1140.00-
TOWER-O83 BHK1112.15-
TOWER-O83 BHK1124.41-
TOWER-O154 BHK1222.95-
TOWER-PGFSHOP1154.360
TOWER-P13 BHK1121.89-
TOWER-P13 BHK1147.83-
TOWER-P23 BHK1127.53-
TOWER-P23 BHK1146.65-
TOWER-P33 BHK1121.89-
TOWER-P33 BHK1147.83-
TOWER-P43 BHK1127.43-
TOWER-P43 BHK1116.75-
TOWER-P43 BHK1125.02-
TOWER-P53 BHK1121.83-
TOWER-P53 BHK1115.49-
TOWER-P53 BHK1126.981-
TOWER-P63 BHK1127.43-
TOWER-P63 BHK1116.75-
TOWER-P63 BHK1125.02-
TOWER-P73 BHK1121.83-
TOWER-P73 BHK1149.44-
TOWER-P83 BHK1127.53-
TOWER-P83 BHK1146.62-
TOWER-P114 BHK1211.71-
TOWER-A13 BHK1149.34-
TOWER-A13 BHK1126.64-
TOWER-A23 BHK1147.29-
TOWER-A23 BHK1126.24-
TOWER-A33 BHK1149.34-
TOWER-A33 BHK1126.64-
TOWER-A43 BHK1127.42-
TOWER-A43 BHK1116.75-
TOWER-A43 BHK1125.02-
TOWER-A53 BHK1121.89-
TOWER-A53 BHK1116.38-
TOWER-A53 BHK1126.87-
TOWER-A63 BHK1127.42-
TOWER-A63 BHK1116.75-
TOWER-A63 BHK1125.02-
TOWER-A73 BHK1121.89-
TOWER-A73 BHK1116.38-
TOWER-A73 BHK1126.87-
TOWER-A83 BHK1127.42-
TOWER-A83 BHK1116.65-
TOWER-A83 BHK1125.02-
TOWER-A94 BHK1229.68-
TOWER-A124 BHK1264.15-
TOWER-M13 BHK1108.79-
TOWER-M12 BHK199.33-
TOWER-M23 BHK1113.18-
TOWER-M22 BHK198.29-
TOWER-M33 BHK1108.79-
TOWER-M32 BHK199.33-
TOWER-M43 BHK1113.18-
TOWER-M42 BHK198.29-
TOWER-M53 BHK1108.79-
TOWER-M52 BHK199.33-
TOWER-M63 BHK1113.18-
TOWER-M62 BHK198.29-
TOWER-M73 BHK1108.79-
TOWER-M72 BHK199.33-
TOWER-M83 BHK1113.18-
TOWER-M82 BHK198.29-
TOWER-M93 BHK1108.79-
TOWER-M92 BHK199.33-
TOWER-M103 BHK1175.30-
TOWER-M113 BHK1169.73-
TOWER-N103 BHK1188.73-
TOWER-N123 BHK1188.73-
TOWER-N103 BHK1133.55-
TOWER-N123 BHK1133.58-
TOWER-N143 BHK1188.73-
TOWER-N143 BHK1134.72-
TOWER-O95 BHK1246.61-
TOWER-O95 BHK1255.79-
TOWER-O94 BHK1189.57-
TOWER-O115 BHK1246.6-
TOWER-O115 BHK1255.64-
TOWER-O114 BHK1190.5-
TOWER-O135 BHK1246.63-
TOWER-O135 BHK1255.79-
TOWER-O134 BHK1191.63-
TOWER-O16PENTHOUSE1296.95-
TOWER-P94 BHK1178.98-
TOWER-P93 BHK1184.67-
TOWER-A104 BHK1200.4-
TOWER-A104 BHK1190.06-
TOWER-A13PENTHOUSE1303.01-

Development Works

work_namedescription
Demarcation of PlotsWE HAVE PHASE-2 PLOT SIZE IS 7219 SQM FOR 5 TOWERS HAVING 1 MAIN ENTRANCE AND 1 EXIT GATE THE 45M WIDE FRONT ROAD
Boundary Wall2M HIGH AND 230 MM THICK RCC / MS 1 SECTION WORK WHICH GIVE A BEAUTIFUL ICONIC DESIGN BOUNDARY WALL AND WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED.
Road WorkCONCRETE /APEX ROAD WILL BE MADE AT THE SITENTHE BASE OF THE ROAD WILL BE FILLED BY RED MURUM. AFTER THAT 2 LAYER OF AGREEGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD FROM THE MAIN ENTRANCE/ EXIT GATE WE HAVE 100MM THICK 6MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
FootpathsWE WOULD PROVIDE FOOTHPATH THROUGH BRICK TILE. ALL FOOTHPATH IN THE COMPLEX WILL BE IN COMBINATION .SIZE THICKNESS OF 65MM , 80 MM LAID OVER 150 MM .
Water Supply Including Drinking Water FacilitiesWE WILL PROVIDE PUMPS FOR THE REQUIREMENT OF BLOCKS THROUGH PIPELINES AND PUMPED TO OVER HEAD WATER TANK. THE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROMTHE SAID OVERHEAD WATER TANK
Sewer SystemMODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO THE STP AND AFTER TREATEMENTS RE-USE IN FLUSH AND GARDEN. OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM . WHEN COME INFOR FORCE..
DrainSTORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL BE CONNECT WITH MUNICIPAL DRAIN LINE.
ParksWE WILL PROVIDE GREEN AREA WITH THE DIFFRENT ACTIVITIES AND WILL HAVE GAMING FACILITIES FOR KIDS
Tree PlantingWE WILL PROVIDE MANY TYPE OF TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
Design For Electric Supply Including Street LightingWE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRANSFORMER, HT PANEL , LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICES LIKE EXTERNAL LIGHTING, FOUNDATION, STP, PUMP ROOM ETC.
Community BuildingsWE WILL PROVIDE COMMUNITY HALL AND CLUB
Treatment and Disposal System of Sewage and Sullage waterMODELAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND AFTER TREATMENT RE-USE IN FLUSH AND GARDEN. OVERFLOW FROM STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WEHN COME INTO FORCE.
Solid Waste Management And Disposal SystemCOLLECTION FROM DOOR TO DOOR
Water Conservation SystemWE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL.
Energy Management System Including Use of Renewable EnergyWE WILL USE LED LIGHTS FITTING IN INTERNAL AND EXTERNAL AREA AS WELL AS SOLAR LIGHTS. IN PUMP ROOM ALSO ALL THE EQUIPMENT SHALL HAVE ENERGY EFFICIENT MOTOR.
Fire Protection And Fire Safety SystemFIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENTS.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPROVISION PROVIDED
Emergency Evacuation ServicesWE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS
Other Miscellaneous WorkN/A

Bank Details

Bank NamePUNJAB NATIONAL BANK
BranchPUNJAB NATIONAL BANK, LUCKNOW
Branch AddressSPECIAL RETAIL FINANCE BRANCH , GOMTI NAGAR, LUCKNOW
Account HolderSURAJ INFRAVENTURES PVT LTD COLLECTION ACCOUNT ORANJE CASTLE PHASE-2
Account Number4483002900000118
IFSC CodePUNB0448300

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy